AMC13XG (XG = Ten Gigabit)

Slides:



Advertisements
Similar presentations
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Advertisements

6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Mitglied der Helmholtz-Gemeinschaft Status of the MicroTCA developments for the PANDA MVD Harald Kleines, ZEL, Forschungszentrum Jülich.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
E. Hazen1 New DCC Status and Software issues Eric Hazen, Phil Lawson, Shouxiang Wu, Jim Rohlf, Arno Heister, Jason StJohn Boston University.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
AMC13 Project Status E. Hazen - Boston University
The Jülich Digital Readout System for PANDA Developments
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
IAPP - FTK workshop – Pisa march, 2013
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
Test Boards Design for LTDB
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
ATLAS calorimeter and topological trigger upgrades for Phase 1
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Current DCC Design LED Board
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
Update on CSC Endcap Muon Port Card
Electronics for MEG-II
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
CoBo - Different Boundaries & Different Options of
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
HCAL Data Concentrator Production Status
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
HCAL DAQ (hardware) Debugging Status
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
DAQ Interface for uTCA E. Hazen - Boston University
New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister,
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Example of DAQ Trigger issues for the SoLID experiment
UK ECAL Hardware Status
The CMS Tracking Readout and Front End Driver Testing
PID meeting Mechanical implementation Electronics architecture
FED Design and EMU-to-DAQ Test
Presentation transcript:

AMC13XG (XG = Ten Gigabit) E. Hazen, D. Gastler, A. Heister, J. Rohlf, D. Zou Boston University Quad SFP+ Optical cage AVR32 uC MMC T3 connector (JTAG, I2C) Spartan-6 FPGA Kintex-7 FPGA With heatsink DDR3 SDRAM Tongue 2 PCB Clocks T3 connector board removed to show internal detail Tongue 1 PCB GbE, Fabric A 2014-02-04 E. Hazen -- HCAL

2014-02-04 E. Hazen -- HCAL

AMC13XG Status Design Status AMC13XG (10Gb upgrade) prototyped Tested extensively including “full crate” (10 uHTR) Issue with clock discovered; fixed with small design change to T2 board only (details next) Updated link to CDAQ commissioned and tested Currently operating at 5Gb/s but could go at 10Gb Production Status Production run including 30 for HCAL started. Some delays due to (1) funding and (2) parts details later in this talk 2014-02-04 E. Hazen -- HCAL

“Almost Full” Crate Test AMC13XG 4x mCTR2d 6x uHTR 5Gb/s backplane link 100kHz trigger rate Fake uHTR data Ran for 12 hours Saving every 220 evts Results: ~3*1014 bits transferred Readout prescaled by 220, saved events checked (all consistent) CRC, BcN, OrN, EvN checked on every event by AMC13 at 100kHz Small number of corrected errors reported, but may be initialization issue Will repeat test with 12 uHTR when available 2014-02-04 E. Hazen -- HCAL

Serial Link Tests (as presented at TWEPP) These tests establish the reliability of the high-speed serial interconnections. In each plot, the horizontal axis represents the time of sampling of the serial data, with 0 representing the ideal time (middle of bit period). The vertical axis represents the threshold voltage used to characterize a bit as '1' or '0'. Backplane Loop-Back @ 5.0 Gb/s AMC Slot 1 (farthest from AMC13) Fiber Optic Loop-Back @ 10.0Gb/s (30m fiber) -0.5 0 0.5 Time Offset [UI] -0.5 0 0.5 Time Offset [UI] Links run with PRBS pattern for ~ 1016 bits with zero errors seen 2014-02-04 E. Hazen -- HCAL

TTC clock update T2 board design updated to add skew adjust on TTC clocks to backplane (based on results from “full-crate” test). Original T2 design Updated T2 design Additional driver added Feedback taken from each fanout device to match clock/TTC phase Delay in M-LVDS drivers not compensated (several ns) Spartan-6 upgraded to XC6SLX45T for extra clock resources 2014-02-04 E. Hazen -- HCAL

Firmware Major update to AMC13 firmware pending Support 3 simultaneous event builders Support arbitrarily large event fragments This is required to support other users, but we plan to use same firmware for HCAL 2014-02-04 E. Hazen -- HCAL

Event Builder Update (I) 2014-02-04 E. Hazen -- HCAL

Event Builder Update (II) Up to (3) 10Gb/s outputs per crate 1-FED mode Single event builder for 12 AMC slots, 1 link out 2-FED mode Two event builders for 6 slots each, 2 links out 3-FED mode Three event builders for 4 slots each, 3 links out 2014-02-04 E. Hazen -- HCAL

FPGA Resources Kintex-7 XC7K325T-2FFG900 utilization: FF 9% LUT 21% memory LUT 8% BRAM 56% BUFG 31% MMCM 20% PLL 30% Previous estimate 60% this is correct value with all currently-known features implemented. (LUT memory and DDR3 SDRAM are both available if BRAM use exceeds 100%) This includes all the mentioned firmware upgrades plus 3 DAQ link outputs. The Spartan-6 FPGA utilization was below 20% on all resources, and has been upgraded to a larger part for the clock fix, so it is not an issue. 2014-02-04 E. Hazen -- HCAL

Funding etc Orders for 80+ AMC13 received (roughly 50:50 US:Euro) Funding sorted out (draft SOW in hand) for production of ~ 50 modules plus required engineering Remainder of modules to be produced through CERN (possibly with US supplier) 2014-02-04 E. Hazen -- HCAL

Production Status New T2 design will be prototyped (qty 2 assembled) and tested before committing to bulk assembly (all PCBs received) Purchasing begun for a large run of AMC13XG (65 pcs, some for G-2). Currently several long lead time items, so we are looking at first boards received end April :( We have cast a wide net to try to track down the parts in stock through overseas distribution Difficult parts: Kintex-7 FPGAs currently due 3/28 DDR3 Memory currently due 3/1 Various samtec currently due 2/14 Harting AMC conn. currently due 2/14 Xilinx are the most problematic. 2014-02-04 E. Hazen -- HCAL

Software Re-write of AMC13 software beginning Change from flat address table to hierarchy Remove extra class layers so that base class for AMC13 calls uHAL directly Re-write command line tools Assist in development of generic GUI which can support AMC13 using new address table scheme Re-write AMC13 XDAQ support to be more generic (usable by other subdetectors) 2014-02-04 E. Hazen -- HCAL

Summary Design complete Firmware updates underway Funding secured Production delayed due to parts issues Not (yet) a problem for HCAL? 2014-02-04 E. Hazen -- HCAL

Backup 2014-02-04 E. Hazen -- HCAL

2014-02-04 E. Hazen -- HCAL

Optional AMC13 T3 Board Cu input for clock, control signals Used for TCDS (TTC/TTS system upgrade) Courtesy Magnus Hansen 2014-02-04 E. Hazen -- HCAL

2014-02-04 E. Hazen -- HCAL Preprint:JINST_101P_1113 [TWEPP-13] Authors :E. Hazen, A. Heister, C. Hill, J. Rohlf, S.X. Wu, D. Zou Title :The AMC13XG: A New Generation Clock/Timing/DAQ Module for CMS MicroTCA JINST_101P_1113 has been published as: 2013_JINST_8_C12036 Available at : http://dx.doi.org/10.1088/1748-0221/8/12/C12036 2014-02-04 E. Hazen -- HCAL

New Data Format (proposed) 2014-02-04 E. Hazen -- HCAL