ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

NAESB Smart Grid Task Force PAP 03 Update Robert B. Burke – NAESB Task Force Co-Chair Jim Northey.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
PacifiCorp-CAISO EIM Initiative Overview
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 PAP8/14 Webconference December 4, 2012.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Charles Hosken, General Manager Imperial Irrigation District
Power Magazine Visuals © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. June 28, 2012.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
1 The Tres Amigas SuperStation VLPGO November 2011.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Transmission Reliability Performance Metrics November 5, 2009 © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved.
D.R.E.A.M Task Force Distributed Resource Energy/Ancillary Market Task Force August 2015 Meeting.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Matthew Rylander EPRI April 20, 2015 Streamlined Method for Determining Distribution.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Enhanced Interregional Transaction Coordination: implementation update Billing and Accounting Working Group January 19, 2011 David Edelson Senior Project.
Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid: Faulted Circuit Indicator]
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Demand Response Analysis and Control System (DRACS)
More Than Smart – A Distribution System Vision © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Dave Geier – VP Electric.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
JOINT WORKSHOP ON MULTIPLE-USE APPLICATIONS. AMS’S 50 MW FLEET FOR SO. CAL EDISON MULTIPLE USE CASE #5: BEHIND- THE-METER DISTRIBUTED ENERGY RESOURCES.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
Modeling DER in Transmission Planning CAISO Experience
A Webinar to Present: Coordination of Transmission and Distribution Operations in A High Distributed Energy Resource Electric Grid Featuring: Lorenzo Kristov,
MTS Working Group January 28, 2016
Transmission-Distribution Interface Working Group Meeting
Agenda TSOG 8th November
Market Continuity Update to TAC Joel Mickey
A new platform for testing TSO-DSO coordination schemes
Asia-Pacific Energy Regulatory Forum
Integrated Planning of Transmission and Distribution Systems
John Dumas Director, Wholesale Market Operations
DCPP Curtailment Guidelines
Interpreting DREAM NPRR 777.
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Grid Integration of Intermittent Resources
Integrating Distributed Energy Resource into Grid Operations
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
ELECTROMECHANICAL INDUSTRIALIST ASSOCIATION
The Management of Renewable Energy
The Future of Demand Response in New England
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.

31st USAEE/IAEE North American Conference
IEC TC57 Smart Grid Activities
New England Electricity Restructuring Roundtable
Integrated Distribution Planning Process
Market Interface Committee
EnergyNet The National Technology Initiative
Coordinate Operations Standard
EE362G Smart Grids: Architecture
PacifiCorp-CAISO-NVE EIM Initiative Overview
Market Interface Committee
Forecasting and Operations CAISO Case
DECISION
Waleed Iftikhar Michel Mabano
The Future Grid and Energy Storage
Presentation transcript:

ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer November 2, 2017 ©  2015 San Diego Gas & Electric Company.  All trademarks belong to their respective owners.  All rights reserved.

2017 T&D Interface Effort Consider longer-term coordination needs and solutions Learn from the experience of new DERs/DERAs coming into the market in 2017 Keep pace with DER-related developments in California and the industry as a whole Better define real-time coordination processes and procedures address potential conflicts between DO operational needs and ISO dispatches

Use Cases Goals Create a foundation for a DERA to participate in ISO DERP program Pathway for simple to complex Define who needs to know what CAISO DO DERP Determine communication needs Protocol IEEE 2030.5 smart inverters Latency Data Document information requirements, data exchange, tools and systems Day Ahead, Hour Ahead, 15 minutes and Real-Time Changes if the DERP is available energy vs dispatchable?

Time scales & modelling tools in electric grid operation Courtesy of Sacha Von Meier and Paul Denholm

Distribution Operations Scenarios Business as Usual Normal Configuration Blue sky day Interconnection study and hosting capacity completed DERA available Business as Usual Abnormal Configuration Interconnection study and hosting capacity not completed DERA unavailable DERA derate only possible if multiple DER, multiple interconnection points on multiple circuits Planned Outage/Maintenance Forced Outage/Emergency

Distribution Operations – Use Cases 2017 Deliverables Written documentation on the wholesale market use cases Internal to WG Subsequent management review and publishing

Distribution Operations – Use Cases Number Use Case Title Use Case Description DER Portfolio Wholesale Distribution High Penetration High DER Penetration No DERA on circuit No 1 Single DER: Wholesale DER with single interconnection point participating in wholesale market DERA under a single interconnection point Yes 2a Multiple DER, Single Circuit: Wholesale DER aggregation, DERA, with multiple DER interconnection points on a single circuit participating in wholesale market DERA under multiple interconnection points on a single circuit 2b Multiple DER, Multiple Circuits: Wholesale DER aggregation, DERA, with multiple DER interconnection points on multiple circuits participating in wholesale market DERA under multiple interconnection points on multiple circuits 3 Single DER: Distribution DER with single interconnection point providing distribution services to DO 4a Multiple DER, Single Circuit: Distribution DER aggregation, DERA, with multiple DER interconnection points on a single circuit providing distribution services to DO 4b Multiple DER, Multiple Circuits: Distribution DER aggregation, DERA, with multiple DER interconnection points on multiple circuits providing distribution services to DO 5 Single DER: Wholesale + Distribution DER with single interconnection point participating in wholesale market and providing distribution services to DO 6a Multiple DER, Single Circuit: Wholesale + Distribution DER aggregation, DERA, with multiple DER interconnection points on a single circuit participating in wholesale market and providing distribution services to DO 6b Multiple DER, Multiple Circuits: Wholesale + Distribution DER aggregation, DERA, with multiple DER interconnection points on multiple circuits participating in wholesale markets and providing distribution services to DO

Data Exchanges ISO DER on HV Aggregated capacity on the high-side bus of the substation transformer From DERP/SC size/bids/meter data DERP size Aggregated DER MW size bid into wholesale market DERP bid MW amount of the DER bid into wholesale market in the appropriate time frame DERP meter data Production data based upon ISO schedule for settlement purposes From DO outage data DO Outage data After the fact distribution outage data that occurred which might impact DERP participation DO DER Amps DER production presented on high-side of the distribution service transformer From ISO schedule? ISO schedule ISO dispatch schedule awarded to the DERP DERP From DO capacity DO capacity Available or unavailable state of the DERP based upon distribution conditions From DO P Node P Node P Node to which the DERP is connected based upon distribution conditions From ISO/SC schedule

Distribution Operations – State 1

Distribution Operations – State 2

Questions? Thomas Bialek Chief Engineer tbialek@semprautilities.com