Project Development and Managing your Build Agenda

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Advertisements

Background Presenters Work done in preparation for WHS changes
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Major works RESIDENTIAL LEASEHOLD EXPERTS. THE BASICS Your Landlord has a duty to you and all Leaseholders in the property, to properly and continually.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Contractor & Owner Roles in Health & Safety. Safety Topics Contractor Role in Health and Safety Owner Role in Health and Safety.
Southside United FC Proposed Management Roles. OVERVIEW To ensure the club committee is effective in its tasks of setting and implementing the clubs direction.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Processing Major Repair Application from DSS School REO’s Perspective 1.
Construction Contracts and Project Delivery Methods
Compensation events and claims Presented by Prof. Khem Dallakoti.
The New Building Standards System Completion certificates.
Specification & Quantities Estimating
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Permit Process & Application Guide
NRA HD 16 Inspections of Temporary Safety Measures Alastair de Beer, Chartered Engineer, MIEI NRA Project Manager (Safety) April 2012.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Project financial reporting Linda Wormö April 20th, 2016 – Faroe Islands.
Serving the people of Cumbria Do not use fonts other than Arial for your presentations Commissioning of Transport Services Eden; South Lakes and Keswick.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Dinnington Business Centre Outgang Lane, Dinnington
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Mike Ellis Executive Director – Property + Projects
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Roles and responsibilities PM
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
CONTRACT ADMINISTRATION
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Content of Tender Dossier Instructions to Tenderers
Administration of a FIDIC Contract - Pre-Contract Phase -
APARTMENT BLOCKS – DEALING WITH DEFECTS
RIBA Plan of Work 2013.
- Period before Tenders Submission –
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Safety Responsibilities
Infrastructure Cost Mitigation
Temporary Works Co-ordination
Congratulations, your application has been successful… …what next?
SAFETY | TRAINING | CONSULTANCY| STAFFING SOLUTIONS
Training Appendix Revised January 2018.
Quality Management Systems – Requirements
Pre-contract Planning and Practice
Introduction to building contract
Suzanne Bainton Liston & Company
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
THE EMPLOYER Right, of access to the site.
Effective Building Control System
TCU-PROJECT: 7TH Semester Course
Management Verifications & Sampling Methods
Insurance, Liability and Indemnity issues for Assigned Certifiers
The assigned certifier conference 2019
Preparing for a Stack Test
Construction Contract Administration
Construction Management Services April 16, 2018
Effective Construction Safety Management
RIBA Plan of Work 2013.
Client Process Pack.
Presentation transcript:

Project Development and Managing your Build Agenda 3. Introduction 4. Stage 1 5. Stage 2 6. Stage 3 7. Stage 4 8-16. General Guidelines To Compliance with Regulations 17. Q & A

Introduction This module sets out the process for Clubs who have availed of a Sports Capital Grant and gives general advice to Clubs as to how to manage their individual  Project. Overall Plan and Vision. Viability.

Stage 1 Appoint a Club Committee and Club Coordinator for the project. He/she will be familiar with the building process and be willing to liaise with Design Team Builder, Sports Capital Programme and Report to the committee and club at various stages of the process.  Planning in Place.  Is planning required . If not why not. Sports Capital Funding in Place. Level of Grant available. Own funding available. Conditions of grant drawdown.

Stage 2 Design Team and Club Coordinator. Cost estimates in place. Design team can be one person dealing with the  full project from Planning to completion or a combination of Architect, Engineer, Quantity Surveyor. Mechanical and Electrical Engineer and Specialist in Pitch design. There may be some of these already in place if the Planning process has been carried out.

Stage 3 Procurement Contractor has to be appointed in an open and fair manner and process. Contract documents should be sent to six contractors who are deemed suitable, and tenders opened and checked by the Committee. E tender requirements. Contractor should be appointed on the basis of Cost, experience and ability to complete within the timeframe.

Stage 4 Contract Details Following a signed Contract, notification of all insurances to the FAI insurance body and the appointment and assignment of all relevant parties, the Club coordinator will have to set up a series of meetings during the course of the contact to include the design team and builder and ensure that the works are progressing in accordance with the plans and specifications, ensuring that there are no changes and costs are in line with the contract as signed. Any alterations need to be noted to the Club and managed accordingly. Stage payments will have to paid as Certified by the QS or as agreed at stages e.g. Foundations in place etc. Completion of the works will require a snag list to be completed and retention money being held on the Contractor for an agreed time (usually 5% for 6 months). This ensures that any defects will be dealt with by the Contractor within that time. All sign off and certification is required prior to final drawdown.

GENERAL GUIDELINES TO COMPLIANCE WITH REGULATIONS BACKUP SLIDES GENERAL GUIDELINES TO COMPLIANCE WITH REGULATIONS

Planning Permission Is Planning Permission in Place? Is it a requirement……..if not why not? Is planning in date? Are there planning conditions requiring further submission prior to starting works Planning generally in place for 5 years but can an extended for a further 5 years if time is running out

Fire Safety Certificate A requirement for all commercial/residential properties except individual houses Works cannot proceed without a valid FSC in place This will include Proper exit width Wall and ceiling finishes Fire separation Fire Prevention Building Capacity

Disability Access Certificate Necessary to be in place prior to occupation of the building This will include Proper parking Access Facilities inside and outside the building Signage & Colour Coding for doors

Commencement Notice This is carried out on line to the Local Planning Authority The application form details of the following: Assigned Certifier Designer Owner Builder The Assigned Certifier and Designer are usually the same Names are required for the Owner and the Builder The owner must accept ownership and nominate the other parties who must in turn accept their various roles

There are three types of submission for the Commencement Notice Submission with Documentation: This will require plans and building details, particularly foundation and compliance with Part L (Energy and Insulation) and a copy of the Fire Safety Certificate. 7 Day Notice: This is submitted with the plans as above but the Fire Safety Cert is not in place, but applied for and acknowledged by the Fire Authority Submission without Documentation: This is for a development which required planning but not a Fire Safety Cert or Disabled Access Cert e.g roadway, fencing, drainage or pitch development but NOT a building The works have to be certified at the completion stage and a final submission issued to the Local Authority.

Contractual Requirements Generally a contract between the Club or Organisation and the builder will have to be drawn up and signed prior to works being carried out This can be done on the standard RIAI contract which includes or excludes quantities. It should be fixed price and include: The contractors insurance (Which needs to be referred to the Clubs insurance Company) Start Date Finish Date Stage Payment Schedule Health & Safety Documentation

Health & Safety Prior to commencement the following is required: Preliminary Health & Safety Plan carried out by the Clubs Architect/Engineer or a health & Safety Consultant. This assigns the role of PSDP (Project Supervisor Design Process) and outlines the building and associated risks within the site. The builder must then produce a Health and Safety Plan and assign a PSCP (Project Supervisor Contract Process). The Health & Safety Authority must be notified with the submission of a AF1 Form by the designer and an AF2 form by the Builder. It is important to have these in place as inspections may be carried out without notification by the HSA.

Sign Off On completion the works must be signed off by the Assigned Certifier/Designer for the drawdown of the grant and a submission made to the Local Authority that works are complete.

Questions & Answers

Thank You