Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 1 of 16 Discounted Cash.

Slides:



Advertisements
Similar presentations
Costs and Benefits.
Advertisements

Cross-Border Infrastructure: A Toolkit Financial Analysis Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed.
Learning Objectives for Section 3.2
Financial Management Series Number 3 Using Net Present Value To Evaluate The Value of Money Over Time Alan Probst Local Government Specialist Local Government.
Review of Exam 1.
1 The Time Value of Money Learning Module. 2 The Time Value of Money Would you prefer to have $1 million now or $1 million 10 years from now? Of course,
Time Value of Money Time value of money: $1 received today is not the same as $1 received in the future. How do we equate cash flows received or paid at.
Saving and Investing.
Chapter 6 Trade-Off Between Risk & Return
Present value, annuity, perpetuity
The Time Value of Money Learning Module.
Chapter Organisation 6.1 Bond Valuation 6.2 Common Stock Valuation
Chapter 5: Time Value of Money: The Basic Concepts
Rate of Return Multiple Alternatives Lecture slides to accompany
Key Concepts and Skills
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 23 Yield Capitalization — Theory and Basic Applications.
The Trade-off between Risk and Return
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Asphalt vs. Concrete Example Slide 1 of 18 Asphalt.
Chapter 2 The Time Value of Money.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 4 Time Value of Money.
Chapter 17 Investment Analysis
Castellanza, 20 th October and 3 rd November, 2010 FINANCIAL INVESTMENTS ANALYSIS AND EVALUATION. Corporate Finance.
Engineering Systems Analysis Richard de Neufville © Massachusetts Institute of Technology Economic Evaluation Slide 1 of 22 Economic Evaluation l Objective.
4. Project Investment Decision-Making
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
Risk Management & Real Options II. The forecast is always wrong Stefan Scholtes Judge Institute of Management University of Cambridge MPhil Course
INFLATION AND CAPITAL BUDGETING INFLATION IS THE INCREASE IN THE GENERAL LEVEL OF PRICES FOR ALL GOODS AND SERVICES IN AN ECONOMY.
Engineering Systems Analysis Richard de Neufville © Massachusetts Institute of Technology Economic Evaluation Slide 1 of 22 Economic Evaluation l Objective.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
The Time Value of Money.
Chapter 4 The Time Value of Money Chapter Outline
Copyright © 2012 Pearson Prentice Hall. All rights reserved. CHAPTER 3 What Do Interest Rates Mean and What Is Their Role in Valuation?
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Understanding Interest Rates
Chapter 4 The Time Value of Money
1 Chapter 7 The Time Value of Money. 2 Time Value A. Process of expressing 1. The present value of $1 invested now in future terms. (Compounding) Compounding.
Finance 2009 Spring Chapter 4 Discounted Cash Flow Valuation.
Investing Money. What does it mean to invest money?  Investing means putting your money where it can make more money by earning higher rates of return.
Long-Term (Capital Investment) Decisions
Introduction To Valuation: The Time Value Of Money Chapter 4.
Personal Finance: Another Perspective Time Value of Money (1).
Understanding the Concept of Present Value. Interest Rates, Compounding, and Present Value In economics, an interest rate is known as the yield to maturity.
Engineering Economic Analysis Canadian Edition
Interest and Interest Rate Interest ($) = amount owed now – original amount A)$1000 placed in bank account one year ago is now worth $1025. Interest earned.
Time Value of Money, Discounted Cash Flow Analysis (NPV) & Internal Rate of Return.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 4 Time Value of Money.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Engineering Economy Slide 1 of 13 Present Value, Discounted.
Engineering Economic Analysis Canadian Edition Chapter 3: Interest and Equivalence.
Chapter 8 Capital Asset Selection and Capital Budgeting.
Lecture Outline Basic time value of money (TVM) relationship
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Engineering Economy Slide 1 of 14 Present Value, Discounted.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Choice of Discount RateSlide 1 of 32 Choice of Discount.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Using Discounted Cash Flow Analysis to Make Investment Decisions Project Analysis By : Else Fernanda, SE.Ak., M.Sc. ICFI.
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Review for Mid-termSlide 1 of 14 Review of 1st half.
Mark Xu NRCS 67th Annual SWCS International Conference.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
Time Value of Money Dr. Himanshu Joshi FORE School of Management New Delhi.
Chapter 5 The Time Value of Money— The Basics. Copyright ©2014 Pearson Education, Inc. All rights reserved.5-2 Slide Contents Learning Objectives Principles.
Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Choice of Discount RateSlide 1 of 39 Choice of Discount.
CALCULATIONS….
CALCULATIONS….
Capital Budgeting and Investment Analysis
6. Discounting Reading: BGVW, Chapters 6.
Choice of Discount Rate
Choice of Discount Rate
Present Value, Discounted Cash Flow. Engineering Economy
Presentation transcript:

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 1 of 16 Discounted Cash Flow Analysis (aka Engineering Economy) Objective: –To provide economic comparison of benefits and costs that occur over time l Assumptions: –Future benefits and costs can be predicted –All Benefits, Costs measured in money –Single point of view (generally, the project owner) P R F Cash Flow + - time

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 2 of 16 Issue - Value over time l Money now has a different value than the same amount at a different date l Comparable to – but not equal to – interest rate l Proper name: Discount Rate, r because future benefits/costs are reduced… (that is, discounted) to compare with present

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 3 of 16 Formulas for N Periods l Single amounts a) Future Amount = P (1 + r) N = P (caf) caf = Compound Amount Factor b) Present Amount = F/caf 1/caf = Present Worth Factor l Finite Series c) F = i R (1 + r) i = R [(1 + r) N - 1] / r d) R = P (crf) = [P*r (1+r) N ] / [(1 + r) N - 1] crf = Capital Recovery Factor

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 4 of 16 Formulas for N Periods (cont) l Infinite Series 1 (1+ r) N / [(1 + r) N - 1] => 1 => crf = r l Small Periods (1 + r) N ==> e rN

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 5 of 16 Present Value Analysis l Present Value Analysis puts all future amounts on a common basis, typically the present –It may be some other reference year that is convenient, such as year of proposed investment l Net Present Value is the total of the present values of all future amounts, typically: Revenues – Costs = Net Amount l Referred to as NPV

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 6 of 16 Example Application of Present Value Analysis All by spreadsheets! Example:

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 7 of 16 Effect of Different Discount Rates l Higher Discount rates => –smaller value of future benefits –discourages projects with long pay back periods –project advocates try to minimize discount rate –Examples: Massive Dams ; Airports; Aircraft projects l Argument over Discount rates –Often very difficult politically –Not hard from technical perspective –Generally higher than politicians want, –for example, US Government base case before 2000 was 7%, but under current administration it is ~5% (see later slides) –MORE DISCUSSION NEXT WEEK

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 8 of 16 US Govt base position on Discount rate (OMB Circular A-94,1992,revised yearly) 1. Base-Case Analysis. Constant-dollar benefit-cost analyses of proposed investments and regulations should report net present value and other outcomes determined using a real discount rate of 7 percent. This rate approximates the marginal pretax rate of return on an average investment in the private sector in recent years. Significant changes in this rate will be reflected in future updates of this Circular. 2. Other Discount Rates. Analyses should show the sensitivity of the discounted net present value and other outcomes to variations in the discount rate. The importance of these alternative calculations will depend on the specific economic characteristics of the program under analysis. For example, in analyzing a regulatory proposal whose main cost is to reduce business investment, net present value should also be calculated using a higher discount rate than 7 percent. (accessed pre 2000)

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 9 of 16 Graphical view of Effect of Different Discount Rates and Lengths of Time

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 10 of 16 l To appreciate effect of discounting: Rule of 72 or Rule of 70 e rN = 2.0 when rN = 0.72 (actually = 0.693) l Therefore, present amount doubles when future amount halves rN = 72 with r expressed in percent l Examples –When would $1000 invested at 10% double? –What is, at 9%, the value of $1000 in 8 years? Discount Rate Approximation

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 11 of 16 Effect of Different Time Horizons l Longer Periods of Benefits –Increase Present Values –Increment depends on discount rate l What length of time matters? –For US Government Rate, not much over 30 years –For Rates commonly used in business (15 to 20%), anything over 20 years has little value –Exception: If future benefits grow exponentially, they may compensate for discounting of future revenues

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 12 of 16 Current US Government position on Discount rate (OMB Circular A-94) Provides 2 rates: Nominal represents future purchasing power; reflects inflation Real represents constant-dollar; assumes no inflation => Difference implies assumed rate of inflation These rates change yearly (as of last several years) These rates differ according to period – lower rates for shorter periods Note: assumed rate of inflation differs by period (See next slides)

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 13 of 16 Discount rates by OMB Circ. A-94, Appendix C [Ref:

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 14 of 16 However… l Guidelines appear precise (2 significant figures) l But they are highly variable from year to year (see next slide), so analysis done in year N can be significantly off in year N+1 l Would seem to be political, as evidenced by comparing rates from last 6 years with those given before 2000 (see slide 8)

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 15 of 16 Previous Discount rates by OMB. A-94

Engineering Systems Analysis for Design Richard de Neufville © Massachusetts Institute of Technology Discounted Cash Flow Slide 16 of 16 Summary l Formulas Simple l Especially by Spreadsheets l Discount rate is key issue l High rates recommended (but see later presentations) l Longer term benefits not large