IEEE Presentation Submission Template (Rev. 9) Document Number:

Slides:



Advertisements
Similar presentations
M2M Study Report: Status Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0008 Date Submitted:
Advertisements

Synchronization Drafting Group Schedule Document Number: IEEE C802.16m-09/0379 Date Submitted: Source: Paul Cheng
DC RG Report Document Number: IEEE C802.16n-11/0088 Date Submitted: Source: Ming-Tuo Zhou, Sungcheol Chang DC RG.
Project Planning Committee Opening Report (Session #77) IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE Gdoc.
Session # Maintenance Task Group Opening and Agenda IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-09/0006.
Project Planning Committee (PPC): Session #70 WG Opening Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
Project Planning Committee (PPC): Next revision project
Session # Maintenance Task Group Opening and Agenda
MM RG Report Document Number: IEEE C802.16n-11/0083 Date Submitted:
ITU-R Liaison Group Report - Session #75 Opening Plenary
Session # NRR Committee Closing Report
Session # Maintenance Task Group Opening Slides
ITU-R Liaison Group Report - Session #73 Opening Plenary
Opening report of Connection Management and QoS DG
Project Planning Committee (PPC): Report
HO DG Meeting Minutes Document Number: IEEE S802.16m-09/0752
Project Planning Committee Opening Report
UL Control Ad-hoc group discussion summary
Session # Maintenance Task Group Closing Plenary Report
Project Planning Committee Opening Report (Session #77)
Title: LE TG Closing Report for Session #61
Title: LE TG Report for the opening plenary – Session #57
Title: LE TG Report for the opening plenary – Session #59
Title: LE TG Agenda for Session #54
Title: LE TG Agenda for Session #53
Title: LE TG Agenda for Session #65
Title: LE TG Report for the opening plenary – Session #58
Title: LE TG Closing Report for Session #56
Title: LE TG Agenda for Session #63.5
Title: LE TG Closing Report for Session #56
Session # n GRIDMAN TG Closing Report
Session # n GRIDMAN TG Closing Report
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Closing Plenary Report
Resource Shifting in Persistent Scheduling
Session # Maintenance Task Group Closing Report
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening and Agenda
HARQ Ad-Hoc Report IEEE Presentation Submission Template (Rev. 9)
Overview and definitions adhoc report
Broadcast Handovers Tutorial Overview
Title: LE TG Agenda for Session #66
Title: LE TG Agenda for Session #62
Session # Maintenance Task Group Closing Plenary Report
ITU-R Liaison Group Report - Session #52 Closing Plenary
IETF 16ng Working Group Update
Session # Maintenance Task Group Opening and Agenda
Session # n GRIDMAN TG Closing Report
Session # GRIDMAN SG Opening Report
Maximum number of hops for centralized scheduling mode
Title: LE TG Agenda for Session #60
ITU-R Liaison Group Report - Session #52 Opening Plenary
Title: LE TG Agenda for Session #52
Project Planning Adhoc: WG Opening Plenary Report
Title: LE TG Closing Report for Session #61
Title: LE TG Agenda for Session #64
Network Synchronization Considerations for n
ITU-R Liaison Group Report - Session #61 Opening Plenary
Title: LE TG Agenda for Session #59
Session # NRR Ad Hoc Committee Opening Report
HARQ and ARQ Interactions
Session # NRR Committee Closing Report
Session # Maintenance Task Group Closing Plenary Report
Treasurer’s Report Document Number: IEEE /0059
Session # NRR Ad Hoc Committee Report
Presentation transcript:

802.16 Project Planning Committee (PPC): M2M Study Report & PAR Development Plan IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE 802.16ppc-10/0001 Date Submitted: 2010-04-02 Source: Jose Puthenkulam E-mail: jose.p.puthenkulam@intel.com Intel Corporation (Project Planning Committee Chair) Venue: NA Base Contribution: IEEE 802.16-10/0027r2 802.16 Project Planning Committee Session #66 Closing Report Purpose: 802.16 Project Planning Committee Machine to Machine (M2M) Communication Study Report & PAR Development Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: <http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>. Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.

PPC M2M Study Report & PAR Development Plan Goal: Finalize M2M Study Report and PAR by May Call for Initial Contributions issued for Study Report and PAR on March 24, 2010 for submission by April 5th AOE based on Initial Draft ToC (802.16-10/0024). Conference Calls Planned for Development: CC#1: April 6: 8:30-10:30PM PST CC#2: April 13: 1:30-3:30PM PST CC#3: April 20: 7:00-9:00AM PST CC#3: April 27: 8:30-10:30PM PST Agenda Schedule for Conference Call discussions: CC#1: Overall Plan, ToC Updates & Usage Models CC#2: Architecture & Requirements & Usage Model Completion CC#3: Requirements & Standard Impact & Architecture Completion CC#4: Requirements & Standard Impact Completion, Study Report Final Draft & PAR Form Updated Draft Final Study Report and PAR expected to be completed by May Session