ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Cavity BPM for Spectromety: progress and plans A. Lyapin.
Latest laser-wire results ● How does a Laser-Wire work? ● Latest ATF results ● Focusing optics ● Latest PETRA results University of Oxford: Nicolas Delerue,
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
June 15, 2005Marc Ross (ILC) – Instrumentation Development ILC Instrumentation Development Marc Ross, SLAC.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
NanoBPM schedule California Institute of Technology Toyoko Orimoto Cornell University Robert Meller DESY Vladimir Vogel KEK Hitoshi Hayano, Yosuke Honda,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
ILC Controls & Instrumentation R&D Activities at Fermilab G. Tassotto, M. Votava, M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, U.S.A.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
S. Molloy, P. Emma, J. Frisch, R. Iverson, M. Ross, D. McCormick, M. Woods, SLAC, CA, USA S. Walston, Lawrence Livermore National Laboratory, CA, USA V.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Extraction Line Laser-wire 24 th January 2013 A.Aryshev, G.A.Blair, S.T.Boogert, L.Corner, L. Nevay, P.Karataev, N.Terunuma, J.Urakawa, R.Walczak.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Bunch Length Monitor Development
ILC Beam Instrumentation – Introduction Remarks –
LCLS_II High Rep Rate Operation and Femtosecond Timing
LCABD WP 4.2 – Spectrometer and BPM Studies
LCLS Bunch Length Monitor Marc Ross - SLAC
ILC-Americas Regional Team Review
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
Plans for Laser-wire System Grahame Blair 30th May 2005
Beam-induced EMI and detector electronics
Accelerator Physics and Engineering Update Jan 6, 2010
ATF2 Instrumentation Stewart T. Boogert
Damping Ring Kicker Tests at AØ
Intra-Pulse Beam-Beam Scans at the NLC IP
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
Accelerator Physics and Engineering Update Jan 6, 2010
Laser-wire Measurement Precision
High Precision SC Cavity Alignment Diagnostics with HOM Measurements
Undulator Cavity BPM System Status
Linac Diagnostics Commissioning Experience
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
Presentation transcript:

ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole Test Facility Experimental Program ILC Division RD report June 12, 2006 Marc Ross ATF2 cavity BPMs ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole ESA/LCLS bunch length ILCTA 6/12/2006

ATF2 Cavity BPM SLAC group will provide the full cavity system from the hybrid combiner to data server 70 + channels Beam tests April 10 – 22. Single ATF2 cavity between the two triplets (no mover) First look is ‘good’ Data analysis started Full system delivery delayed (was to have been June 5) – delay is mid-August. Following discussions with group at ATF2 meeting Our first cavity BPM System Test result documentation (acceptance) Mechanical Calibration algorithm 4/24/2006 Marc Ross - SLAC

ATF2 Cavity BPM Production electronics 6 GHz receiver board layout Realistic system design including packaging and mounting hardware Tested successfully at ATF April 2006 4/24/2006 Marc Ross - SLAC

System design Local configuration 4/24/2006

Beam Tests of ATF2 electronics (Y. Honda) 4/24/2006 Marc Ross - SLAC

Beam Tests 4/24/2006 Marc Ross - SLAC

Beam Tests 4/24/2006 Marc Ross - SLAC

Schedule 4/24/2006 Marc Ross - SLAC

Do the Nanogrids Help? Data from 13 April 2006 at 22:56: 96 events at nominal position 64 events at +/-20 microns to calibrate Resolution, no nanogrids 19.1 nm Resolution, with nanogrids 15.6 nm 4/24/2006 Marc Ross - SLAC

ATF Laserwire extraction line near old Compton IP requires special optics need wire scanner to confirm backup lens – real one delayed and lost in the mail (Oxford) now testing fully corrected lens for operation in November two graduate students to be posted at ATF all year Miryam Qureishi (Oxford) and Lawrence Deacon (RHUL) Guidance from Pavel Karataev (RHUL) 4/24/2006 Marc Ross - SLAC

ATF laser – wire scan (May 25) First scans Optics and laser aberrations (factor 10 scale error) σ = 17.6 +/- 0.4 µm 4/24/2006 Marc Ross - SLAC

ATF2 Mover System 4/24/2006 Marc Ross - SLAC

Mover shipping and requirements: 4/24/2006 Marc Ross - SLAC

TTF HOM studies – plan for August Goals: install and commission the HOM BPM DOOCs server beam tests of HOM SVD algorithm fast processor HOM board (FNAL) HOM phase feedback 7 shifts; 2 weeks of beam time July 28 to August 13 A lot of time allocated 3 DESY, 5 Fermilab, 2 SLAC, 2 Saclay staff, ANL, JLab, Cockroft. Steve Molloy (SLAC) and Nathan Eddy (Fermi) working on analysis 4/24/2006 Marc Ross - SLAC

Phase Measurement from Monopole modes Phase of monopole modes determined by beam phase. Use fast (5GS/s, 6GHz BW) scope directly measuring HOM signals Compare HOM monopole phases with 1.3 GHz reference Not completely straightforward since TTF trigger jitter > 1 cycle of 1.3GHz Plot phase vs. machine cycle for TM011-7 and TM011-8, and phase difference between modes Note: measurent uses “accidental” data, taken during other experiment, not optimized. 4/24/2006 Marc Ross - SLAC

Higher Order Monopole Modes 2300 – 2500 MHz Both couplers for 1 cavity shown 0.1 degree (L-band) precision  0.2 ps Note that different lines have different couplings to the 2 couplers Monopole lines due to beam, and phase is related to beam time of arrival Fundamental 1.3GHz line also couples out – provides precise RF to beam phase for control 4/24/2006 Marc Ross - SLAC

Beam Phase vs. RF Measurement During 5 Degree Phase Shift 2 cavities, same structure give 0.34 degree L-band RMS phase difference Measure 5 degree phase shift commanded by control system 4/24/2006 Marc Ross - SLAC

What is System Resolution, Drift Compare 2 couplers on same cavity, RMS difference 0.12 degrees L-band. Electronics noise ~0.08 degrees cavity to cavity difference (0.3 degrees may be due to microphonics) Compare 2 cavities for long (7 hour) run. RMS difference 0.69 degrees L-band. Combination of electronics drift and cavity to cavity phase shifts. 4/24/2006 Marc Ross - SLAC

Summary of Phase System Performance System noise ~0.08 degrees L-band, 1 minute timescales. Also measured ~0.1 degree for 10 minutes Cavity to cavity difference ~0.3 degrees, possibly microphonics. Drift <0.7 degrees over 7 hours – probably dominated by real cavity to cavity variations. Cable length change of 10 degrees results in <0.25 degree (consistent with 0) change in measured phase 4/24/2006 Marc Ross - SLAC

ESA/LCLS bunch length monitor This is a ‘single-pass’ device – intended as a ‘relative’ monitor to complement LOLA Two devices to be built for LCLS BC1 Deadline November 2006 Testing until November 2007 ‘CSR’ or focused wave (BL11) and gap monitor (BL12) Both may use pyroelectric devices Beam tests in ESA this month Accurate mm-wave measurements are difficult Full system relies on integration with LOLA (29-4) No LOLA in ESA 4/24/2006 Marc Ross - SLAC

BL12 Bunch Length Monitor Located just after the BL11 monitor Uses gap and diode detectors Only vacuum component is conventional ceramic gap Initially instrument with 100GHz diodes Add higher frequency diodes as needed Diodes used in pairs to reduce effect of beam motion 20cm waveguide used to disperse pulse (~1ns), keep peak power reasonable on diodes. 20dB gain horns on diodes 4/24/2006 Marc Ross - SLAC

BL12 4/24/2006 Marc Ross - SLAC

BL12 Development Plan Similar diodes operating at 100GHz have been tested in End Station B. Additional test in end station B in April 2006, using same electronics as LCLS Will use pair of diodes to check measurement noise. Initial test in LCLS will be done with a pair of 100GHz detectors. As shorter bunch length measurements are required, additional diodes and waveguide can be added Use of optical breadboard makes installation of new diodes (on optical clamp mount) straightforward. Will try using a pyroelectric detector mounted next to the gap. Should be able to measure total mm-wave power, and compare with toroid current measurement to get bunch length signal Very simple and inexpensive system if it works. In principal extends to very short bunch lengths Must be calibrated with LOLA 4/24/2006 Marc Ross - SLAC

ESA Bunch Length Monitor simple ceramic gap and diode detector diode and waveguide form crude bandpass filter 200 to 400 um bunch length sensitivity (ILC) Two 100 GHz detectors track with RMS error of 1.5% 100GHz Diode, WR10 waveguide and horn WR10 and WR90 waveguides at ceramic gap 4/24/2006 Marc Ross - SLAC

Summary – ongoing work and developments since April 2006 ATF cavity BPM’s (UK, UCB, LLNL, KEK) Near a spectrometer result with 2 triplets+1 (?) Nanogrid tests – first results ATF2 BPM cavities (Pohang, KEK, UCL) 1/3 copper cavities done Electronics delayed 2 months  system issues ATF extraction kicker (LLNL, KEK) delivered in June To be used in September 2006 TTF HOM (DESY, KEK, Saclay, FNAL) System implementation in August Phase measurements excellent (April 21) LCLS BLM first results in May