CONSTRUCTION DRILLING INC.

Slides:



Advertisements
Similar presentations
Safety in Excavation.
Advertisements

Groundwater What is it and why is it important?
Cofferdam.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
PILE FOUNDATION.
Alert: Waste Spill Environmental Science. Artesian well.
Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated.
Greenwich Peninsula.
Environmental Drilling By: Josh Humphreys October 8,2006.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
FIXED MARINE STRUCTURES
Foundations Purpose – To transfer weight of structure (including live loads) to the ground within allowable settlement criteria.
Lecture 4 Excavating and Lifting
Hickory Hills Lake Management Committee Erosion Control sub committee Tom BertramJane Blake.
TRENCHING AND EXCAVATIONS
1 Excavations Best Practice Excavations. 2 Agenda - Introduction Statistics Excavations - Best Practices Question Period.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
Groundwater Control Affects design of: –Permanent Works –Temporary Works May affect viability of scheme Safety Issues –May cause instability of excavation.
Risk Management Department
Project details • New headquarters for HKSB
Remediation of Heavily Congested Urban Site Toronto, ON, Canada
PILING IMPLICATIONS FOR A NEW INDUSTRIAL DEVELOPMENT ON A CLOSED LANDFILL SITE By Michael Redfern.
Foundations Excavations
Soils - HDM Chapter 9 All pictures from HDM Ch 9.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
Hybrid Pile n Definition –A pile installed by combining driven and auger/drilled techniques. n Why use a ‘Hybrid’? –by incorporating a ‘driven element’,
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
G3 – Environmental Geomechanics (Dr Sam Yuen)
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
PILE FOUNDATION BY-.
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
Bridge Engineering (4) Foundations – Caisson Foundations 1. *Caisson foundations 1.1 IntroductionIntroduction A caisson is basically a structure.
Chapter 18 Foundations.
Department of Civil Engineering,
Latest Advancements in Instrumentation, Monitoring and QA/QC Techniques for Deep Excavation Support Systems: Al Hilal Project, Abu Dhabi – A Case History.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Environmental Drilling By: Josh Humphreys October 10,2006.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Site Work.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
Foundation Loads Dead Load Live Load Wind Load
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
BUILDING CONSTRUCTION
COFFERDAMS.
BEARING PILES: H-PILE. BEARING PILES  Structural element, a post or pile, which transfers the weight of a foundation to soil that can support it.  Ideal.
CAISSON FOUNDATION.
Deep Replacement Presented by: M. Taromi
DIAPHRAGM WALLS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
S.T.B.S. College of Diploma Engineering
Excavation & Trenching Awareness Plus
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
AN OVERVIEW OF SHALLOW AND DEEP FOUNDATION SYSTEMS
Substructure Groundworks - Hazards
Soil Improvement.
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
SUSTAINABLE DRILLING OF OIL & GAS WELLS
B.V.Patel Institute of Technology-Diploma studies
CT Reinforced Earth Structures
Arch205 Materials and building construction 1 foundation
CONSTRUCTION METHODS & TECHNOLOGY
Abandoned uranium mine
Arch205 building construction foundation
Steps To Prepare Site For Site Work Construction Calhoun GA.
Presentation transcript:

CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING, FOUNDATION AND CONTAINMENT SOLUTIONS

25 YEARS OF EXPERIENCE ROCK AND SOIL DRILLING CUT-OFF/DIAPHRAGM WALLS PASSIVE GROUNDWATER TREATMENT WALLS ACCESS SHAFTS DRILLED SHAFTS OSCILLATOR/ROTATOR DRILLED SHAFTS SECANT PILE WALLS SOLDIER PILE WALLS SHORING WALLS BUILDING AND BRIDGE FOUNDATIONS EXCAVATION SUPPORT SHEET PILES GROUNDWATER EXTRACTION WELLS

ROCK AND SOIL DRILLING 150mm to 3500mm DIAMETER DRILLS ACCESS SHAFTS UP TO 18m DIAMETER COMPLETED DEPTHS REACHING OVER 100 METERS DRILLING IN MARINE AND LAND BASED ENVIRONMENTS DRILLING THROUGH ALL SOIL AND ROCK CONDITIONS

CDI DRILLING SYSTEMS

BARBER DR40 DRILLS THROUGH SOIL AND ROCK EFFICIENTLY DRILLS OVER 100 METERS DEEP DRILLS UP TO 1m DIAMETER MOBILE QUICK SETUP

WIRTH PILE TOP DRILL DEEP DRILL DEPTHS (Over 100m) DRILLS THROUGH ALL SOIL AND ROCK CONDITIONS UP TO 3.5 METER DIAMETER REVERSE CIRCULATION CLOSED LOOP SYSTEM

WIRTH DRILL WATER RECYCLING

HYDRAULIC AUGERS DRILLING/AUGERING QUICK SETUP MOBILE 406mm- 3000mm DIAMETER

DOWN-HOLE HAMMER DRILLS THROUGH OVERBURDEN AND HIGH STRENGTH ROCK CASING ADVANCE SYSTEM UP TO 2.4 METER DIAMETER

LODRIL LOW HEAD ROOM WORKING CONDITIONS ROUGH TERRAIN MOBILE DRILLS 60 FEET DEEP

ROTATOR CDI DESIGNED AND BUILT ADVANCE CASING THROUGH ALL SOIL AND ROCK CONDITIONS UP TO 1000mm DIAMETER COMPACT VERSATILE

MARINE APPLICATIONS

WORKING IN ENVIRONMENTALLY SENSITIVE AREAS

TANGENT WALLS

DRILLING IN ALL TERRAINS

TRANSPORT BY RAIL

WORKING ON SLOPES

POINT SOURCE CONTAMINATION REMOVAL IDEAL FOR; SITES WHERE PLUMES AND CONTAMINATED AREAS CAN BE DELINEATED SITES WITH LIMITED SPACE WHERE CONVENTIONAL EXCAVATION IS NOT PRACTICAL CONTAMINATION IS DEEP IN THE GROUND EXAMPLE: DRY CLEANERS, GAS STATIONS, COMMERCIAL PROPERTIES, SITES WITH PROPERTY LINE ISSUES.

CUT-OFF and DIAPHRAGM WALLS PREVENT UNDERGROUND MIGRATION OF CONTAMINANTS GROUNDWATER CONTROL GEOTECHNICAL AND STRUCTURAL CAPABILITIES (shoring, slope stabilization) EXCAVATION SUPPORT (vertical walls) PASSIVE WALLS ACTIVE FILTRATION OF GROUNDWATER

TYPICAL CUT-OFF WALL OPERATION

CUT-OFF WALLS ENABLE VERTICAL EXCAVATION

COMPLETED WALL

TYPICAL USE OF SECANT DESIGN AS STRUCTURAL WALL

SECANT WALL SHORING

SECANT REINFORCEMENT DESIGNS EXTRA REINFORCEMENT

CLOSE PROXIMITY TO PROPERTY LINES AND BUILDINGS

LOW DISTURBANCE INSTALLATION

CASE STUDIES

SECANT PILE WALL, Victoria BC CHALLENGES FORESHORE INSTALLATION OF SECANT WALL BOULDER AND RIP RAP SUBSTRATE CAISSONS 12 METERS BELOW SEA LEVEL TIDAL INFLUENCE CONCERNS OF CAISSON DEVIATION

SECANT PILE WALL, Victoria BC

SECANT PILE WALL, Victoria BC SOLUTIONS INSTALLATION OF EARTH BERMS TO CONTROL RUNOFF SPECIALLY DESIGNED TOOLS FOR DRILLING AND REMOVING OBSTRUCTIONS PUMPS AND BAILERS TO REMOVE WATER SPECIALIZED TREMMIE PIPE SYSTEM FOR POURING CONCRETE UNDER WATER DESIGN AND BUILD GUIDE WALL FOR ACCURATE CAISSON ALIGNMENT

WALL GUIDE

SECANT PILE WALL ACCESS SHAFT CHALLENGES SUB-SURFACE LAYER OF FRACTURED ROCK HIGH GROUNDWATER INFLOW RATE RUNNING SAND AT 10-12 METERS DRILLING THROUGH BOULDERS

SECANT PILE WALL ACCESS SHAFT

SECANT PILE WALL ACCESS SHAFT SOLUTIONS ADVANCE SOCKET THROUGH FRACTURED LAYER UTILIZE SPECIAL TOOL TO REMOVE SAND MAINTAIN STATIC WATER PRESSURE TO PREVENT SAND FROM RE-ENTERING CAISSON

SECANT WALL GUIDE

HEALTH & SAFETY AND ENVIRONMENTAL PROTECTION COR CERTIFIED COMPREHENSIVE HEALTH AND SAFETY PROGRAM Toolbox Meetings Safe Work Practices Hazard Control Procedures Near Miss Reporting SPILL RESPONSE TRAINED EXPERIENCED SUPERVISORS/FOREMAN

CONSTRUCTION DRILLING INC. SUMMARY “CONSTRUCTION DRILLING INC. HAS BEEN ON THE LEADING EDGE OF DESIGNING NEW EQUIPMENT AND ADOPTING DIFFERENT DRILLING TECHNIQUES FOR OVER 25 YEARS. THIS HAS ENABLED CDI TO COMPLETE SOME OF THE MOST DIFFICULT DRILLING PROJECTS UNDERTAKEN IN THE INDUSTRY”

CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING, FOUNDATION AND CONTAINMENT SOLUTIONS