ECAL project in the future 2-3 years

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
The collaboration has been created in 2002 for 5 years > Developpment of the software for PFA > Design, construction of prototype to test with beam the.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
SiD Detector Baseline (A brief review) Andy White University of Texas at Arlington.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Sohail Amjad, Roman Pöschl LAL Orsay Guard ring studies for SiW Ecal of ILD CALICE Collaboration Meeting Cambridge/UK Sept
ILC Detector Design D_R/R_1 FJPPL Project Application Akiya Miyamoto KEK FJPPL Workshop at Tsukuba May, 2009.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Final CALICE OsC meeting: Status and summary of project
ILD status report Yasuhiro Sugimoto KEK for the ILD concept group
Test Beam Request for the Semi-Digital Hadronic Calorimeter
100th meeting Ties Behnke, DESY
CALICE Meeting Tokyo University, 26/09/2017
Status of Ecal(s) for ILD
CLIC detector at SiD meeting 28/3/2010
Sub-Detector Assembly Area Summary of discussion at ALCW2015
C. de La Taille IN2P3/LAL Orsay
Status of International Collaboration for CEPC Detectors R&D
Toward the final design of a TPC for the ILD detector
prototype PCB for on detector chip integration
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
ILC Detector Technology
Michele Faucci Giannelli
Calice Tile-HCal and Tail-catcher/Muon Tracker
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

ECAL project in the future 2-3 years End of 2012 is the end of an era… R&D era . DBD delivery is done. Now What ? If we believe in the FAST TRACK scenario. ACCELERATOR DETECTOR (ECAL) Decision <2015 Techno. Choice < 2015 Start Construction = 2017 TDR 2017 Start construction =2018/2019 ? From the R&D phase to pre-production phase. The work is not the same. In the new era, we need take into account The cost, organisation, steering of the project The industrial aspects (production, quality test, minimizing transport cost,etc…) The performances for √s going from 90 GeV to 250-600 GeV ILD ECAL meeting - Dec. 2012

For this scenario The TODO list for 2013-2014 ILD ECAL meeting - Dec. 2012

optimise the detector for √s going from 90 GeV to 250-600 GeV (internal radius ecal entrance, pixel size, number of layers, acceptable guardring zone, etc…) THEN Mechanical study of module Barrel and Endcap PCB with cost effective performances (thickness, flatness, etc…) VFE packaging must be studied , without stopping R&D for embeded VFE SLAB in real life (HV, LV, ASU connexion, etc…) ECAL DAQ specific card Etc… A different structure and organisation is mandatory !!! to discuss with industry, with funding agency, with ILC board … ILD ECAL meeting - Dec. 2012

ORGANISATION ILD ECAL meeting - Dec. 2012

The electromagnetic calorimeter is The most expensive The most difficult technically (Silicon, strip, VFE, ultra thin PCB, etc…) The most difficult to organise and build The ECAL is project by itself We need meeting for ECAL… no more time to spend to calibration of the LED system for AHCAL(CALICE) … it is more important to have interaction with people like Miyamoto-san working on detector optimisation International Collider Ecal Project Phase -1 ICEPP-1 ILD ECAL meeting - Dec. 2012

Multipolar organisation For the production of one detector …….. Example of CMS tracker ILD ECAL meeting - Dec. 2012

ILD ECAL meeting - Dec. 2012

POSSIBLE ORGANISATION 2 Project Leaders (Japan, France) ILD board Steering board …. TECHNICAL BOARD RESSOURCE BOARD FINANCE Board Manpower Board PHYSICS & SOFTWARE GROUP Technical R&D GROUP Production GROUP Commissioning GROUP Reporting to FA SI. Wafers design Impact on performances Guardring, Cuting, matrices size… Silicon Production SLAB group Silicon wafers QT Gluing on ASU Event reconstruction Gluing Production Calibration on ASU SLAB assembly Production . ILD ECAL meeting - Dec. 2012

POSSIBLE ORGANISATION VISITING SILICON PRODUCERS 2 Project Leaders (Japan, France) VISITING SILICON PRODUCERS ILD board Steering board …. TECHNICAL BOARD RESSOURCE BOARD FINANCE Board Manpower Board PHYSICS & SOFTWARE GROUP Technical R&D GROUP Production GROUP Commissioning GROUP Reporting to FA Silicon Wafers design Impact on performances Guardring, Cuting, matrices size… Silicon Production SLAB group Silicon wafers QT Gluing on ASU Event reconstruction Gluing Production Calibration on ASU SLAB assembly Production . ILD ECAL meeting - Dec. 2012

ECAL project collaboration could be open to US –SID group (SLAC, Oregon Univ.) embedded in ILD and SID (groups remains member of) not embedded in CALICE (but some groups could be part of it) the structure which will discussed with funding agency, with PAC, etc.. and with the ILD/SID and ILC detector board the collaboration which will give information to ILD board for the technology choice and report to ILC Board the organization which will fund and test a prototype for FINAL PROJECT Act as a collaboration (review of papers, reports, speakers bureau, etc…) ILD ECAL meeting - Dec. 2012

We are entering in phase transition SUMMARY We are entering in phase transition CALICE was the good tools for prototype R&D It is not the optimum for the new phase I propose to all people working on ECAL for ILC To collaborate within a new organsation . This structure will be part of ILD(SID if US join) This structure will be dedicated to ECAL only Declaration of intent (or express of interest) For the design, construction, commissioning of ECAL for ILC - ACTION in 2013 ILD ECAL meeting - Dec. 2012