Update on Junction Box Design

Slides:



Advertisements
Similar presentations
Objective: Develop plans for kitchen cabinets.
Advertisements

Cooling Business Group 1 Integrated Refrigerator.
MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
Drafting symbols and lines
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Elevations.
TP4-ENERSOL-TD/PV double function
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
The HCAL barrel absorber structure
4.8 Polynomial Word Problems. a) Define the variable, b) Write the equation, and c) Solve the problem. 1) The sum of a number and its square is 42. Find.
Warm-Up #1 11/30 1. Write down these 3 formulas:
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Interior Paneling Installation Copyright © Texas Education Agency, All rights reserved.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
DCal-ALICE integration and installation plan and status A. Tauro.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
S A Griffiths CM42 June 2015 Electrical & Control.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Teleconf ACS – FREIA 28th March 2017
ATLAS ITk Baby-DEMO update
CLIC Handling Engineering Update
Service channels between Tracker and PP1
Updated Design of Detector Hall
Service channels between Tracker and PP1
VELO-installation meeting CERN, January 17, 2006
NOVA DESK RANGE.
VELO Thermal Control System
Flexible lines production and planning
Teleconference ACS – FREIA 17th October 2017
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Teleconference ACS – FREIA 31st October 2017
Detector hall in mountain regions
Far Detector Activities Late 2017 – Early 2018
Update on Junction Box Design
OSHA Most Frequently Cited Serious Violations
Pixel CO2 Cooling Status
VELO Thermal Control System
RPC SYSTEM LAYOUT and DIMENSIONS
2 types of scale factor problems
Area Of Composite Shapes
The following model requirements are based on a basic slab door finish kitchen similar to the one shown in the image.
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

Update on Junction Box Design Edyta Pilorz (Cracow University of Technology) 22/03/2016

Pipe work Construction drawings: Prepared Checked Production in progress 22/03/2016

Pipe work – quality verification Quality verification; steps: Visual inspection in the DT workshop (66 welds from 210 checked already) Visual inspection in EN-MME 10% of welds to be checked with X-rays 22/03/2016

Clamping plastic parts Construction drawings: 24 drawings prepared Checking in progress To be sent to the production after the check (material: polyethylene) 22/03/2016

Construction of the box 3D model to be finished Construction drawings to be done 22/03/2016

Order status 22/03/2016 We are waiting for the delivery of: Carel valves Watlow heaters Material for the box (insulation panels and aluminium profiles) Some fittings 22/03/2016

Electrical patch panel location Main Patch Panel Location To detector C side To JB and detector A side 22/03/2016

Electrical patch panel 800x400x150 mm Inputs NSYS3DB4815 Width 10.4 mm End cover width 1 mm Length 46.2 mm Height NS 35/7,5 39.9 mm Height NS 35/15 47.4 mm Height NS 32 44.9 mm 10 cm GSM cable 4.9 cm 0.93x60 cm ~25cm 4.9 cm Phoenix MTKD-NICR/NI - 3100062 Outputs 10 cm 60cm 800x600x200 mm ~25cm NSYS3D8620 10 cm 200 Wago 2002-3203 Inputs Outputs 4.9 cm 0.93x60 cm Door open Gas pipes 4.9 cm 800 90 ˚ turn 600 Wago 2002-1201 22/03/2016

Fitting the “Junction Box” in the alcove - test Scale: 1:1 This helped us to see how to route the cabling It is visible where to fix the support for the box 22/03/2016

Placing the cooling plants in UX85 alcove - layout 3 electrical cabinets 2nd accumulator 2nd cooling plant 1st cooling plant 2nd chiller 1st accumulator 1st chiller 22/03/2016

Measurements for the passage from the lift up to the alcove W LIFT Width: 793 mm Length: 1964 mm Height: 2395 mm ENTRANCE AFTER THE LIFT Height: 2400 mm PASSAGE Height: 2090 mm 22/03/2016

Dimensions of the shaft hole (lifting platform) 964 mm STAIRS . 1436 mm WALL 740 mm 22/03/2016

The biggest dimensions which we can transport vertically 793 mm – because of the width of the lift’s door – TO BE CHECKED WITH NEW LIFT 1436 mm – because of the size of the hole in the lifting platform in the alcove which is 964 mm x 1436mm 2080 mm – because of the height of the passage 22/03/2016