Introduction to W7-X Coil Testing at CEA – Saclay, France

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
CRYOGENICS AND POWERING
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
ESS Vacuum Standardization
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
S A Griffiths CM42 June 2015 Electrical & Control.
Introduction to W7-X Coil Testing at CEA – Saclay, France G.Croari – March 2008.
SIS 100 Vacuum chamber Recooler String system Components
Teleconf ACS – FREIA 28th March 2017
Instrumentation for status monitoring of SST-1 superconducting magnets
Installation of the T600 at Fermilab
Final doublet: future activity plan
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
at STFC Daresbury laboratory
Cryogenic behavior of the cryogenic system
HFM Test Station Main Cryostat
EPFL-SPC, 5232 Villigen PSI, Switzerland
R&D of neutrino beam production for future (Multi-)MW proton facility:
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Test plan of ESS HB elliptical cavity
CRYOGENICS OPERATIONS 2008 Organized by CERN
Horizontal Tests in a Vertical Cryostat
Preparation of Components for the Mounting of
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ILC Experimental Hall Cryogenics An Overview
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Overarching Commissioning Plan
Schematic diagram of the cryogenic system
ISRC and LEBT Vacuum System Design
LEBT water cooling system
Cryogenic behavior of the magnet
Door Heat Exchanger: Specification
Thermohydraulic behaviour of the cryogenic system
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Introduction to W7-X Coil Testing at CEA – Saclay, France G.Croari – Barth seminar 2008

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC Outline Test facility description Coil test procedure Conclusion G.Croari 1/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC Outline Test facility description Coil test procedure Conclusion Cryostats, valve boxes, satellite Power supply Pumping system Cryogenic part (Refrigerator/liquifier) Data acquisition system G.Croari 1/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC Outline Test facility description Coil test procedure Conclusion Cryostats, valve boxes, satellite Power supply Pumping system Cryogenic part (Refrigerator/liquifier) Data acquisition system Documentation Incoming Inspection tests Coils into cryostat Outgoing check G.Croari 1/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC Outline Test facility description Coil test procedure Conclusion Cryostats, valve boxes, satellite Power supply Pumping system Cryogenic part (Refrigerator/liquifier) Data acquisition system Documentation Incoming Inspection tests Coils into cryostat Outgoing check My contribution G.Croari 1/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1. Test Facility Description Cryostats, valve boxes, satellite Power supply Pumping system Cryogenic part (Refrigerator/liquifier) Data acquisition system G.Croari 2/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.a) Cryostat, Valve boxes, Satellite Cryostat 1 Valve box C 1 Satellite Valve box C 2 Cryostat 2 Test Frames G.Croari 3/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.a) Cryostat, Valve boxes, Satellite Cryostat detail Connections for Coil A Nitrogen Shield Connections for Coil B G.Croari 3/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.a) Cryostat, Valve boxes, Satellite Valve box detail Valves Current leads G.Croari 4/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.a) Cryostat, Valve boxes, Satellite Valve box detail Safety Valves Cablings Calibration Leak G.Croari 4/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.b) Power Supply Input: 380 Vac 3-phase Simplified schematic Transformer Thristors Iout Load G.Croari 5/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.b) Power Supply Input: Max absorption 980 A Nominal Power 700 KVA Water cooled Output: Max current 25KA Max Voltage 10V Regulation: <+-10 E-4 on inductive Loads <+-10 E-3 on resistive Loads G.Croari 5/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.c) Pumping System G.Croari 6/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.c) Pumping System Primary system ( 5 E – 3 mbar ) Secondary system ( 1 E – 6mbar ) G.Croari 6/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.d) Cryogenic part: Refrigerator / Liquifier Cold Box Nitrogen Exchanger Heat Exchangers Turbine Cold Helium G.Croari 7/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.d) Cryogenic part: Refrigerator / Liquifier Specifications of cold part: Total mass flow rate 46 gr/sec LHe @ 300 K Refrigerating power = 200W @ 4,2 K LHe production = 70 Lt / hour 5000 Litres LHe tank G.Croari 7/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.e) Data Acquisition System Signals: Voltage drops Mass flow meters Current of Power Supply Pressure drops Temperature sensors Strain gauges Extensometer Coils & Test Facility Coils G.Croari 8/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 1.e) Data Acquisition System Sampling rates table   Sensor type Voltage Current Others Condition - Cool down / Warm up (phase 1) 0.025Hz - Cold Test day (phase 2) 1Hz - Quench / Fast Discharge (quench) 5kHz 100Hz G.Croari 8/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2. Coil Test Procedure Documentation Incoming Inspection tests Coils into cryostat Outgoing check G.Croari 9/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.a) Documentation Scope and Requirements G.Croari 10/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.a) Documentation Scope and Requirements Documentation 10/15 G.Croari 10/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.a) Documentation Scope and Requirements Documentation Non Conformrmity Report G.Croari 10/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.b) Incoming Inspection Tests Unloading from the lorry G.Croari 11/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.b) Incoming Inspection Tests Unloading from the lorry Installation under a test frame G.Croari 11/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.b) Incoming Inspection Tests Unloading from the lorry Installation under a test frame Bending and Joint box installation G.Croari 11/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.b) Incoming Inspection Tests Unloading from the lorry Installation under a test frame Bending and Joint box installation Cablings and tests: Temperature sensors, Strain gauges, Extensometers G.Croari 11/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.b) Incoming Inspection Tests Unloading from the lorry Installation under a test frame Bending and Joint box installation Cablings and tests: Temperature sensors, Strain gauges, Extensometers QD Wire check, DC insulation test G.Croari 11/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.c) Coils Into Cryostat Coil at open cryostat: QD wire check, DC test G.Croari 12/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.c) Coils Into Cryostat Coil at open cryostat: QD wire check, DC test Under Vacuum: Leak test Calibration leak Coil leak G.Croari 12/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.c) Coils Into Cryostat At open cryostat: QD wire check, DC test Under Vacuum: Leak test Coils at cryogenic temperature:  Current test  AC test, DC test G.Croari 12/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.c) Coils Into Cryostat At open cryostat: QD wire check, DC test Under Vacuum: Leak test Coils at cryogenic temperature: Current test,  AC test  DC test AC test is to test the interlayer insulation G.Croari 12/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.c) Coils Into Cryostat At open cryostat: QD wire check, DC test Under Vacuum: Leak test Coils at cryogenic temperature: Current test, AC test,  DC test  DC test is a general check of insulation G.Croari 12/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.d) Outgoing check Before shipment: QD wire check Outgoing check G.Croari 13/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 3. Conclusion My Contribution G.Croari 14/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2) Conclusion Coil testing is about 60 % accomplished The testing rate increased significantly from 2 coils / year in 2003 up to 18 coils / year in 2007 A failure can be considered as a chance to learn more G.Croari 15/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC 2.a) My contribution Daily work: What I would like to improve: Daily communication between CEA and IPP La Langue Française Documentation in case of unexpected behaviour during test Control Systems Understanding of the test facility Data Acquisition Systems G.Croari 15/15 irfu / SACM

Wendelstein 7–X training seminar Barth, April 23 - 24, 2008 Max-Planck-Institut für Plasmaphysik 1-YKB01 MC Thanks to... CEA: L.Genini B.Renard L.Vieillard All the French technicians IPP: H.Viebke K.Hertel J.Baldzuhn H.Ehmler G.Croari irfu / SACM