ILC CFS AD&I Daresbury Lab Summary

Slides:



Advertisements
Similar presentations
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.
Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
21 July 2006, Vancouver Global Design Effort 1 PPS - division into zones and shield wall locations - N. Terunuma KEK.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC Utility Design Study for Kitakami-site
Estimate AC power for TeV Upgrade
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
ILC Cryogenics Work Package Status and Plans
CLIC Civil Engineering Update
Americas KlyCluster Cost Analysis Overview
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
Q &A for the questions from CFS of April 29,2011
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Latest ILC tunnel cross section May 2017
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
CLIC Civil Engineering Update
Extract from today’s talk given to DCB
Nick Walker for the Project Management
ILC Cryogenics -- Technical Design Report Planning
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
Presentation transcript:

ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto

Material will be posted on Indico : http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=4146

Walk through entire machine Some errors / misunderstanding clarified

3.2km long ‘racetrack’ damping ring

Beam dumps have been added (all cavern dimensions to be reviewed)

5.2m diameter Single tunnel beyond shafts 2 and 3

Tunnel enlargement (9.5m width) in Source areas

5.2m diameter service tunnel and machine tunnel leading up to experimental area

Interaction Region

Main Beam dumps need to moved to ‘south side’ ie opposite side of DR pointing downwards on this drawing. This means, due to Muon radiation, level of service tunnel needs to be adjusted Note : Some of these issues at refinments of the RDR rather than SB2009 !

Service tunnel revised layout

Service tunnel revised layout – Dump is below service tunnel

Service tunnel revised layout – Dump is below service tunnel

Tunnel enlargement (9.5m width) in Source areas This size of this enlargement needs to be revised : 3d model from Daresbury due this week (AUTOcad already available) Tunnel enlargement (9.5m width) in Source areas

Tunnel enlargement (9.5m width) in Source areas needs to be reviewed (transport corridor on one side is acceptable?)

For both Kystron Cluster and DRFS we are assuming 5 For both Kystron Cluster and DRFS we are assuming 5.2m single tunnel for main linac Is cryo vent pipe required in standard tunnel cross section ?

(2) Distributed RF System (Tunnel view) Tunnel Size Under Consideration Pros; no big step-up transformer, less waveguides. Cons; more klystrons and drive systems. - XFEL and TESLA design are references - 22 22

Main actions/conclusions from Daresbury 2d drawings to be updated and reviewed internally before release (FNAL) Updated machine 3d models by Norbert for positron source area (including BDS etc) awaited to allow sizing of the tunnel/alcoves Drawings will be different for each region…….   Transport passage on one side of the machine ok DR relatively well understood remains on north side. Cavern sizes adjusted. RTML : one of the beam dumps can be deleted (On next 2d layout the beam dumps should be labelled ‘main dump, 17KW dump etc to avoid confusion.) BDS : position and size of beam dumps unclear : 3d model by Norbert required....    Main beam dumps need to be moved to other side of linac : may to put service tunnel at a higher level than beam tunnel due to muon beam radiation 2nd tunnel for safety : Atsushi : Two possibilities: 1. Fire shelters or compartments 2. In Japan second tunnel option should not be excluded due to increase in safety requirements this will be presented at Albuquerque? do we need cryo vent pipe under pressure ? Muon walls questions, getting equipment either side ? Machine lines from main linac to DR transfer line is an issue beam dumps cross transport lines, extra shafts ? diameter of main linac 4.5 or 5.2m cost very similar = see cost curve from FNAL…. services required for ML klystron electronics, instrumentation, shielding etc. needs better definition to update cross section heat loads mostly understood by CFS…Emil….(DRFS full power/ low power confirmed by KEK 9 Sept) For Albuquerque : 2d's updated Norbert to do 3ds for machine 3d civil updated Nick asked for cost estimate for this new layout with respect to RDR……….. Next AD&I first week of December ?