MC-based Risk Analysis on the Capacity of Distribution Grids to Charge PEVs on 3-ph 0.4-kV Distribution Grids Considering Time and Location Uncertainties.

Slides:



Advertisements
Similar presentations
RES-E Impact on Transmission Grid and Power System Reserves
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Planning, optimization and regulatory issues
The future Role of VPPs in Europe Pan European Balancing Market: EU-FP7-Project eBadge Workshop on DSM Potentials, Implementations and Experiences 20 th.
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
May 11, The role of electric mobility in future Energy Systems Dr. ir. Zofia Lukszo With collaboration with dr. Remco Verzijlbergh Section Energy.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
Mathias Rauch, Deputy Director
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Irlands Smart Grid: Möglichkeiten für Deutsch-Irische Kooperationen The Micro Smart Grid as a best practice example: Interconnected.
Economic assessment of electric vehicle fleets providing ancillary services Eva Szczechowicz, Thomas Pollok, Armin Schnettler RWTH Aachen University
2015 World Forum on Energy Regulation May 25, 2015
Demand Response – A New Option for Wind Integration ?
Frankfurt (Germany), 6-9 June 2011 Power System Impacts from Large Scale Deployment of EV -The MERGE project – João A. Peças Lopes
Campus da FEUP Rua Dr. Roberto Frias, Porto Portugal T F © 2009 Integração.
Frankfurt (Germany), 6-9 June 2011 ENEL Group Italian core European base Worldwide strategy Italy’s largest power company. Europe’s second listed utility.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Frankfurt (Germany), 6-9 June 2011 Greet Vanalme – NL – RIF Session 6 – Paper 0786 The introduction of local system services – the case of storage in the.
Frankfurt (Germany), 6-9 June 2011 SCHEDULING CHARGING OF ELECTRIC VEHICLES FOR OPTIMAL DISTRIBUTION SYSTEMS PLANNING AND OPERATION David STEEN*Anh Tuan.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Electric vehicle integration into transmission system
Frankfurt (Germany), 6-9 June 2011 Steven Inglis – United Kingdom – RIF Session 5 – Paper 0434 Multi-Objective Network Planning tool for the optimal integration.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
Charging Electric Vehicles in a Liberalized Electricity Market Danny Geldtmeijer MSc Netbeheer Nederland / Enexis.
Frankfurt (Germany), 6-9 June 2011 M. Khederzadeh Power & Water University of Technology (PWUT) Tehran, IRAN. M.Khederzadeh – IRAN – RIF S3 – Paper 0066.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
SmartGrids for e-mobility Connecting electric vehicles to the local grid BEAMA 2011 Roger Hey Energy Projects Manager Central Networks 1.
INES ® – the innovative system solution for decentralised distribution grid automation Intelligent distribution grid management Torben Braje, product manager,
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Local Intelligent Networks and Energy Active Regions in Flanders Carlo Mol - VITO.
Andrea Ricci - ISIS Brussels, 12 April 2012 Policy conclusions and way forward.
EDGE Meeting February Reza Ahmadi Kordkheili Birgitte Bak-Jensen Jayakrishnan R. Pillai.
Évora demonstrator site
SmartNet: A European research project to study TSO-DSO coordination for ancillary services provision from distribution networks Gianluigi Migliavacca (RSE)
E-Mobility Challenges and Opportunities
ELEC-E8422 Introduction to Electrical Energy Systems
Smart Grid Paul Bircham Commercial Strategy & Support Director.
© 2016 ProsumerGrid, Inc., All Rights Reserved
Distribution System Analysis for Smart Grid
Eric Peirano BRIDGE Support Team, Technofi
ESRDC Overview for Load Management
Presentation of the three technological pilots
RealValue H2020 Overview RealValue project funded under H2020 LCE 8 – 2014: Local / small-scale storage Commenced 1st June 2015 (duration 36 months) EU.
Évora Demonstrator Site
ADDRESS Interactive energy
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Dynamic Transmission Network Behavior for DER Power Systems
Electricity Distribution Network Design Training & Courses
India Smart Grid Week, 2016 Yogendra Patwardhan
Experiences from Major Smart Grid Demonstrators
Smart Grid Subcommittee Report
MIGRATING TOWARDS A SMART DISTRIBUTION GRID
Optimization of the Energy-Supply-Structure of modern Aircraft by using conventional power system technologies Dipl.-Ing. Ilir Purellku Electrical Power.
12th IEEE PES PowerTech Conference
2500 R Midtown Sacramento Municipal Utility District
EnergyNet The National Technology Initiative
ISMB – Smart Energy activities
Case Studies on Field Deployment of PV Battery Storage Systems
Incentives for electricity infrastructure – ERGEG view
Svetlana Rybina, Lauri Holopainen
Arslan Ahmad Bashir Student No
Jakov Chavez Vega Kalle Valtavirta
ELEC-E Smart Grid Electric vehicles and their charging systems
The Global Forum Electricity Ancillary Services and Balancing | Berlin, SmartNet Pilots: The demonstration of the different TSO-DSO coordination.
Rural Energy Opportunities and Challenges
ELEC-E Smart Grid Smart Meters and Security Issues
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

MC-based Risk Analysis on the Capacity of Distribution Grids to Charge PEVs on 3-ph 0.4-kV Distribution Grids Considering Time and Location Uncertainties Sven Bohn, Daniel Beyer, Robert Feustel, Michael Agsten Fraunhofer IOSB-AST Power Systems Research Group Am Vogelherd 50 98684 Ilmenau European Union / Germany Company Logo Here

Fraunhofer IOSB Director Prof. Dr.-Ing. habil. Jürgen Beyerer Lemgo Director Prof. Dr.-Ing. habil. Jürgen Beyerer Operational costs in 2014 41 Mio € Permanent employees 442 of which scientists and engineers 327 Graduate assistants 175 Ilmenau The IOSB is connected to Karlsruhe Institute of Technology KIT Department of Computer Sciences, Institute for Anthropomatics, Vision and Fusion Laboratory Beijing Paper # 2015-01-0305

Fraunhofer IOSB Advanced Systems Technology Branch Director Prof. Dr.-Ing. habil. Thomas Rauschenbach Deputies Dr.-Ing. Peter Bretschneider Prof. Dr.-Ing. habil. Jürgen Wernstedt Focus Energy, water and mobile systems related consulting of enterprises, governmental and non-governmental organizations Science transfer, applied research and development projects International activities, networking and scientific cooperation What’s behind systems technology – an example – a view on the German power system? Multi-Modal Energy Systems Electricity Grid Capacity and Quality Private and Industrial Demand and Behavior Business Models and Business related Interactions Time Scale Dependent Electric System Behavior Fluctuating Generation and Demand Liberalized Energy Markets and Legal Frameworks Paper # 2015-01-0305

Introduction Overview Project Managed Charging 3.0 Project Objectives Objective TSO: Negative Secondary Control Power Objective DSO: Integration of one-phase charging electric vehicles into the tri-phase system (EU) Architecture TSO Smart Charging Control System DSO 4 1 2 3 1 Negative Secondary Control Power Request (TSO) Distribution Grid Capacity (DSO) Up to 7,2 kVA additional load 4 Smart Charging Control Systems contains: 4.1 Aggregator 4.2 EV Pool 4.3 Intelligent EVSE EV 2 3 Paper # 2015-01-0305

DSO Typical Grid Layouts in EU / Germany 0.4-kV 3ph Urban Distribution Grid 270m 250m 0.4-kV 3ph Rural Distribution Grid 400m 700m Legend Voltage Loading Transformers Loading Cables/Lines KPI Urban Grid Rural Grid # Households 176 10 Peak Demand [single household] 2.52 KW cosphi=0.95 7.5 kW cosphi=0.95 Transformator Loading 436 kVA / ~70% 172 kVA / ~70% Topology Meshed Radial Balanced Condition V2/V1 0% Longest distance between transformer and load ~460m ~800m Paper # 2015-01-0305

DSO Possible Charging Technologies Grid unfriendly Worst case Grid friendly L1 L2 L3 Alternating chosen phase Optimal solutions for network disturbances when 1- and 2-Phase loading are available Must be ensured by the electrical installation and/or by infrastructure functions (e.g. coordination of charging planes) Worst case All PEV‘s are loading @ the same phase Follows conventional regulations 2-Phase 16A 8A 5.33A AC/DC 5.33A AC Best Case PEV represents a symmetric load Each phase will be loaded with 1/3 of the total load 1-Phase 3-Phase N Loading Type TR: 20/ 0.4 kV Paper # 2015-01-0305

DSO Typical Charging Use Cases and Solutions UC 1: Charging of dispersed fleets UC 2: Charging of aggregated fleets UC 1 Solution: Active Management PLM UC 2 Solution: Active Management LLM Paper # 2015-01-0305

DSO Open Question: “What is the real grid capacity for EVs?” Definition of Electric Grid Capacity Grid Capacity Limiting KPIs [Time scales] Steady state Transients and Dynamics Subtransients µs..ms s...min min…h Slow voltage changes Flicker/Voltage Dips Voltage level Thermal rating L/C/T under n. cond. Thermal rating lines/cables/transformers under failure conditions Protection Fast voltage control Changes of generation Harmonics Changes of demand KPI Value Max. voltage level +10% [EN50160] Min. voltage level -10% [EN50160] Max. unbalance V2/V1 [neg. seq./pos. seq] <=2% [EN50160] Thermal rating transformers typical between 60% … 100% Thermal rating cables Power quality ref. EN50160 Paper # 2015-01-0305

DSO Open Question: “What are the uncertainties in EV grid integration” Which car a customer buys in near or far future? Examples from the market: Car Charging time Charging Technology Tesla Models 1 up to 8h 11 up to 22 kVA, tri-phase AC Renault Zoe between 1 and 2h BMWi3 up to 4h 3,6 up to 7,2 kVA, one-phase AC Where are the charging spots located over time in near or far future? Which spots are used simultaneously? Influenced only by the customers! On which one of the three phases are charging one-phase AC EVs? Can be influenced by the customers, installer (and the DSO)! L2N Dispersed Concentrated L1N L2N L3N Paper # 2015-01-0305

DSO Challenge Customer behavior Application to the grid Possible Scenarios 1..176 EVs charge simultaneously 1ph 9.17E105 1..176 EVs charge simultaneously 3ph 9.57E52 It is impossible for a grid planner to calculate enough representative scenarios to determine the grid capacity for EVs, and the right decisions Paper # 2015-01-0305

DSO Solution MC based risk analysis MC based grid capacity estimator N0% N100% no actions required actions depending on the DSOs risk strategy DSO must act Paper # 2015-01-0305

DSO Example Analysis Scenario Description 0.4-kV 3ph Urban Distribution Grid 0.4-kV 3ph Rural Distribution Grid Criteria Value Analyse Area Whole grid Loading Peak Max. PEVs per Node 2 Charging Technology 4,6 kVA1ph cosphi=0,95 Max. Cable Loading 80% Max. Transformer Loading 100% Max. voltage deviatation ±10% Max. unbalance 2% KPI Urban Grid Rural Grid # EV N0% 3 # EV N30% 6 # EV N100% 10 1 # Cable Loading failed in 698 / 1000 simulated scenarios failed in 219 / 1000 simulated scenarios # Transformer Loading failed in 370 / 1000 simulated scenarios failed in 113 / 1000 simulated scenarios # max. voltage deviatation failed in 343 / 1000 simulated scenarios failed in 999 / 1000 simulated scenarios # Unbalance failed in 12 / 1000 simulated scenarios failed in 114 / 1000 simulated scenarios Paper # 2015-01-0305

DSO Conclusion EVs in the EU charge at a AC tri-phase system EVs are in the EU available as AC tri-phase or one-phase loads EVs are a volatile load over space, grid phases and time Planning the grid of tomorrow with EVs becomes very complex The number of possible development paths in a single distribution grid is extremely high It is impossible for a grid planner to calculate enough representative scenarios to determine the grid capacity for EVs, and the right decisions With a MC based approach a small sample of all possible scenarios can be chosen to estimate the grid capacity for EVs Benefits for DSOs Estimate the capacity for every single Low Voltage Distribution Grid (e.g. only in Germany round about 500000  Big Data Problem) Classify critical and uncritical distribution grids Actually the best available input for DSOs strategy An available evaluator of the grid capacity for EVs (…and naturally PV, CHP, Storages, Voltage Controlled Transformers, etc.) Paper # 2015-01-0305

Acknowledgments The work done by S. Bohn and M. Agsten is partly funded by the German Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) under the program “Erneuerbar Mobil”, grand no. 16EM1074. Paper # 2015-01-0305

Contact Information Thank you for your attention Dr.-Ing. Michael Agsten Head of the Power Systems Research Group Energy Department Fraunhofer Advanced Systems Technology Branch (IOSB-AST) Am Vogelherd 50 98693 Ilmenau European Union / Germany Phone +49 (0)3677 461 1520 Mail michael.agsten@iosb-ast.fraunhofer.de Paper # 2015-01-0305