MDD to Milestone A Requirements Management Activities

Slides:



Advertisements
Similar presentations
Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
Advertisements

Lesson Objectives Review Capabilities Development documents and processes for Information Technology and Information Systems IT Box – (current JCIDS manual)
NDIA 15 th Annual SE Conference October 2012 | Page-1 Distribution Statement A – Approved for public release by OSR on 10/09/2012, SR Case # 13-S-0078.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
CLR 252 Developing KPPs Note from SME:
Systems Engineering and Parts Management
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering.
Requirements Management Training Overview Greg Prothero Deputy Director of Requirements Management Training School of Program Managers Defense Acquisition.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
Life Cycle Logistics.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Brian Lihani Deputy Chief, Aerospace Warning Branch HQ NORAD/J35W 11 May 2011 Analysis of Alternatives (AoA) This Briefing is Classified UNCLASSIFIED.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Business, Cost Estimating & Financial Management Considerations
Presidential Direction
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
The Information Technology (IT) Box A Primer
Today’s Summary Tab 4 Tab 6 Tab 2 Tabs 3 and 5 Defense Acquisition
Lesson Objective Summarize the relationship between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
MNS - Mission need statement
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
Requirements Management Certification Training Mandate
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
JTAMS MILESTONE A ANALYSIS
Milestone A to Milestone B Requirements Management Activities
Cumulative IOT&E Results Through FY 2008
New Space Systems Acquisition Policy
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, December 2015.
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Milestone A to Milestone B Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Product Support Considerations
The Information Technology (IT) Box A Primer
The Department of Defense Acquisition Process
JTAMS PRE-MILESTONE B ANALYSIS
JTAMS PRE-MILESTONE B ANALYSIS
Presentation transcript:

MDD to Milestone A Requirements Management Activities Tom Fritz thomas.fritz@dau.mil 703 805 4583

Lesson Objectives Determine the major requirements management activities during the acquisition process from the Materiel Development Decision (MDD) to Milestone A Distinguish the decision points, milestones, and phases of the Defense Acquisition Management System and the relationship to JCIDS documents Summarize the purpose and major activities that take place during the Materiel Solutions Analysis (MSA) phase and the links between those activities Explain the Milestone A decisions and approvals

MDD to Milestone A Materiel Solution Analysis Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B FCB Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment AoA Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD

MDD to Milestone A Requirements Management Activities Materiel Solution Analysis Materiel Development Decision A Draft CDD ICD Purpose: Assess potential materiel solutions Major Activity: AoA Requirements Management Activities Develop Draft Capability Development Document (CDD) Reliability, Availability, Maintainability Cost Rational (RAM-C) Report Monitor/provide input (Table F-1 JCIDS Manual) Analysis of Alternatives (AoA) Study Test & Evaluation Strategy (TES) Technology Development Strategy (TDS) Affordability Target, Cost Estimate, and PPBE

Reliability Analysis, Planning, Tracking, and Reporting Program Managers (PMs) shall formulate a comprehensive reliability and maintainability (R&M) program with reliability growth strategy as an integral part of the systems engineering process For JROC Interest programs (except Information Systems) Component, Requirements Manager (RM), develops initial RAM-C Report as part of the AoA process and *included as an attachment to the Systems Engineering Plan (SEP) for Milestone A (MS A) and updated for MS B and C RAM-C Report Executive Summary attached to CDD & CPD Programs other than JROC Interest develop RAM-C Reports as determined by DoD Component or PM See, DoD Reliability, Availability, Maintainability, and Cost Rationale Report Manual, June 1, 2009 and AT&L DTM 11-003

Milestone A MDA approves: Materiel solution Affordability Target (average unit acquisition cost and average operating and support cost per unit) Technology Development Strategy (TDS) Exit criteria for next phase, Technology Development Milestone A Certification Acquisition Decision Memorandum (ADM) A favorable Milestone A decision does not mean a new acquisition program has been initiated. Exception - ship building programs may be initiated at Milestone A

Milestone A Certification (Required by 10 USC 2366a for MDAPs) MEMORANDUM FOR THE RECORD SUBJECT: Milestone A Program Certification As required by Section 2366a of Title 10, United States Code, I have consulted with the Joint Requirements Oversight Council (JROC) on matters related to program requirements and military needs for the (name of program) and certify that: (1) the program fulfills an approved initial capabilities document; (2) the program is being executed by an entity with a relevant core competency as identified by the Secretary of Defense; (3) an analysis of alternatives has been performed consistent with the study guidance developed by the Director of Cost Assessment and Program Evaluation; (4) a cost estimate for the program has been submitted, with the concurrence of the Director of Cost Assessment and Program Evaluation, and the level of resources required to develop and procure the program is consistent with the priority level assigned by the JROC; and, (5) [include only if the system duplicates a capability already provided by an existing system] the duplication of capability provided by this system is necessary and appropriate.

Joint Operations Concepts Materiel Solution Analysis Phase Linkage: ICD, AoA, draft CDD, & Contract for Technology Development (TD) Materiel Development Decision Milestone A Strategic Direction Joint Operations Concepts CONOPS Feedback from field Cost Estimate & $$ Contract ICD Draft CDD SPECs preliminary CBA AoA Capability attributes MOEs/ MOPs KPPs/ KSAs TD Materiel Solution Analysis Phase 7