Facilities Report to the Buffalo State College Senate May 6, 2016

Slides:



Advertisements
Similar presentations
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Advertisements

MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
PAC/Garage/SCP South Campus Traffic Flow Logistics 6/28/2011.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Administration & Finance November 18, 2014 Utility Corridor and Roadway Relocation Project Update (UCRR)
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
Science Research Laboratories (formerly PSL and LSL) 23,111 GSF $24 million Total Project Cost (PUF and RFS) November 2010 Completion 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
8/26/20151 Building a Legacy Rebuilding Providence Public Schools 2009 Q1 Report.
Facilities Modernization Program Funded by Measure B Project Report October 20, 2014.
1 Educational and Facilities Master Plan Update Dr. Richard McCullough President Saddleback College Dr. Glenn Roquemore President Irvine Valley College.
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
FEBRUARY 24, 2014 University Building and Grounds Committee Report.
10/19/20151 Building a Legacy Rebuilding Providence Public Schools 2008 Q1 Report Volume III.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Holland High School Construction Update June 8, 2011.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
AUBURN UNIVERSITY Capital Projects Program Facilities Management
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
New Building Construction Plan Neighborhood Briefing November 19,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Joplin Schools Bond Issue Information February 9, 2012.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
South Greenville Recreation Center and Park Master Plan.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Vision for the Future Spring 2016 Campus Open Forum APRIL 7, 2016 STUDENT CENTER CONFERENCE ROOM.
Budget Overview and Facility/Master Plan Update September 3, 2010.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Infrastructure Revitalization Project
Facilities Management
Windsor C-1 School District Planning 2017
Cuba-Rushford CSD Capital Project
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
Building Services Summer 2016 Update
Construction Report March 24, 2009.
Community Forum 2017 Project Overview UNIVERSITY OF UTAH.
Lane Center for Academic Health Sciences – Now Open
FLCC GENEVA CAMPUS CENTER PROJECT
Chabot College Facilities Priorities
VCSD Capital Project Community Forum
Update on Student Housing
2013 Fall Faculty Conference
VCSD Capital Project Forum
Plant & Facilities Department
Facilities Update November 17, 2017
Facilities Modernization Program
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Transportation Alternatives (TA) Set-aside
Capital Improvement Program
UNION GROVE ELEMENTARY REFERENDUM
College West Residence Renewal Project
2013 RTS Campus Improvement Project
The summer of 2018 and all the work that has taken place
Facilities Modernization Program
Walter Reed National Military Medical Center, Bethesda
Projects in the Pipeline
Steam Utility Replacement Project Description
The Paterson Redevelopment
Presentation transcript:

Facilities Report to the Buffalo State College Senate May 6, 2016

SUNY Construction Fund: Funding and Projections $6.7M projected annually $8.7M $7.3M 5-year capital plan: $24M - $25M per year for critical maintenance

Project Recently Completed Science and Mathematics Complex, Phase 2 Winter 2015/16 $30.9 million SCIENCE AND MATH PHASE 2 The Science and Math Phase 2 building was not used during spring 2016, but will be used this summer.  Classes have been scheduled for summer sessions and all faculty will move immediately following commencement.

Projects in Construction, Summer 2016 Caudell Hall Renovation Fall 2016 $21.2 million Athletics Projects Fall 2017 $3.2 million Buckham Hall B-Wing Summer 2017 $8.2 million Elmwood Bridge over 198 Fall 2016 Greenleaf Housing Development Summer 2017 CAUDELL HALL: August 2016: Fences down and sidewalks open Early fall 2016 (start of fall semester): Construction completed and parking restored Late fall 2016 (end of fall semester): Furnishing and equipment complete January 2017 (winter break): Occupancy January 2017 (start of spring semester): Return to full use   BUCKHAM HALL: Now until August 2017: A portion of (student) Lot R-13 is offline August 2016 to August 2017: Building entrance between A and B wings will be closed Through August 2017, disruption to the occupied portions of A Wing will occur due to noise of construction work in the B Wing: The Speech-Language-Hearing Clinic will be most affected because its entrance is through the A/B Wing lobby.  We have already arranged for a new entrance route with dedicated parking.  Most clients arrive after 5pm and construction ends at 3pm so director Karen Bailey-Jones doesn’t foresee a big problem.  There are a few offices for Criminal Justice faculty nearby and a couple of general purpose classrooms where there may be objections to construction noise at times.  We have taken the closest classroom off-line for this reason. ATHLETICS PROJECTS: To improve athletics facilities Buffalo State will install lighting at Coyer Field; resurface the outdoor running track; renovate the Sports Arena locker rooms; replace the indoor track in the Sports Arena; and replace the telescopic bleachers in the Sports Arena. Only minimal impacts (such as temporary closure of the tracks while they are being improved) are expected over the course of this multi-part project. GREENLEAF HOUSING DEVELOPMENT: Due to its location, this project is not expected to cause significant impacts to the campus. ROCKWELL ROAD: During summer 2016 we expect lane closures at various times. ELMWOOD BRIDGE OVER 198: Disruptions (lane and ramp closures) will continue through the summer and fall, concluding in late fall or early winter 2016. Estimated completion is late November, with a contract completion date of December 31, 2016.   Rockwell Road Construction Summer 2016 Summer 2016 $21.2 million

Roof Repairs, Summer 2016 Bulger Communication Center Upton Hall Buckham Hall ROOFING REPAIR During summer 2016, roof repairs will cause short term loss of parking and grounds used as staging areas) near these six buildings: Buckham Hall Bulger Communication Center Butler Library Campbell Student Union Upton Hall Twin Rise   Butler Library Twin Rise Campbell Student Union

Projects in Planning and Design, Summer 2016 Science & Math Complex, Phase 3 Summer 2019 $33.7 million Upton Hall, Phase 1 $4 million Jacqueline V. LoRusso Alumni House and Visitor Center $5.4 million Center for Academic Success, Butler Library $10 million SCIENCE AND MATH COMPLE PHASE 3: Fall 2016: Construction begins. Significant impacts are anticipated because the project will include both demolition and construction work in close proximity to other buildings: Our construction phasing plan and site logistics plan were developed specifically to minimize the impact on pedestrian traffic and assure safe access/egress.  We are requiring demolition to be done in very controlled conditions to assure safety.   We will wash down the facades of Perry Hall and the Classroom Building after demolition to remove the inevitable dust (even though we will require wetting of materials being demolished).  There is little we can do however about the noise, particularly for the exterior brick saw-cutting and foundation pile driving. Safe pedestrian and emergency vehicle access routes around campus will be maintained at all times, but there will be closures of surrounding routes at various times throughout the project period.  No changes to the current parking arrangements are anticipated. Bishop Hall Summer 2018 $16.1 million Steam Plant Study Fall 2016 $150,000

Projects in Planning and Design, Summer 2016 Great Lakes Center at Buffalo State: Dock Replacement $500,000

Questions or comments?