CASE: SOIL BUNDS IN PAKISTAN

Slides:



Advertisements
Similar presentations
6.5 River Stability and Bank Protection John Ratsey
Advertisements

Robert W. Bobel, P.E. Park Engineer Cuyahoga Valley National Park
6.6 Canals and Command Area Structures. (1) Canals in Spate Schemes  traditional systems are diverted to short, steep canals in the upstream areas (with.
Chapter 13: Momentum Principles in Open-Channel
1.3Economic Costs and Benefits. Spate irrigated areas are often among the poorest areas in a country and therefore require special attention.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Sandbagging Techniques
Stages of a River Stage:Upper Course 1. Source 2. Waterfall
DAMS.
INTERCEPTION DRAINS, WATERWAYS AND WEIRS Interception drains also - cut-off drains, stormwater drainsalso - cut-off drains, stormwater drains "standard"
3.4 Drinking Water Ponds in Spate Irrigation Systems.
Texas Waters, Rivers and the Gulf of Mexico
Surface Water Streams and Rivers Stream Erosion and Deposition
Bioassessment 1.0. Stream Visual Assessment Protocol 1. Turbidity 2. Plant growth 3. Channel Condition 4. Channel Flow Alteration 5. Percent Embeddedness.
Nancy Rogel Eddie Guadarrama
Sanitary Engineering Lecture 16
6.4 Improving Diversion Works
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Sediment Transport in Wadi Systems Part 1: Overview
PLI Project DI Khan (Pakistan) 3.7. Project for Livelihood Improvement Overall Goal: Socio-Economic status of Disadvantaged communities enhanced. Objectives:
Drinking Water from Dry Riverbeds 6.6. Four types of Riverbeds 1: Hilly and stony catchments - Producing coarse sand - Extraction rate of 35% (Meaning:
CASE: HADRAMAWT IMPROVED TRADITIONAL ENGINEERING 6.6.
EVALUATION OF SPATE WATER DISTRIBUTION AND APPLICATION STRUCTURES Dr. M. Munir Ahmad Engr. Zafar Islam Engr. Fazal Minallah Water Management of Spate Irrigation.
Floodplains BY Rebecca Hinks & Charlotte Bootherstone.
Erosion Four Corners Last man standing! (most likely going to be a woman… Just saying…)
13 Surface Water 13.1 Streams and Rivers
SOIL MANAGEMENT AND MOISTURE CONSERVATION
SPATE IRRIGATION IN PAKISTAN
Chapter 4: Weathering and Erosion
 This will occur when streams receive more water than their channels can hold,  i.e. when stream discharge is greater than stream capacity.  Streams.
1.4 Unlocking the potential in spate irrigation.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
6.7 Improved Traditional Systems
2.2 Spate water rights and distribution rules. This is Anambar Weir, Balochistan (Pakistan) What happened here?
6.11 Case: Wadi Labka – What to Do When Traditional System Becomes Unsustainable.
Re-Cap of the Hydrological Cycle Task 1: 1.What are the main processes in the hydrological cycle? 2. How is a balance maintained within the hydrological.
6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.
UNIT 4 CANAL IRRIGATION. DEFINITION canal usually draw their supplies from rivers.they are not provided with any headwork for diverson of river water.
What is the Bradshaw model?
Surface Water Movement
Learning objectives Processes of River Transportation
Chapter 11 Fresh Water.
Designing Swales Norman W. Garrick CE 4410 Spring 2017 Lecture 15.
1.2 Typology of spate irrigation systems
Reinforced earth structures
6.12b Belilo Spate Irrigation System
CT Reinforced Earth Structures
Flood: Build a Stronger Plinth
Suresh.R.
SUBGRADE HOW TO DEAL WITH SOFT SPOTS
6.2 Sedimentation Issues: Overview
Surface Water Chapter 9.
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
Water Erosion and Deposition
UNIT 8 CANAL HEAD WORKS SANDEEP LECTURER IN CIVIL ENGG. GP MEHAM.
1ST YEAR OF ESO RIVERS PROFESOR TIERNO GALVÁN SECONDARY SCHOOL.
REGULATION WORK UNIT – 10 LECTURER IN CIVIL ENGG. GP MEHAM SANDEEP.
ECONOMIC COST AND BENEFITS
PAPER 1: Living with the physical environment
6.8 Case - ‘River Engineering Approach’ Wadi Labka – Gabion/ Soil Diversion Spurs.
2.2 Spate water rights and distribution rules
IMPROVED TRADITIONAL SYSTEMS
Factors that Affect River Flow
SPATE WATER RIGHTS AND DISTRIBUTION RULES
Field water distribution
The Cell Membrane Biology A/Cells.
FIELD WATER DISTRIBUTION
Rivers & Watersheds.
Erosion and Transportation
DRINKING WATER PONDS IN SPATE IRRIGATION SYSTEMS
Presentation transcript:

CASE: SOIL BUNDS IN PAKISTAN 6.7 CASE: SOIL BUNDS IN PAKISTAN

SOIL BUNDS: MOST COMMON WAY OF DIVERTING WATER Diversion cum guide bunds: In upper part of river, where slope is higher, water force is higher and there are mainly gravel and coarse sand deposits Crossbunds cum guide bunds: In lower part of the river, more gentle slopes, sandy-loamy deposits, water velocity is less

SOIL BUNDS: DIMENSIONS OF SAD/GANDIS IN DI KHAN Length Height Width Draban Zam (in mtr) Sad Swad 351 3.2 10.4 Sad Rabnawaz 754 7.0 12.0 Sad Dinga 330 1.9 15.1 Chaudwan Zam Gandi Abdullah 178 8.0 14.0 Gandi Booki 1350 3.0 Gandi Mullawali 87 4.5 Source: Khan and Marwat, 2004

Constructing soil bunds

Constructing soil bunds Location: Determined by lay of the land Manage water levels and avoid overflow/ flooding In case of cross bund - preferably at angle, try to dissipate energy In case of cross bund -may have upstream offtakes too Construction Look for good loamy soil – avoid gravel and sand Avoid saline soil and do rat control – to prevent piping Develop layer by layer Compaction with bulldozer driving across the bund Protect against animal tresspassing Protect with some vegetation and brushwood Special issue Often flood channels are not well maintained and silted up causing pressure on the soil bunds

SOIL BUNDS: MAINTENANCE

SOIL BUNDS: MAINTENANCE Bulldozer Tractor CCA Draban Zam (hrs) (ha) Sad Swad 410 620 666 Sad Rabnawaz 1000 800 1538 Sad Dinga 400 230 820 Chaudwan Zam Gandi Abdullah 500 644 Gandi Booki 880 1200 769 Gandi Mullawali 20 256 Source: Khan and Marwat, 2004

Reinforcing earthen bunds: Gabions

Reinforcing earthen bunds: plastic sheeting Material Black polyethelene plastic 150-250 micron Cost 0.35 USD/m2 Construction Avoid puncture Use steps to contruct to Avoid slippage Anchor at toe and head Cover with 50 cm soil