WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM

Slides:



Advertisements
Similar presentations
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Advertisements

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
EU policy objectives and European research on Smart Grids European Commission, DG Research Henrik Dam Research Programme Officer ADDRESS international.
Review of eStorage’s first year results WP3 Benefits of Storage and Regulatory Framework & Market Design 30 October 2013 Wim van der Veen - DNV KEMA.
Integrated Growth Pillar 1 of the SEE 2020 Strategy SEEIC Meeting Sarajevo, 19 June 2013.
DOCUMENT #:GSC15-PLEN-53 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.11 CONTACT(S):Emmanuel Darmois, Board Member Marylin Arndt, TC M2M chair Smart.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
EUROPEAN REGIONAL DEVELOPMENT FUND Stakeholder Workshop Brussels – 5 February 2014 INTERREG EUROPE Nicolas Singer | Senior Project Officer INTERREG IVC.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
SIMONA MURRONI Bruxelles - June 27th 2013 Bridging lessons learned from the past with new planning and delivery approaches in the energy sector.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
Eric Peirano, Ph.D., TECHNOFI, COO
Storage Technologies and Sector Interfaces
THE EU FRAMEWORK PROGRAMME
WG3 Flexible Generation
ETIP SNET WG4 : Digital Energy
First ETIP SNET regional workshop, Aachen, 18 September 2017
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
ICT22 – 2016: Technologies for Learning and Skills ICT24 – 2016: Gaming and gamification Francesca Borrelli DG CONNECT, European Commission BRUXELLES.
Eric Peirano, Ph.D., TECHNOFI, COO
Eric Peirano BRIDGE Support Team, Technofi
Chairman of the Board and CEO,
Storage Technologies and Sector Interfaces
10 year investment plan ERGEG approach and contribution
19th GRI Coordination Group meeting
WG3 Flexible Generation
EERA e3s and Energy Consumers
WP1 – Smart City Energy Assessment and User Requirements
ICT PSP 2011, 5th call, Pilot Type B, Objective: 2.4 eLearning
Ben Voorhorst, President, ENTSO-E
PowerTech 2017, Manchester| 19 June 2017
WG3 Flexible Generation
Storage Technologies and Sector Interfaces
Nikos Hatziargyriou, ETIP SNET Governing Board Chair
Key topics to support the Clean Energy Package
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
ACER’s view on the future role of the Gas Regional Initiative
Pentalateral Energy Forum
ETIP SNET + JRC Outcome of the South Eastern + Islands Workshops
Energy Group Meeting Brussels, 14 September 2016 Luc van Dyck
WG Belgian Grid Implementation Network Codes.
Thierry LE BOUCHER, ETIP SNET Governing Board vice-Chair
Cohesion Policy and Cities
Overview of working draft v. 29 January 2018
The ERA.Net instrument Aims and benefits
Eric Peirano, Ph.D., TECHNOFI, COO
AMICI WP1 – Management, coordination and dissemination
Portuguese Presidency
Walter Boltz Chairman, CEER Gas Working Group
GPC WG and GPC meeting 5th of June “Future of Joint Programming”
Sustainable Energy Europe
Joint programming actions
Regulation for Smart Grids
The SDGs in Flanders November 27, 2018.
Thematic workshop 2 – Smart Energy Systems Brussels, 8 November 2013
ETSI Standardization Activities on Smart Grids
Fitness Check of EU Freshwater Policy
European energy policy
ACER’s view on the future role of the Gas Regional Initiative
STRUCTURE AND METHODS OF CO-OPERATION
European Technology and Innovation Platform on Renewable Heating and Cooling - Geothermal Panel - Webinar 12th December 2018.
Scene setter European Commission DG Environment
July update JANUARY 2019.
Energy Storage Roadmap & Flexibility Roadmap Information Session
Past: TP Geoelec Review on activities (Vision, SRA, Roadmap)
Presentation transcript:

WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM

SUMMARY ETIP-SNET’s role is to guide Research, Development & Innovation (RD&I) to support Europe’s energy transition. WG1 is focused on system aspects, addressing the main functionalities, quality and efficiency of the electricity system as such and considering the benefits of its integration with the other energy vectors. WG1 activity is mainly devoted to provide support in developing: ETIP SNET vision, SET Plan Action 4.1 Implementation Plan and SET Plan Action 4.2 Implementation Plan Next year activities will be concentrated on on-going projects, monitoring and knowledge sharing, updating ETIP-SNET 10-year roadmap, interacting with EC in the definition of the new framework program for Research & Innovation, Good afternoon, Thank you for attending this meeting. I am the co-chair of WG1… representing EDSO… I work for Enel Without repeating what has been said before, the role of the ETIP SNET is to guide the Research, Development and Innovation to support the Europe’s Energy transition. That is the global framework. Within the ETIP SNET, the WG1 is focused on the optimization of the whole energy system, therefore focussing on the system aspect, addressing the main functionalities, the quality and the efficiency of the electricity system, and to consider all the benefit of its integration with other sectors, coupling with gas and heat sectors for example. The WG1 has made a good work already this year, so we made a contribution to three main activities, ETIP SNET vision, which is an ongoing activities SET Plan Action 4.1 Implementation Plan (an optimized European power grid) and SET Plan Action 4.2 Implementation Plan (Integrated local and regional energy systems) Here we are talking about the IP of the SET Plan (not the IP of the ETIP SNET). Next year we will focus on monitoring and making available the exchange of best practices and knowledge sharing betwenn ongoing project, we will give a contribution to update the next 10 years etip snet roadmap (so 2020 – 2029) and we will interact with the EC in order to help the definition of the next Framework Program after Horizon 2020. + Bridge cooperation, Participation in some National Stakeholders forums, etc… Also: White papers (to be confirmed) on grid related topics CIRED paper and/or poster

CONTENTS WG1 mission WG activity ETIP SNET vision, SET Plan Action 4.1 Implementation Plan and SET Plan Action 4.2 Implementation Plan I will introduce briefly the WG1 mission, and the details and then explain the activities that have been performed this year.

WG1 MISSION Specific objectives Addresses the mid and long-term business and technology trends contributing to the overall energy system optimization at affordable investment and operation costs, with particular reference to system development scenarios, network planning, operation, observability and control, asset management, flexibility as seen from the system aspects and resilience Focus on system aspects, addressing the main functionalities, quality and efficiency of the electricity system as such and considering the benefits of its integration with the other energy vectors WG1 follows on Set Plan Action 4: Grid smartening in the sense of grid observability and controllability, which bring to the system improved forecasting and operation, tools for managing the variability and uncertainty of operational conditions at several timescales and increased grid hosting capacity. The economic efficiency of the system through the use of ICT (Information and Communication Technology) equipment’s as well as through the implementation of appropriate market design The specific objectives are related to the energy system, in terms of mid and long-term business and technology trends in order to make the overall energy system optimization as much affordable as possible, making the investment and operation costs optimized taking in to account all the actors and users connected to the network, with particular reference to system development scenarios, network planning, operation, observability and control, asset management, flexibility as seen from the system aspects and resilience Focusing on system aspect, WG1 follows on Set Plan Action 4 (4.1 and 4.2): Grid smartening what does I t mean ? It means enhancing the grid observability and controllability, to bring to system an improved forecasting and operation, tools for managing the variability and uncertainty of operational conditions at all timescales and to increase the grid hosting capacity. Beyond that, we also evaluate and try to optimize The economic efficiency of the system thanks to ICT (including also new tools, and components aiming at digitalizating the networks) and also taking into account an adequate market framework so defining future market framework to enable the energy transition to happen

Subjects to be considered WG1 MISSION Subjects to be considered Power System modernisation and increased cross-border connections capacities Transmission/Distribution network expansion and investments based on a ‘connect and manage’ approach Integration within the energy system Market aspects There are 4 main aspects that should be addressed by WG1, so we these 4 pillars Power System modernisation and increased cross-border connections capacities: which means: Optimising the existing assets and the network capacity making use of new technologies Developing pan-European electricity highways with both AC and DC technologies Studying and demonstrating new grid architectures both at transmission and distribution level as a source of flexibility. Decreasing the environmental footprint of the network reinforcements. Developing new planning tools to account for the full complexity of electricity networks (distributed and intermittent generation, variable and controllable loads, power electronics, storage, etc.). Transmission/Distribution network expansion and investments based on a ‘connect and manage’ approach: which means we have already moved from a “fit and forget” approach to a “connect and manage” way. This relies on a close collaboration between DSOs and TSOs, and between those two actors and the users connected to the network Standardizing and making interoperable system architecture, protocols and data models. Optimal management and activation of local flexibilities. Accelerating the large scale deployment and validation of advanced automation and control solutions Increased exchange of information between TSOs and DSOs Increased TSO collaboration The Integration within the energy system is understood as the synergy that could be found between the energy systems and other sectors, like gas, heat and their interfaces: Strong coupling with the gas network (via power to gas technologies) offering storage and flexibility via large CHPs, Strong coupling with heat pumps in e.g. district heating networks Interacting with the gas network for storage of chemical energy. Interacting with the heat network for storage of thermal energy. Interacting of the transmission and distribution grids with the gas and heat networks so as to better operate the power system. Optimising the (whole) energy system All of this relies on a adequate Market aspects: Defining activities of new players in both the wholesale and retail markets Optimizing the integration of market and network operations all time scales (from long-term to real time). Integrating new market players providing system services. Participating in the assessment of the regulatory framework for storage operations and the associated remuneration of system services. Enabling well-functioning retail markets so as to empower the end users.

Five fields of activity in 2017 WG1 ACTIVITY Five fields of activity in 2017 Comments on EU WP 2018-2020 Comments on ETIP SNET Implementation Plan TF 1: Colaboration on ETIP SNET Vision of the Energy System TF 2: Input on SET Plan TWG4: 4.1 Targets & Action Plan TF 3: Input on SET Plan TWG4: 4.2 Targets & Action Plan TF 2 & 3: input on the TWG4 fiches of the SET PLAN IP Additionally, WG1 is providing support to Intensys4EU team on the Regional workshops for outstanding national/regional projects monitoring & knowledge sharing. In 2017, this year we have made some contribution of the recently reléased Work program 2018-2020 of the EC horizon 2020, We have made comments on the ETIP SNET Implementation plan Officially presented by ETIP SNET Chair Konstantin Staschus at the EUW Oct 6 in Amsterdam 4 priority areas for R&I funding for the future energy networks . . Then we have divided the Group into three main task forces, cause we are leveraging on a pool of more tan 40 experts from several sectors. Small groups dedicated on specific targets. The first one is dedicated on the collaboration for the ETIP SNET visión. The process has started, and the visión doc first draft should be prepared by January 2018, and should be finalized and approved by June 2018. The next TF is dedicated to the inputs to the TWG4 action 4.1: refining the targets based on output-based approach. If we already targets in the past, we try to make them more tangible and concrete, so what we want to achieve with tangible results is to allow the EC to measure the results of the R%D innitiatives. And the last task force is helping to define targets also for Action 4.2, those targets were not fully defined in the past. Still with an output based approach. Additionally, WG1 is providing support to the Intensys4EU team, therefore to support the EC in managing all the relationships with stakeholders and organizing and participatin in workshops, such as the Regional workshops for outstanding national/regional projects monitoring & knowledge sharing.

WG1 ACTIVITY: Vision TF 1 ETIP SNET Vision Is a high level document in line with the Vision and Strategy for European Electricity Networks of the Future (ETP Smart Grids in 2006) and with the Vision document developed at European level for the Aviation sector. Considers aspects such as the central role of Europe as sector leader, the environmental concerns, the energy system scenarios, the inclusion of the consumer, the necessary innovation requirements etc. Considers targets 2030 and progressively 2050 Leverages the European Energy Scenarios (2030 and 2050), EHighWay2050-Scenario analyses, TYNDP 2016/2018 (Draft) Scenarios Vision (document publication) target date is in 12 - 18 months INTENSYS4EU coordinates the work of gathering and distilling the final vision document. Just to focus on the Vision process, the vision document is a high level document, based on existing scenarios, it is not a new scenario, but it should rely on selected scenarios such as European Energy Scenarios (2030 and 2050), EHighWay2050-Scenario analyses, TYNDP 2016/2018 (Draft) Scenarios It should consider the targets that we want to achieve until 2030 and 2050. this should be also in line with the existing vision that was released ten years ago by the ETP Smart Grids. The document should look like the vision document that was developed at EU level for the aviation sector, as it is good benchmark to have very short, precise and challenging document. ETIP SNET Vision Development – 12 - 18 months process Set up of a Vision team, of max. 10 persons by April 2017 Finalisation of vision by January 2018 Approval by ETIP SNET Governing Board by March 2018 Publication of Vision by June 2018

TFs 2 & 3 Updating targets Action 4.1 & 4.2. WG1 ACTIVITY: TWG 4 TFs 2 & 3 Updating targets Action 4.1 & 4.2. SET Plan – Declaration on Strategic Targets in the context of an Initiative on Energy Systems (Brussels, 19th October 2016) Strategic Targets for Action 4.1) An optimised European power grid (by 2030) Grid observability and controllability, Demand response, flexible Generation, Energy storage Strategic Targets for Action 4.2) Integrated local and regional energy systems Integrated local and regional energy systems, Management of energy networks, Minimising the consumption of non-renewable resources, Flexibility of the energy system, Resiliency, …. Updating the targets for Action 4.1 and 4.2. In october last year, the EC within the SET PLAN Context released a declaration on Strategic Targets in the context of an Initiative on Energy Systems. Based on this document, we are going into the details so what does it means? So for targets for Action 4.1 we are talking about Grid observability and controllability, Demand response, flexible Generation, Energy storage And all of these topics are being covered by the WG of the ETIP SNET. For Acion 4.2 we are talking about the Integrated local and regional energy systems. So synergies with other sectors and also considering the specificities of local or regional requirements and peculiarities, still at EU level but focusing on regional differences.

TF 2 ETIP SNET Vision – Inputs to TWG Action 4.1 WORK SCHEDULE FOR 2017 TF 2 ETIP SNET Vision – Inputs to TWG Action 4.1 Time schedule: for reformulating the targets for developing a joint action plan End May – End October April 28 Initial proposal from TWG A4 chairs for reformulation of Targets 4.1 to member states nominated members of TWG A4 April 28 – May 30 Collection of feedback / input from MS nominated TWG A4 participants as well as collection of initial feedback from ETIP SNET and it´s WGs May 30 ETIP SNET governing board meeting - Discussion and consolidation of feedback on targets from ETIP SNET and its WGs Targets have been defined in april may now the action will be presented in Bratislava in a few days.

TFs 2 & 3 TWG4 fiches of the SET PLAN Implementation Plan TF2 & TF3 discussion TFs 2 & 3 TWG4 fiches of the SET PLAN Implementation Plan The Temporary Working Group of Action 4 has prepared “fiches” which will be core for the set plan implementation plan of member states. In the end one or more fiches will address each target of the declaration and will focus on targets addressed, TRL increase, deliverables, timeline, budget, consensus, instruments, … WG1 is invited to contribute to the discussion on fiches which are available as living documents at Expera platform 2 volunteers (one for A 4.1 and one for A 4.2) have got full access to the expera platform and can add the results of our discussions to the living document and will act as interface of WG1 and TWG A4.

Thank you for your attention info@etip-snet.eu www.etip-snet.eu