Open Compute +48V Busbar Discussion

Slides:



Advertisements
Similar presentations
VL Connector To introduce the VL wire-to-board and wire-to-wire, crimp style connector series.
Advertisements

NetSure™ RDB Series.
J.M. Gabrielse VEX Lifts (Devices that extend upwards) Lab Rats’ 2008 Bridge Battle Robot.
Split Sole 45 Degree Raker
Overview Discuss Test 1 Review RC Circuits
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
DIN Rails By Erik Flum 11/29/06. Background DIN rails are a standardized 35mm metal rail with a hat-shaped cross section. Widely used in Europe, becoming.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
Volume.
Volume.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
RESISTANCE – OHM’S LAW Lesson 5. Resistance  The amount of current flow in a circuit, and the amount of energy transferred to any useful device, depends.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
October 15, 2008 DC Circuits. This is the week that will have been Today Complete Resistance/Current with some problems Friday Examination #2: Potential.
Current & Circuits February ‘08
Dry type transformers Zaragoza Aluminum vs. Copper
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
J.M. Gabrielse Robotics – Bell Work 12/10/2014 On a half sheet of paper, list the types of gears that are used to convert rotational motion to linear motion.
Boosting a Car Battery Cables should have sufficient length (12-16-ft) with #6 gage stranded wire and well-designed clips. Follow the proper sequence of.
Lecture 15 - Timber Wall Framing Example
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
5SL4 10 kA / 5SL6 6 kA miniature circuit breakers
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
FLATPACK Rev.5 September 2002 Updated versions may be available.
Standards Certification Education & Training Publishing Conferences & Exhibits Communication necessary to achieve LowE valve sealing compliance Presented.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
1 Comparison of 100-B and 100-D Contactors B Contactors.
Section 9.4 – Solving Differential Equations Symbolically Separation of Variables.
En. No. : En. No. : Div. : 3 rd EC Sub. : EM topic : Starter.
Ground Planes, Copyright F. Canavero, R. Fantino Licensed to HDT - High Design Technology.
Delta’s Contribution for OCP Solution 2014
VEX Lifts (Devices that extend upwards)
Installation Walkthrough Image Guide
Automotive Electrics Course
Distribution Strategies
Telescope - Mechanical
Creo 1.0 Major Issue Flex Modeling and Drawing Associativity
OCP for Telco The challenge and the solution
Power Supply.
VEX Lifts (Devices that extend upwards)
SC Railing Company Overview
LARP Phase II Secondary Collimator RC1
Com3 2Q1617 Antenna Design Key design requirements
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
THUM Adapter Impact on Hazardous Area Classification
Things You Should Know About Cantilever Rack
EILERSEN The Weighing experts.
6 September 2017 OCP NIC subgroup teleconference
OCP Mezz 3.0 Mechanical Recommendations
5.1 : ELECTRICAL DISTRIBUTION
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
NIC v3.0 Mechanical Discussion
Mechanical Discussion
Mechanical Discussion
OCP for Telco The challenge and the solution
Mastering Autodesk Revit MEP 2016 CHAPTER 19: Creating Equipment
EAT 415 :ADVANCED STEEL BUILDING DESIGN PLATE GIRDER
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
OCP Engineering Workshop 2017
Update on Multi Vendor Interop Project.
Volume.
Chapter 1 Basic Circuit Theory (II)
Custom Switch and Value Added Capabilities
OCP Engineering Workshop Rack & Power, Advanced Cooling Solutions, Data Center Facility
Manifold Topics Infra Mechanical and Thermal Team
Presentation transcript:

Open Compute +48V Busbar Discussion Engineered Power Solutions Open Compute +48V Busbar Discussion

Each Power Section (3) can have 1, 2 or 3 busbars Opportunities with Open Rack There are a few areas within the Open Rack 2.0 standard that remain undefined. In terms of the mechanical requirement of the busbar assembly, there is a gap where rack mount details are missing. This means that ever rack mounts to every busbar differently. It is difficult to design a busbar that will work in many applications for OCP. This is compounded when working towards an “OCP Accepted” certification. The reason is that to be “Accepted” the certification is granted per part number and not general application This is very difficult to achieve at a busbar level due to many variables that tend to be customer specific: Power Requirements Height (OU, OUI, etc.) Location of Power Supplies Mechanism/Locations for attaching the Power Supplies Mounting Criteria for Busbar Each Power Section (3) can have 1, 2 or 3 busbars

OCP Specification To expand upon Rittal’s Options: Amphernol is developing higher power busbars 50 kW 60 kW 100 kW Each of these will add additional SKU Levels:

Management of Power Supply Connections 36 kW Busbar would require (3) 4/0 wires for each potential PowerLug or Busbars from The Power Supply Protective Cage Busbars May need to change these dimensions and/or add studs? Blind Mate Guides Future question is with higher kW requirements, will 3 posts be sufficient? Will the spacing need to change to accommodate larger wire gage?

Example of OCP 48V Busbar SKU Matrix P/N: BBOCP 48 AA BBB PSCCDD EE Rack Manufacturer CW = Chatsworth DT = Delta EN = Emerson FX = Flex RC = Rack Space RS = Rack Solutions RT = Rittal TL = Telect BusBar OCP 48 = 48V Watts 15 = 15kW 36 = 36kW 50 = 50kW Power Supply Location CC = OU(I) of first PS DD = OU(I) of 2nd PS Rack OU or OUI XXU= “#”OU XXI = “#”OUI

Not all Power Ratings are the Same! Power Zones Not all Power Ratings are the Same! Regarding the Topic of Power rating for an entire rack. A 36kW rack for example can be configured with a Single Power Zone, a Split Single (Dual), or (3) 12kW Power Zones. It is our suggestion that the number of Power Zone(s) should be considered when rating the busbar in context to the rack. A single 36kW power zone bubar will have more copper mass than a Split Single Zone 18kW busbar. PS PS Busbar Busbar PS PS Single Power Zone Dual Power Zone

Power Supply Location Another challenge is the location of the Power Supply(ies). This becomes a particular challenge with the full length busbars (~42 OU). As a power solutions provider, the preference would be a central location to minimize the copper usage or increase the power availability For example, the design of a 36 kW busbar with the power supplies centrally located will minimize the copper needed to support this power level (half the power for each busbar leg) vs. locating the Power Supplies either top or bottom which will require the support the full power (~950A at minimum voltage) PS Larger Busbar Busbar PS PS Centrally Located PS Top Located

Copper Sizing Calculation Busbar current ratings can vary from vendor to vendor. Should we reference in section 3.2 for the 48V OCP spec a variable for determining power rating based on cross section area of copper. A 30 degree C T Rise. In the development of Busbars we use a very easy to remember formula of: 5A / mm2 This has been supported by Simulation and Load testing by groups within Amphenol (AIPC and AFCI).

Touch Proof Requirement – Open Rack 2.0 Section 2.5 IEC60950 requires a finger probe test as shown in the below images.

THANK YOU! Busbars Power Assemblies Connectors PowerLugs Cable Assemblies