ELCITA UPDATE August 2016.

Slides:



Advertisements
Similar presentations
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Advertisements

Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
ICPI Update SEPT Meeting May Segmental Pavement Sales Pavers, Permeable Pavers, Paving Slabs Millions of Square Meters.
6 th Street Water Main And Street Reconstruction 2013.
Surface Water Drainage Latest policy and practice in respect of surface water drainage and delivery of competitive solutions August 2013 Claire Cornmell.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
US 93 Improvements – Buchanan Boulevard to the Hoover Dam Interchange Transportation Category, Projects $10 Million to $20 Million 2012 APWA Project of.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Lakes Creek Road Waste Transfer Station Construction highlights.
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
A COMMUNITY IN THE CITY OF DORAL MAINTAINING QUALITY OF LIFE FOR ITS RESIDENTS AND CONSIDERED ONE OF THE BEST COMMUNITIES IN THE CITY DORAL LANDINGS.
21 st Sep Election Process July & August
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
October E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published.
Greetings from Spa Eco City & the creators of Frangipani Country Estates!! Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 1.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
February Skywalk Contract Awarded to M/s mayaPRAXIS to provide Architectural & Structural feasibility report of Skywalk system for Electronics.
November E – Toilets 8 e-toilets operational and 4 more e- toilets work in progress. Under Ground Drainage System Completed & Tender Published.
Edexcel BTEC Level 2 Diploma in Construction Sustainability Issues Unit 3 Sustainability in the Construction Industry.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Flats in Hinjewadi. INTRODUCTION Today Real Estate Market is the best in World. Real Estate in which flats investment is the best than plots. In that.
June Skywalk M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE April 2017.
ELCITA UPDATE February 2017.
ELCITA UPDATE March 2017.
ELCITA UPDATE JULY 2017.
ELCITA Update December 2015.
ELCITA UPDATE January 2017.
Highveld Industrial Park Office Block – ‘’F’’ Information Memorandum
ELCITA UPDATE AUGUST 2017.
ELCITA UPDATE November 2016.
San Luis Potosi – New plant April 24th 2015
Highveld Industrial Park Workshop No. 21 Information Memorandum
ELCITA Update May 2016.
ELCITA Update April 2016.
Planning Commission November 4, 2010
Highveld Industrial Park Office Block – ‘’B’’ Information Memorandum
SKYWARDS TECH PARK.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE SEPTEMBER 2017.
ELCITA UPDATE October 2016.
Construction Report March 25, 2010.
uacn property development company plc
ELCITA UPDATE November 2017.
Electronics City Industrial Township Authority
MONTHLY STATUS REPORT– May 2013
ELCITA Update March 2016.
ELCITA UPDATE March 2018.
ELCITA UPDATE April 2018.
We would like to list below an update on the Progress of the Project.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE July 2016.
ELCITA UPDATE December 2016.
PRESENTS RAKSHA GREENS.
ELCITA Update January 2016.
ELCITA UPDATE September 2016.
1200 West Widening and Reconstruction Project
URBAN TRAIL PROJECT UPDATES
CRA Grant Programs Overview.
City Hall Departments 2020 Budget.
Commission Agenda Item #12
ELCITA UPDATE June 2019.
ELCITA UPDATE August 2019.
ELCITA UPDATE July 2019.
ELCITA UPDATE April
Godrej Lahari | Electronic City | New Launch | Price | Reviews.
Presentation transcript:

ELCITA UPDATE August 2016

Estate Management Skywalk E – Toilets 16 e-toilets operational. M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E – Toilets 16 e-toilets operational. Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 100 % completed. GIS Web Application Software Installed in ELCITA server. Testing work in progress.

Siemens to Infosys Gate-3 Road Road Works – Completed Siemens to Infosys Gate-3 Road Velankani Road

Road Works – Under Progress BHEL to Wipro Gate 5 - Completed Concrete Pavements along Doddanagamangala Village Road

Drain Works – Under Progress  Drain Work From Wipro Gate 5 to Wipro Gate 16  Drain Work in front of CDac 

Drain/Footpath Works – Under Progress Removing the existing pavers & laying the new Pavers at Salarpuria Info Zone  Police Station Drain

Drain Works – Completed  Drain Work along ITI property Drain Work in front of Venkatadri 

Misc Works – Under Progress  Road Widening at Pump House Road Barbed Wire Fencing at Pump House

Misc Works – Completed Construction of Shoulder Drain along Café Corner Road Kerbstone Painting at Siemens Road

Misc Works – Completed MS Railing work below Fly over for E-Toilet MS Railing work – Median Ecity Phase 2

Sustainability Projects RWH works – Under Progress SI.NO DESCRIPTION NO OF PITS STATUS 1 RAIN WATER HATVESTING PIT 43 COMPLETED 2 WORK IN PROGRESS

20 feet deep well Rainwater Harvesting Pit at Various locations

Estate Management Contract Awarded Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road MSME Entry Gate to Exit Gate for 300KLD STP Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along TCS Road

Estate Management Contracts on Anvil Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road Petrol Bunk Road & Golden Tulip Road Providing and laying of Asphalting using 60/70 grade bitumen along KSSIDC Complex Road Landscaping work below fly over (Phase 1 & 2) Providing UGD to connect industries in cluster 2 & 3 to the 300 KLD STP. Construction of 500 KLD STP in KIADB Land, Electronics City Phase 2

Thank You