EuCARD2 WP 10.2 HTS Conductor

Slides:



Advertisements
Similar presentations
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
Advertisements

September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Optimisation of Roebel cable for HTS accelerator magnets
Structural design of EuCARD2 magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
EuCARD2 Magnet Status and action plan
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 0339 Development and Testing of Innovative Fault Current Limiters for Distribution.
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
Superconducting R&D – Now Strand and Cable R&D FERMILAB Magnet Systems Department – Now SC Materials Department (TD) HTS Insert Coil Test in External Solenoid.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
FCC kick-off meeting a summary for magnets L. Bottura
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
BRUKER HTS tape measurement John Himbele, Arnaud Badel, Pascal Tixador 1.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
The Business of Science ® Page 1 © Oxford Instruments 2012 CONFIDENTIAL Bi-2212 Round Wire Performance Continuous Improvement OST, EUcard2 CERN, June 14,
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP10- Future Magnets.
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Prospects for the use of HTS in high field magnets for future accelerator facilities A. Ballarino CERN, Geneva, Switzerland.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
E. Todesco, Milano Bicocca January-February 2016 Appendix C: A digression on costs and applications in superconductivity Ezio Todesco European Organization.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
HTS insert magnet design: Stack Cable Johnny Himbele, Arnaud Badel, Pascal Tixador 1.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
HTS Roebel cables for the EuCARD2 “Future Magnets”
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
Task 5: High-Tc superconducting link Summary of work-package
CORC®: Results and Perspectives Danko van der Laan and Jeremy Weiss
Outline Many researchers active on theoritical superconductivity physics MaNEP Network & many others Applied research, I will mention.
EuCARD2 WP10.2 main results and open issues
L. Bottura and C. Senatore on behalf of WP10.2 February 7th, 2017
Modeling of LTS and HTS superconductors at the University of Twente
Lucio Rossi (CERN) WP10 coordinator
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
WP-7 / Task 4 Very high field magnet
11 T cable development and procurement strategy at CERN
CERN Conductor and Cable Development for the 11T Dipole
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Roebel cables for EuCARD²: experience and options.
Naoyuki Amemiya Kyoto University
the MDP High Field Dipole Demonstrator
Insert - dipole common issues
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

EuCARD2 WP 10.2 HTS Conductor EuCARD2 Kick-off at CERN 14th June 2013

Task 2 - objectives Design prototype and produce HTS cables, in unit length (order of 50 m) and quantity (order of 5 UL) sufficient for coil winding (1 magnet per material option) Improve the performance of the two candidate HTS materials (BSCCO-2212 and YBCO), with targets suitable for a 5 T accelerator grade insert in a 15 T background magnet. Produce at least 10 kg of each material at target performance Characterize electrical and mechanical properties of the basic materials and cables. Assist material R&D through advanced analytical and imaging techniques

Task 2 – targets and metrics Wires/Tapes parameter units targets JE (20 T, 4.2 K) (A/mm2) 600 JE (15 T, 4.2 K) 675 JE (12 T, 4.2 K) 800 s (IC) within a unit length (%) 10 M(1.5 T, 10 mT/s) (mT) 300(1) Range of stransverse (MPa) 100 Range of elongitudinal ±0.3 Unit length (m) (1) ball-park estimate, depends on the magnet design, to be fixed as a result of the magnet test

Task 2 – targets and metrics Cables parameter units targets IC (20T, 4.2 K) (kA) 10 Provisional width (mm) 10(2) Provisional thickness 1.5(2) Effective contact resistance (mW) 5(3) (2) depends on the cable and magnet design, scope of the cable design group (3) ball-park estimate, depends on magnet design, to be fixed as a result of the magnet test

Plan

Major milestones October 2013: Cable design (baseline) March-June 2014: Cable validation tests December 2014: YBCO tape and BSCCO wire production completed June 2015: Cable delivery for magnet winding

Cable Design Group Review cable options for both high-field HTS materials Propose cable layout and dimensions Provide initial analysis of cable performance Expected critical current, critical current density, dependence on field Finalize a plan for testing of materials and cables A1: nominate participants from the beneficiaries and associated laboratories

Testing – ideas for a work-split Wires and tapes High field Ic: Grenoble, Geneva (Bruker ?) Strain dependence of Ic: Geneva, Twente Stress dependence of Ic: Geneva Angular dependence of Ic: Grenoble Magnetization: CERN (Bruker ?) Material analysis: CERN@ESRF Cables High field Ic: CERN, Twente Stress dependence of Ic: CERN, Twente Cable magnetization and loss: Twente, Southampton Mechanical properties (and Ic ?): Karlsruhe

Interface matters Insulation schemes Quench detection and protection High-temperature withstand (BSCCO) Compatibility of impregnation with basic material (YBCO) Quench detection and protection A2: decide which Task in the WP deals with these matters as the responsible for the work