Chris Paredis Georgia Tech

Slides:



Advertisements
Similar presentations
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Model Based Systems Engineering (MBSE) using SysML GSFC Systems Engineering Seminar June 8, 2010 Sanford Friedenthal Lockheed Martin
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
English Language Arts and Reading Adoption Supplemental Science Request.
Larry L. Johnson Federal Transition Framework.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
ADTF Informational Session Common Terminology Services 2 (CTS2) XML to JSON Transformation Rules Request For Comment September 16 th, 2013 Cory Endle,
1 IEEE Technology Selection Process Presentation of Contribution C Dan Gal Berlin, September 14, 2004.
Common Terminology Services 2 CTS 2 Submission Team Status Update HL7 Vocabulary Working Group May 17, 2011.
1/28/ :02 PM Healthcare Services Specification Project (HSSP) HL7 Services Oriented Architecture SIG Entity Identification Service (EIS) RFP Discussion.
Work Related to Senate Bill 2202 (effective January 1, 2001)
North Carolina High School Math Task Force Update Summer 2013.
SysML-Modelica Transformation Specification (SE DSIG Meeting, Jacksonville, 3/22/2010) Chris Paredis Georgia Tech On behalf of the SysML-Modelica Working.
System Modeling Assessment & Roadmap WG Meeting Boston, MA June 17, 2014 Eldad Palachi Sandy Friedenthal.
International Workshop 28 Jan – 2 Feb 2011 Phoenix, AZ, USA Modeling Standards Activity Team Model-based Systems Engineering (MBSE) Initiative Roger Burkhart.
SysML Modelica Integration Working Group Report (SE DSIG Meeting, San Antonio, TX, 9/15/2009) Chris Paredis Georgia Tech 1.
SysML-Modelica WG Meeting Robot Example Chris Paredis Georgia Tech Update by S. Friedenthal
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
Status of SysML v2 Planning & Requirements Berlin, Germany June 16, roadmap:sysml_assessment_and_roadmap_working_group.
SysML v2 RFP WG Meeting Introduction
Systems Engineering Concept Model (SECM) Update
Systems Engineering Concept Model (SECM) Update
CTI STIX SC Monthly Meeting
Webinar on the Exposure Draft of CAS Continuing Education Policy
PLM4MBSE working group update
Federal Accountability/ AYP Update
(UNSD introduction followed by open discussion)
Chris Paredis Georgia Tech
We’re going to follow the chronological order of the process.
Proposed SysML v2 Submission Plan
Cost of Service Analysis & Rate Design
Mesh Networking Task Group Process
Overview of the FEPAC Accreditation Process
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
College of Alameda Integrated Planning and Budgeting Process
SEIC ByLaw Revision Project
Systems Engineering Concept Model (SECM) Update
RPPP Policy and Procedures Update
Structure–Feedback on Structure ED-2 and Task Force Proposals
Employee Performance Management System
OPTN/UNOS Thoracic Organ Transplantation Committee
Reliability Standards Development Plan
Ashland Public Schools School Start Time Process
Proposed TGv Selection Process
Item 11 – Conclusions – ETS 2018 WG meeting
On behalf of the SysML-Modelica Working Group
Statewide Accountability
Meetings.
SWE 2.0 – Current Status of Standards
TGn Chair’s Status Update
SysML Modelica Integration Working Group Meeting 3/4/09
CUSC Amendment Panel Recommendation
TGg Report to the IEEE Working Group
Ctclink executive leadership committee May 31, 2018
International Training Centre of the ILO
Current state & Prospects of implementation
Review plan of the nature reporting – update 6
Proposed TGv Selection Process
European Statistical System Network on Culture (ESSnet Culture)
Systems Engineering Concept Model (SECM) Update
Central Valley Water Board Meeting of 29 March 2012
Status of SysML v2 Planning & Requirements
TGg Report to the IEEE Working Group
Implementing the ESS Vision 2020
Budget and Legislative Request
Shareholders Rights Directive II SMPG Task Force Progress Status
SWRADIO DSIG Highlights from this Meeting: Sunday Tuesday
2015 January February March April May June July August September
Presentation transcript:

Chris Paredis Georgia Tech SysML Modelica Integration Working Group Meeting (SE DSIG Meeting, San Antonio, TX, 9/17/2009) Chris Paredis Georgia Tech

Agenda 8:30: Introductions 8:45: Recap of current status 9:00: meeting Andrew Watson Feedback on RFC approach 10:00: Break 10:30: Review of remaining issues in transformation specification 11:30: Responsibilities and timeline

Remaining Issues: Current Phase Substantive: When to use profile? When to use parametrics? «modelicaType» Express constraints on stereotypes more formally (preferably in OCL) Inheritance and redeclaration of packages; packages contained in models Part III: Modelica meta-model Part IV: Correspondence

Remaining Issues: Current Phase Editorial: Fill in gaps in Part I Replace figures with jpg and fix capitalization on stereotypes Reformat information in Part II to updated structure

Remaining Issues: Longterm Arrays Local Type Modifications

Backup slides for meeting with Andrew Watson

Modelica: Dynamic Systems Modeling motor torque

Simple Example SysML Descriptive Model Modelica Model SysML Analytical Model

SysML4Modelica Formal mapping Modelica

Roadmap – Past (1) SysML SysML-Modelica Modelica September 1997 1.0 Specification 1998—2000 1.1—1.4 Specifications March 2003 SysML RFP 2002—2005 2.0—2.2 Specifications December 2005 Initial Modelica-SysML presentation at SE DSIG (Kobi, Paredis) July 2006 Adopted Specification September 2006 Types in the Modelica Language (Broman, Fritzson, Furic) July 2007 Towards Unified Systems Modeling with the ModelicaML UML Profile (Pop, Akhvlediani, Fritzson)

Roadmap – Past (2) SysML SysML-Modelica Modelica September 2007 1.0 Specification 3.0 Specification November 2007 Modeling Continuous System Dynamics in SysML (Johnson, Paredis, Burkhart) August 2007 INCOSE MBSE Project Phase 1 (Lockheed, Deere, Georgia Tech) November 2008 1.1 Specification December 2008 SysML-Modelica Working Group January 2009 1st Face-to-face meeting (Fritzson, Schamai, Paredis) May 2009 3.1 Specification

Roadmap – Current Status SysML SysML-Modelica Modelica March, June 2009 Intermediate Reports to SE DSIG Summer 2009 TGG implementation (Kerzhner) June 2009 ModelicaML Technical Report (Schamai) September 2009 ModelicaML Paper at Modelica Conference (Schamai, Fritzson, Paredis, Pop) SysML-Modelica Transformation Specification TBD 2009 1.2 Specification ParaMagic implementation with OpenModelica Solver Future Modelica Version ? Future Directions? Include modelica standard library also

Options for Future: SysML – Modelica Transformation Specification Request for Comments (RFC) Request for Proposals (RFP) SysML v2.0 Fold SysML-Modelica profile into SysML language Not standardize Working Group has decided to explore the RFC option further

Request for Comments (RFC): Definition Any Contributing, Domain or Platform Member with technology that: is relevant to a current Task Force adoption plan; conforms to all applicable OMG Specifications; and is available in a commercially-available implementation may make an unsolicited Submission to the TFC of the relevant Task Force for presentation to that TF for consideration through a Request for Comments. (Section 4.3, OMG Policies and Procedures, v2.8) For non-controversial specifications that are ready

Request for Comments (RFC): Process Submit to the TFC of the relevant Task Force an unsolicited proposal for adoption through RFC The Task Force which received the proposal may recommend its issuance by its parent TC as an RFC. The TC obtains AB approval and may then, by majority vote, cause OMG to issue the Submission as an RFC. The comment period opens. Any party (including non-members) may send comments. Typically lasts 60 days. TF considers comments and decides, by majority vote, whether to recommend the Submission to its parent TC for adoption If the TF recommends adoption, the parent TC shall obtain AB approval before making a final decision on whether to recommend the Submission for adoption by the Board of Directors, using an electronic poll needing a 2/3 majority to pass

Request for Comments (RFC): Process Possible Timeline Finalize Transformation Specification (December 2009) Reference Implementation (January 2010) Submit RFC proposal (March 2010 meeting) AB approval (March or June 2010 meeting) Comment period (Summer 2010) TF approval (September 2010 meeting) Submission for adoption (December 2010 meeting)

Request for Comments (RFC): Summary Seems appropriate for this non-controversial specification Requires vendor implementation and active user community SysML and Modelica communities are very active Initial discussions with tool vendors: NoMagic, InterCAx, Sparx? OpenModelica, Dynasim (Dassault Systemes) Is faster than the other options Would be the (first?) formal definition of an MDA transformation specification