2K Cold Box Mechanical Design

Slides:



Advertisements
Similar presentations
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Advertisements

1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Hydronic Mechanical Controls
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Overview of the ESS Linac Cryogenic Distribution System
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Installation Package - Electrical
Technical Procurement Plan
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Teleconf ACS – FREIA 28th March 2017
Cryoplant Controls Installation
HYDRAULIC AND PNUEMATIC ACTUATION SYSTEMS
Installation of the T600 at Fermilab
Process Requirements and Design Approach
Cryogenic Plant Electrical and Controls
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
2K Cold Box PDR Introduction
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
Cryoplant Installation Overview
Cryoplant Installation Scope
Overview of Mechanical Design
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
LARP Vertical Test Facility
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
2K CB FDR Overview:  Agenda, Charge, Review Process
SC1R Cold Box PDR Mechanical Design
2K Cold Box Process Design
Teleconference ACS – FREIA 20th February 2018
Pressure Piping Analysis
LCLS-II Cryoplant Controls FDR Status of Past Reviews and Lessons Learned Dana Arenius Sept 13, 2017.
Scope, Requirements Deliverables & Schedule
Overarching Commissioning Plan
HAZOP Guidewords Base Set
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Safety Fabrication, assembly, and installation
CryoPlant Commissioning
SNS PPU Cryomodule Instrumentation
SC1R Cold Box PDR Assembly Sequence
CRYOMODULE FINAL ASSEMBLY
JLAB CHL 2K COLD BOX REPLACEMENT
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

2K Cold Box Mechanical Design Nate Laverdure LCLS-II 2K Cold Box FDR March 28, 2018

Status of design outputs Outline Status of design outputs Complete subsystem design Complete technical specifications for build-to-print fabrication, shipping, installation, and integration Outline plan for configuration change

Documentation list Title Status 79222-S003 Technical Specification for Initial Construction of LCLS-II 2K Cold Box Released 79420-S004 Technical Specification for SLAC LCLS-II Cryogenic Multi-Layer Superinsulation (MLI) Requirements and Installation 79222-D6001 LCLS-II 2K Cold Box Drawing Index 79222-0000 LCLS-II 2K Cold Box with Cold Compressor (SCB) Flow Diagram (P&ID) Released Rev J 79222-0020 LCLS-II 2K Cold Box Complete Assembly and all mechanical and electrical sub-assemblies Released Rev A 79222-A0003 LCLS-II 2K Cold Box Valve Panel Anchorage & Structural Analysis 79222-A0002 LCLS-II 2K Cold Box Vacuum Skid Anchorage & Structural Analysis

Design documentation 79222-S003 Technical Specification for Initial Construction of LCLS-II 2K Cold Box

Design documentation 79222-D6001 LCLS-II 2K Cold Box Drawing Index

Mechanical drawing package structure 79222-0020 Complete Assembly 79222-0021 Instrumentation Installation 79222-0022 Utility Installation 79222-0026 Anchor Installation Gauge panel and two electrical enclosures Valve panel and several utility piping spools 79222-0139 Insulating Vacuum System 79222-0027 Shipped Assembly Structured to minimize mechanical reassembly work on SLAC site

Mechanical drawing package structure 79222-0020 Complete Assembly Includes all installation, outfitting of all external piping and external instrumentation 79222-0021 Instrumentation Installation 79222-0022 Utility Installation 79222-0026 Anchor Installation Gauge panel and two electrical enclosures Valve panel and several utility piping spools 79222-0139 Insulating Vacuum System 79222-0027 Shipped Assembly

Mechanical drawing package structure 79222-0020 Complete Assembly 79222-0021 Instrumentation Installation 79222-0022 Utility Installation 79222-0026 Anchor Installation GC scope Offloading Anchoring in place Gauge panel and two electrical enclosures Valve panel and several utility piping spools 79222-0139 Insulating Vacuum System 79222-0027 Shipped Assembly

Mechanical drawing package structure 79222-0020 Complete Assembly Complete 2K Cold Box vessel including vacuum shell, internal piping, internal instrumentation In shipping configuration for transport to SLAC 79222-0021 Instrumentation Installation 79222-0022 Utility Installation 79222-0026 Anchor Installation Gauge panel and two electrical enclosures Valve panel and several utility piping spools 79222-0139 Insulating Vacuum System 79222-0027 Shipped Assembly

Review of mechanical details General arrangement, location of interfaces Configurations and bayonet installation/removal Mechanical design details Thermal reliefs Cold compressor installation Bellows/straightener assembly Heater assembly Central support column

Interface locations – main cryogenic process interfaces He-505 CC6 suction He-504 CC5 discharge He-506 CC6 bypass He-501 2k suction from linac He-507 30K to 4KCB He-508 4K fom LHe dewar

Interface locations – warm utility interfaces He-515 Relief valve discharge collector He-511 3 atm He supply GV-512 Guard vacuum IA-513 Instrument air CW-517 & 518 Cooling water supply & return He-510 Cleanup return to recovery system

Interface locations – warm utility interfaces

Design considerations for future configuration change Changes to two piping spools U-tube configuration change

Future configuration change – affected piping spools CC1 INLET FROM TRANSFER LINE CC2

Future configuration change – affected piping spools Abandoned in place Removed spool Cut locations Replacement spool Cut locations 79222-0061 79222-0062

Future configuration change – proposed sequence Process conditions Linac warm, 1 atm Backfill insulating vacuum and make entry Peel back insulation, cut piping, remove spools All cuts are in vertical orientation for cleanliness Spools can be removed through manway No instrumentation on removed spools CC1 suction and discharge piping abandoned in place, can be secured to vacuum shell

Future configuration change – proposed sequence Insert new spool, weld Spool can be inserted through manway No instrumentation located on new spool QC checks ASME B31.3 pneumatic leak check Sensitive helium leak check Insulate Clean up Blowdown, pump, & backfill process piping Pump down insulating vacuum

Cold box configurations – u-tubes Size Both SCB-MCB-CCR 5-3/16” LHD-SCB-VAP-03 3-1/8” High flow - CC-1 through CC-5 SCB-CC6-BYPASS Low flow - CC-2 through CC-6 SCB-CC5-CC6

Cold box configuration control Bayonet installation/removal procedure

Bayonet installation/removal procedure

Thermal relief assembly All 2K Cold Box cryogenic reliefs are: Thermal reliefs ASME reliefs Protected against air contamination via guard vacuum enclosure Exhausted to header which is protected against moisture entry and vented outdoors

Thermal relief assembly

Thermal relief assembly Relief inspection/replacement process: Warm up 2K Cold Box and bring to 1 atm Backfill relief exhaust header with 3 atm He purge Break fittings around relief shroud and remove Disconnect relief flange and install blank while under purge Inspect/test relief on bench or replace Disconnect blank and install relief while under purge Re-install relief shroud Pump relief exhaust header to guard vacuum and backfill with 3 atm He purge

Mechanical details – cold compressor installation

Mechanical details – cold compressor installation

Mechanical details – bellows/straightener assembly Used in CC-1 and CC-2 inlet piping spools

Mechanical details – bellows/straightener assembly Cleanup of stagnant annular volume Recommendation: Large virtual leak exists between flex ID and process piping. Need to address this. Response: 12x 1/8” holes to facilitate pump and backfill of annular space

Mechanical details – heater assembly Scaled from SNS and earlier heater designs

Mechanical details – control valves

Mechanical details – internal piping support Only 1 permanent support required for the design Located on the heater assembly (small heat in-leak has no adverse effects)

Mechanical details – insulation

Mechanical details – manway Based on 30” design used at JLab 4K Cold Box

Mechanical details – central support column Maintains flatness of top plate during assembly Threaded rods and nuts for leveling during installation Shims inserted between flanges to carry large compression load And during operation Encased in passive copper conductor Insulated with MLI Thermal deflection limited to a few thousandths

Mechanical details – vacuum pumping system

ES&H design considerations – ODH 2K Cold Box located in the cold box building, a class 1 ODH area Mitigations: Warning Signs Installed Oxygen Monitor Ventilation Training for personnel

ES&H design considerations – noise DOE standard: no personnel exposure to noise above 85 dBA without hearing protection Noise generated by all cold compressors is expected to be lower than 85 dB when measured from 1 m distance from equipment No hearing protection needed inside the cold box room

ES&H design considerations – fall protection Cold Box top plate height: 12.5 feet Safe access to components located on the top plate is provided by a work platform

ES&H design considerations – egress & work access 180-degree access around bayonets for system configuration changes Access on at least 1 side of control valves, relief valves, cold compressors, and feedthroughs for maintenance ~24” aisle width or more for egress from work areas

ES&H design considerations – confined space Design minimizes the requirement to work within the 2K CBX insulating vacuum enclosure Cold compressor motor cartridges installed via bolted flange connections on the top plate Flange provided on top plate for ventilation

Maturity of design is commensurate with FDR Summary Maturity of design is commensurate with FDR All design outputs are complete and approved Mechanical and electrical drawing set Technical specification and included references Proceeding with approved procurement of 2K Cold Box vessel