Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, July 6, 2011 Beam requests and schedule 2011 Experimental statistics.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report INTC meeting, 15 February 2007 ISOLDE scientific coordinator’s report INTC meeting, 15 February.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Schedule Access to the hall b508. Magdalena Kowalska.
First collisions in LHC
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Brief introduction to the Injector MD days
Technical Report for ISOLDE
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
RF operation of REX-ISOLDE
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
EN-CV interventions during EYETS for PS and PSB
Difficult beams accepted in 2014 (updated since last meeting)
A. Herlert, CERN PH-SME-IS
Summary of ion week 48 Last beam OP summary of 2010 Week 48
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Magdalena Kowalska, CERN PH-SME-IS
Scheduling News . Magdalena Kowalska.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Technical report for ISOLDE INTC 19 May 2007
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
Technical Report for ISOLDE
Beam requirements and operational scenarios in 2010
Thomas Nilsson, CERN EP/IS
Magdalena Kowalska, CERN PH-SME-IS
Present and Future test facilities for High-intensity Targetry CERN
Mats Lindroos for The ISOLDE team
Coordinator’s report . Magdalena Kowalska.
SLHC-PP kick-off meeting, CERN 9 April 2008
Thomas Nilsson, CERN EP/IS
INTC matters . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
Thomas Nilsson, CERN EP/IS
A. Herlert, CERN PH-SME-IS
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Alexander Herlert, CERN (PH-SME-IS)
Monday 152 bunch operation summary
Presentation transcript:

Alexander Herlert, CERN (PH-SME-IS) ISOLDE scientific coordinator’s report INTC meeting, May 18, 2009 Alexander Herlert, CERN (PH-SME-IS) Status of ISOLDE experiments Beam requests 2009 Schedule 2009

New and closed experiments at ISOLDE INTC February 2009 10 new experiments: IS484 - IS493 363 approved RIB shifts 83 experiments after February meeting 11 completed ISOLDE experiments (closed by users) IS358, IS390, IS393, IS397, IS398, IS399, IS400, IS424, IS434, IS444, IS458  72 active experiments for 2009 beam period

Accelerator schedule 2009 (V3.4) ISOLDE dates: protons from PSB April 14 physics start ISOLDE April 20 protons stop November 23 (i.e. 31 weeks for physics as compared to 27 weeks in 2008 = 84 shifts more) Several long periods of MD partly with parasitic beam to ISOLDE (not guaranteed) During winter only LHC operation (incl. injector chain) – not ISOLDE

ISOLDE beam requests 2009 Beam requests: 627 RIB shifts requested by 51 experiments compare to 551 RIB shifts requested in 2008 requested RILIS shifts: 359  >50% (337 in 2008) requested RIB shifts with UC target: 460  ~70% (410 in 2008) Requested REX-ISOLDE RIB shifts: 273 Additional ~30 shifts for TISD, LOIs + off-line MD … Scheduled runs (present status): 450 RIB shifts in total (669 shifts for running period incl. PSB setup) 425 RIB shifts for 39 experiments 63 different beams 12 experiments not scheduled 235 RIB shifts with RILIS operation (>50%) 282 RIB shifts with UC target (>60%) 8 REX-ISOLDE runs for 9 experiments with 171 RIB shifts (~40%) 4

ISOLDE schedule 2009 - overview ISOLDE program 2009: physics started April 20 protons stop Nov. 23 31 weeks for physics So far scheduled: 39 IS experiments 450 RIB shifts

ISOLDE schedule 2009 – REX-ISOLDE 20 active REX experiments 4 with no beam request 10 scheduled 2 share target/setup (but different beams) 2 have same beam 8 runs 3 days for setup + 2 WITCH runs Need REX-TRAP Operation of WITCH not compatible with EBIS/ LINAC operation REX training Diamond detector tests MD throughout the year

ISOLDE schedule 2009 – Targets 27 target units planned 10 for HRS 17 for GPS 4 used target units 12 new UC units (2 used) TISD 3 dedicated runs: - BeO for 6He beam - low work-function cavities (+Nd RILIS) - INFN UC target test

ISOLDE schedule 2009 – RILIS 15 RILIS runs planned 1 off-line (be) 1 target test (Nd) dense schedule Mn scheme to be tested 235 RIB shifts planned >1800h on-line shifts more than 2300h total

Off-line period and startup 2009 ISOLDE maintenance + cold check-out Shutdown maintenance finished (almost) on time Installation of new ISCOOL rf amplifier delayed Integration of ISCOOL vacuum system ongoing Usual startup problems, incl. vacuum + controls (not as bad as in last year(s) ) REX-ISOLDE up and running very early in the year 1 week of off-line physics/testing Test of ISCOOL bunching for COLLAPS experiment Only one day for tests due to delay in rf amplifier installation Valuable results for IS449 (although very short time for tests)

Main problems so far … Power cut (glitch) Sunday, April 26 No major problem, a few hours delay in restart of LINAC 2 and PS Booster Controller cards for PISOMOVE system broken First, only GPS card broken  no target change possible for GPS During intervention also HRS card broken  both front ends blocked After repair of cards target change possible Only one day lost for following run (Ta target on GPS) Additional collections from ZrO target during intervention Water leak in PS Booster injection septum Major failure – septum to be replaced with spare HRS run (COLLAPS, IS457) had to finish with only 50% of proton beam intensity – still successful run Intervention will start Monday, May 18, 8:00 – unclear when proton beam for ISOLDE will be back … For the upcoming runs: need stable controls limitation of proton beam intensity on GPS: need results from thick target

… but also good news: First on-line runs in 2009 TISD: BeO target test (GPS) Production of 6He beam - successful run IS473 (ISOLTRAP) + collections for IS437 (HRS): No ISCOOL MD due to PISOMOVE problem No 194Hg beam (unclear why) – but other mass measurements done Collections for IS437 successful ZrO target and SSP collections (GPS): Used High-voltage platform as GLM not working (PISOMOVE problem) Succesful run Ta target for IS417 (9Li) + collections for SSP (GPS): Successful test of new detectors (IS417) Collections for IS486 and other groups successful Wait for repair of PS Booster septum to finish program IS457 (COLLAPS) (HRS): Successful run on neutron-rich Ga isotopes (despite lower proton beam intensity at the end of run)