1 Walter Reed National Military Medical Center, Bethesda
Town Hall Meeting Hear ye, hear ye! Graphic is architect’s rendering showing additional building being added to the north and south of Building 1. Northern building (left) is outpatient care; southern building is inpatient care. (Note – Graphic should be considered pre-decisional until Environmental Impact Statement Record Of Decision is signed.) ASD(HA) has expressed some concern about current design asserting that it does not “define” the Medical Center; NAVFAC has responded that exterior design could be reworked until as late as March/April 08 but redesign would have to be coordinated with National Capital Planning Commission and State Historical Preservation Organization. Current design has been cleared by those agencies. May 14, 2008 Defining the Future of Military Medicine

2 Emergency egress points have changed
Remember… Construction Fence Phase Yellow – 09 May 2008 Lose access to “F” parking Lose access to Bldg 1 via Wood Rd. Close Lot F - 12 May 2008 Construction Fence Phase Red – 01 June 2008 Lose access to “A” parking (Staff) and “L” parking (visitor) – 14 June 2008 New construction gate of 355/Rockville Pike Construction Trailers arrive – 13 May 2008 Building 12 demolition begins within the week Establish Transition Team Phasing plan from CBB for review by Govt. Emergency egress points have changed Emergency egress points have changed

3 Phase 1 – Yellow Fence Lines
Start Date: 09 May Fences off area for construction field offices in front of Building 1 Trailers arrive 10 May Prohibits access to Wood Drive in front of Building 1 Eliminates parking in front of Building 1 South fence equipped with a gate to permit emergency access Access to lots A, L, and Presidential Drive not affected Construction of temporary access road to begin in mid-May

4 Phase 2 – Red Fence Lines Start Date: 01 June – Fence installation 14 June – Close parking lots A&L North - Fences off construction area for Building A and parking garage Interim access to parking lots A & L will be provided through fencing until excavation begins on 14 June South – Creates secure barrier between temporary construction road and the rest of campus Creates new gate from MD 355 for temporary construction road access Establishes a security, badging, and inspection area for construction traffic to be manned by CBB personnel

5 General Staff Parking Lot D Lot E Lot G Stone Lake Rd Lot K Lot O
Lot H Lot I