Two Energy Facility Permitting Reforms: New Hampshire’s Site Evaluation Committee, and the Federal FAST-41 Tom Burack, Esq., Sheehan Phinney New England.

Slides:



Advertisements
Similar presentations
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Advertisements

RESOLVE, Inc. National Geothermal Collaborative An Overview January 20, 2004.
USAID ROLE IN IMPACT ASSESSMENT AT THE MDBs Jim Hester Agency Environmental Coordinator.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
IRWA 2013 Federal Agency Update Bureau of Land Management (BLM) U.S. Forest Service (USFS) Energy Corridors & Rapid Response Team.
International Civil Aviation Organization Regional Cooperation in the Southern African Development Community (SADC) Cliff Elbl CTA/Project Coordinator.
Lecture 4. Coastal Policy Overview. Coastal Management: Nested Scales Federal – Coastal Zone Management Act State – California Coastal Program Local.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
Minnesota Law and Health Information Exchange Oversight Activities James I. Golden, PhD State Government Health IT Coordinator Director, Health Policy.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
CUI Statistical: Collaborative Efforts of Federal Statistical Agencies Eve Powell-Griner National Center for Health Statistics.
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
US FOREST SERVICE REGIONAL ROUNDTABLE Planning Rule Revision Photographer: Bill Lea.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
State of New Hampshire Site Evaluation Committee PO Box Hazen Drive Concord, New Hampshire Telephone (603)
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
1 MassDEP Wind Turbine Noise Technical Advisory Group.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
WIND ENERGY SITING REFORM LEGISLATION Kenneth Kimmell, General Counsel, Executive Office of Energy and Environmental Affairs.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
VI. Developing a VSMP Program General Stormwater Training Workshop.
1 Overview of Minerals Management Service’s Alternative Energy Program Ocean Law Conference May 22, 2008 Seattle, WA Walter D. Cruickshank Deputy Director.
REGIONAL GOVERNMENT The South East England Regional Assembly (SEERA or the Assembly) –Representative voice of the region. –Covers nine areas: Berkshire,
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
Electric Transmission Lines and Utility Corridors.
MPSC Licensing Issues Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
Regulatory Framework for Uranium Production Facilities in the U.S.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
79 th Texas Legislative Session 2005 – Summary of ERCOT Impacts ERCOT Board of Directors June 21, 2005 Mark Walker.
LPA Program Federal-aid Issues for Local Agencies Mike Morrow – December 10, 2010.
Fixing American’s Surface Transportation (FAST) Act and NEPA Section 1309 – Program for Eliminating Duplication of Environmental Reviews 23 USC 330 – CEQA/NEPA.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
FERC Order 1000 and its Potential Implications for BCCPG Transmission Providers BCCPG Steering Committee Meeting 20 September 2011.
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
Kern Council of Governments KERN REGIONAL BLUEPRINT PROJECT March 16, 2006.
INTERSTATE PIPELINE FORUM Presented by: Rebecca F. Zachas, Esq.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Business Law and the Regulation of Business Chapter 46: Environmental Law By Richard A. Mann & Barry S. Roberts.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Environmental Quality Board
New England States Committee on Electricity (NESCOE)
Draft Transportation Element September 6, 2017
Project & Program Governance
Welcome to Community Solutions: NEPA & EJ: Leveraging Federal Resources to Advance Community Environmental, Economic and Health Vitality “A Focus on.
P3 Conference 2018 Sam Beydoun Bureau Chief
Groundwater and Waste Management Committee November 9, 2016
Nick Bonvoisin Secretary to the Convention on the
The Electric Reliability Organization: Getting from here to there.
Project Overview.
Julie Woosley, Division of Waste Management
Grant Funding for Outdoor Recreation through DCR
Cooperative Federalism 2
WIND ENERGY SITING REFORM LEGISLATION
Presentation transcript:

Two Energy Facility Permitting Reforms: New Hampshire’s Site Evaluation Committee, and the Federal FAST-41 Tom Burack, Esq., Sheehan Phinney New England Electricity Restructuring Roundtable, December 15, 2017

Permitting Energy Facilities in NH Energy Facility Site Evaluation Committee Land use and permitting 15 members/8 agencies No budget Increased caseload Public study process Procedural (e.g., membership, staffing, process) Substantive (e.g., impacts, alternatives, energy policy)

2014 Amendments – Process Changes Reduced Committee size Added Public Members Subcommittees/Designees authorized Full-time Administrator position authorized Adequate funding Mandatory pre-application and post-filing public information sessions Required rulemaking (e.g., application contents) Sec must make 4 findings to approve project: Technical, managerial and financial capability to construct and operate Not unduly interfere with orderly regional development of the region No unreasonable adverse effect on aesthetics, historic sites, air and water quality, the natural environment and public health and safety Serves Public Interest

2014 Amendments – Substantive Changes “Public Interest” finding No definition provided in statute Topics of stakeholder and citizen concern: State energy policy Alternative sites and routes Visual, environment and natural resource impacts Orderly development, noise New rules (detailed provisions for wind, transmission, and pipeline projects)

Future Issues? Public Members’ workload Stakeholder participation Counsel for the public’s role Rule refinement Certificated project inspections Panel membership Conditional certificates

Federal Permitting Reform FAST-41: Title 41 of Fixing America’s Surface Transportation Act (2015) Large-scale ($200+M) infrastructure projects Highways, waterways, water resources, broadband, energy, pipelines, transmission lines Require NEPA review Goal: Improve timeliness, predictability, transparency of federal environmental review & authorization

FAST-41 Federal Permitting Improvement Steering Council (FPISC) Standardizes interagency consultation and coordination on permitting Recommended best practices, guidance, schedules Online Permitting Dashboard of projects’ status States may participate as cooperating agencies Project sponsor participation is voluntary

Federal Permitting Timelines Presidential Executive Orders Agency Permit timeline goals Coordination of federal and state permitting processes and timelines

Some Possible Measures of Siting and Permitting System Effectiveness Timeliness (Predictability) Quality (Understandability, Consistency, Transparency) Public engagement and acceptance of results Long-term compliance Long-term impacts/outcomes

Contact Information Thomas S. Burack, Esq. Sheehan Phinney 603-627-8387 tburack@sheehan.com www.sheehan.com