PSU-Lab: A valuable expertise shared and open to CERN users

Slides:



Advertisements
Similar presentations
~ Mini Programmable DC Power Supply ~. mPP Series :
Advertisements

Testing Relational Database
MIS 2000 Class 20 System Development Process Updated 2014.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Steven Chase 1, Yaw Adu-Gyamfi 2 and Paul Fuchs 3 1&2 Department of Civil Engineering, University of Virginia 3 Fuchs Consulting Inc.
CS540 Software Design Lecture 1 1 Lecture 1: Introduction to Software Design Anita S. Malik Adapted from Budgen (2003) Chapters 1.
Poster Guidelines put into a Poster Format Tyler, J.A and Biology & Biotechnology Faculty 1 Worcester Polytechnic Institute, Biology and Biotechnology.
Systems Analysis and Design Kendall & Kendall Sixth Edition
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
System Implementation
1 CMPT 275 Software Engineering Requirements Analysis Process Janice Regan,
Load Test Planning Especially with HP LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Chapter 12 Implementation
Carsten Nesgaard Michael A. E. Andersen
InnovationValueTeamwork SHENZHEN INVT ELECTRIC CO., LTD.
ITEC224 Database Programming
SOFTWARE ENGINEERING1 Introduction. Software Software (IEEE): collection of programs, procedures, rules, and associated documentation and data SOFTWARE.
FAULT TOLERANT POWER SYSTEMS Carsten Nesgaard Advisors: Professor Michael A. E. Andersen Professor Seth R. Sanders Ext. collaborators:
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Monitoring for the LHC experiments Irina Sidorova (CERN, JINR) on.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Slide 12.1 Chapter 12 Implementation. Slide 12.2 Learning outcomes Produce a plan to minimize the risks involved with the launch phase of an e-business.
TDSPWR2 Power Measurement and Analysis Software Addressing Today’s Challenges.
SOFTWARE ENGINEERING1 Introduction. SOFTWARE ENGINEERING2 Software Q : If you have to write a 10,000 line program in C to solve a problem, how long will.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
Business Economics WEEK 4 W/C 4 th March 2013 INTRODUCTION Course Advanced Diploma Management.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Lecture 2 System Development Lifecycles. Building a house Definition phase Analysis phase Design phase Programming phase System Test phase Acceptance.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Structure and Function: IA for Web Applications. Innovate - For What’s Next™ ©1999 Scient, Proprietary and Confidential Page 2 Structure - IA with content.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Software Quality Assurance and Testing Fazal Rehman Shamil.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
How to structure good history writing Always put an introduction which explains what you are going to talk about. Always put a conclusion which summarises.
1 Exotic Disease Response (EDR) Training Surveillance Processes – Overview.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Power Supplies More details about the source of your computers power…
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
3/FEB/2015G. Blanchot, F. Faccio, S. Michelis1 FEASTMP DCDC Converters G. Blanchot On behalf of the PH-ESE Power Project Team.
1 Evaluating GIS for Disaster Management Bruce Kinner GEOG 596B.
Simplified Representation of Vector Fields
SIX SIGMA IMPLEMENTATION
Auxiliary power supply (APS) Hossein Harimi 2014
Introduction Edited by Enas Naffar using the following textbooks: - A concise introduction to Software Engineering - Software Engineering for students-
Beam Interlock System SPS CIBU Connection Review
Realising the SMP 1. Safe Machine Parameters Overview
Business Processes Organization and Roles
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Introduction SOFTWARE ENGINEERING.
Hollow e- lens, Cryogenic aspects
Systems Analysis and Design
ABB SACE Maintenance Preventive Maintenance Program
Introduction Edited by Enas Naffar using the following textbooks: - A concise introduction to Software Engineering - Software Engineering for students-
Operations Management
PowerValue 11/31 T Sales Presentation
Relate to Clients on a business level
Logical Framework I want to design a project by planning out the logic
Product Development Scenario Overview
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
7. EAFM process overview Version 1.
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Operations Management
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Update on Multi Vendor Interop Project.
RELIABILITY Reliability is -
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
An overview of course assessment
Presentation transcript:

PSU-Lab: A valuable expertise shared and open to CERN users TE-EPC, CERN Switzerland – EDMS N° 1736138 Abstract This poster presents a specific service provided by TE-EPC (Power Converter Group) for its internal needs, but also open to TE Department members. The aim of this service is to help with the selection of Auxiliary Power Supplies (low power < 200 W) for the demanding physics accelerator environment. The provided analysis focuses on EMC &reliability, key factors for these units powering critical electronics systems. The context & the needs Almost any electronic system uses AC-DC Auxiliary Power Supplies. PSU-Lab help to choose & organize their tests. A large scope of different domains to qualify a reference. Qualifying an Auxiliary Power Supply requires to measure its compatibility with CERN environment. PSU-Lab focuses mainly on EMC, AC mains events (storms) and reliability. PSU-lab Records 15 records in less than 3 years. PSU-Lab Infrastructure A specific lab, located in building 287, was designed for series test reception and type test qualification. Type test - selecting Reception Test - series It requires to invest time  a week, testing several electrical features under specific stress. This test can disqualify a given unit if it is finally judged of poor quality. These tests are required when receiving the series. Two phases can be applied: - a short burn-in on all units: ex:  8 hours each - a longer period on some: ex:  : 6 months for 10 units. A service adapted to different needs. Domain Field Typical Measurements & Checks EMC Compatibility Conductive Noise, Input and Output side. Susceptibility Burst Test, Input and Output side + Surge Test. Electrical Performances Efficiency, Output Ripple, Starting sequence, short case. Input Line Variations AC phase loss, Over-Voltage conditions, Inrush current. Output Load Variations Dynamic Response to sudden load variations. Fab. Quality Process Solder quality, PCB Layout, Component placement. Design Topology Partial overview of pro / cons of topology reviewed. Components Checking critical components*: technology, ratings. Reliability & IR Inspection Infra-Red Inspection A systematic Infra-Red inspection is performed. Accelerated Testing Evaluation of the reliability: lifetime* & MTBF*. * Strongly dependent on number of samples and time allowed for providing results. 10 units under long reliability test. PSU-Lab & TE-CRG Collaborations A long history, with great collaboration and valuable achievements! Chasing the unreliability, a real quest! Not an easy task, but required for high availability systems. A detailed & structure report, with one summary page Report details each test, providing a clear global summary (1). 1 Collaboration-1 Which delivery? Which result? In 2009, a severe reliability issue on 200 units, each critical for LHC cryogenics systems, was discovered. A complete survey was performed, at the level of the failed units but also the environment. All units were upgraded, tested on a dedicated tester designed by PSU-Lab & returned to operation. Upgraded units were measured in operation, with a demonstrated MTBF higher than two Millions of hours, with only a single failure in four years on 200 units! Collaboration-2 In 2012, TE-CRG decided to upgrade their 24 V.dc systems. PSU-Lab helped them to design and maintain it, analysing every failure in operation. (see slide beside). Reviews were organised, inviting an external EMC expert. Initial design was updated on EMC & on redundant solution being implemented. Any selected units were individually evaluated and qualified, with even long reliability survey (8-months) on some PSU references. A fruitful collaboration with a demonstrated redundant system with transparent failures to operation. The system was carefully designed, following experts recommendation, and using only qualified units on several references. Implicated from the beginning, PSU-Lab was later able to find the root cause on too low MTBF selected units.   Context of failure happening on highly critical cryogenic system. During [2013; 2015] operation, a unit reference selected by SU-Lab showed abnormally low MTBF, suspecting CERN related environment root cause. PSU-Lab traced all failure history, identifying a common failure mode. PSU-Lab evaluated each failed unit, and operating conditions on site as well. Advanced technics (Weibull) were used to conclude issues were linked to an aging phenomena, with safe applied electrical conditions. After heavy and long measurement campaign, analyses, the root cause was found to be DUST combined with a high. Issue was quickly solved unit sensitivity to it. once understood !   Each test is explicated (2) in its method & goal, presenting clear results (3), and how to easily interpret them (4). 2 3 Select do not compress images in file > options > advanced 4 Can PSU-Lab answer if a reference is reliable enough? - Visual inspection detects: poor quality assembly, poor components choice, chosen derating not sufficient, poor design - theoretical. - Electrical tests + infra-red inspection detects: fragile or sensitive design (burst, surge, start on short), poor design - practical. - What about MTBF and lifetime? Shouldn’t we try to estimate them? > Proving a MTBF (random failure) is at least 100 000 hours requires a 0-failure test with 100 units operating 3.1 months (only at 90 % confidence). > Proving a lifetime of 10 years is much longer (years) & not realistic.