Chris Shaw, EUROCONTROL Experimental Centre

Slides:



Advertisements
Similar presentations
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
Advertisements

ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
CARE ASAS Validation Framework. Partners CARE ASAS Board - Francis Casaux EURCONTROL - Mick van Gool, Ulrich Borkenhagen Consortium Partners Aena, Isdefe,
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
Airborne Separation Assistance System Thematic Network An Overview Bill Booth, EUROCONTROL.
Operational applications enabled by ADS-B
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
SESAR and ASAS Opportunity
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
4 th Workshop, Amsterdam, April 2007 ASAS-TN2 Fourth Workshop Sponsored by European Commission DG:RES “ASAS, a Reality Check”
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
Airbus Status on ADS-B In / Out Update
ASAS Thematic Network 2.5 Towards an ASAS-Global Network.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
Final Seminar, Paris, April 2008 ASAS in the SESAR Master Plan Fraser McGibbon (BAE Systems) Andy Barff (EUROCONTROL EEC) ASAS-TN2 Seminar Paris.
Slide 1 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ACAS / ASAS interaction IAPA Project Thierry.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
Joint 5 th ASAS TN2 Workshop & 2 nd FLYSAFE Forum Toulouse, September 2007 Experiments on the Impact of Wind on ASPA-S&M Manoeuvres Stephen Broatch,
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
ASSTAR Overview Jean-Marc Loscos, DSNA
Workshop on preparations for ANConf/12 − ASBU methodology
CEATS Central European Air Traffic Services
Workshop on preparations for ANConf/12 − ASBU methodology
Project conclusions and recommendations Thierry Arino (Sofréavia)
KDC ASAS 2008 project - How could ASAS benefit the NL ATM System
ASAS Thematic Network ASAS Now!.
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Rome November 2008 Johan Martensson, CASCADE
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
Karim Zeghal EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Project Overview & User Forum Objectives
Workshop on preparations for ANConf/12 − ASBU methodology
AP23 Introduction ASAS-TN2.5 workshop 13 Nov 08, Rome
Purpose and Structure of the Workshop
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
Directorate-General Energy and Transport
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

Chris Shaw, EUROCONTROL Experimental Centre Airborne Separation Assistance System (ASAS) Thematic Network 2: ASAS applications maturity assessment Chris Shaw, EUROCONTROL Experimental Centre

Contents of presentation Introduction Objectives ADS-B Method Applications Maturity metrics Results Conclusion Maturity assessment

Introduction ASAS Thematic Network 2 Sponsored by European Commission Directorate General Research 6th Framework Three year project from April 2005 Aim: to accelerate the application of ASAS operations in European Airspace taking into account global applicability in order to increase airspace capacity and safety. Managed by consortium: BAE Systems, ENAV, LFV, NLR, Thales Air Systems & Thales Avionics, EUROCONTROL (leader)

5 ASAS workshops & final seminar Objectives 5 ASAS workshops & final seminar Malmo (Oct 2005), Rome (Apr 2006) Glasgow (Sep 2006), Amsterdam (Apr 2007), Toulouse (Sep 2007) Web-based ASAS related documentation Annual assessment of the maturity of global ADS-B/ASAS applications by ASAS-TN2 partners Deliverables: Report ”ASAS application maturity assessment” V1 March 2006, update V2 March 2007 & V3 March 2008

ADS-B - coverage Automatic Dependent Surveillance – Broadcast (ADS-B) Mode S Extended Squitter in Europe: In Jan 2008, 97% of flights Mode S equipped (95% in Oct 2006) of which 78% ADS-B Extended Squitter capability (57% in Oct 2006).

12 ASAS specialists from: Method (1/3) 19 ASAS applications: ADS-B surveillance Airborne traffic situational awareness Airborne spacing Airborne separation Airborne self-separation 12 ASAS specialists from: BAE systems (UK), ENAV (Italy), LFV (Sweden), NLR (The Netherlands), Thales ATM (France), Thales Air Systems (France) and EUROCONTROL

Method (2/3) Maturity metrics scale 0 to 4 (±0.5): Operational concepts Benefits and constraints Safety assessment Procedures and human factors Systems, HMI and technology Transition issues Results reviewed by selected peers from US, Europe and Australia

Method (3/3) Example metric: Operational concept 1 = Problem statement, identify solutions, concept generation (concept of operations) 2 = Preliminary Operational Concept Description (R&D Operational Service and Environment Description (OSED)) 3 = Draft Requirements Focus Group (RFG) OSED in development (e.g. from R&D OSEDs, trials and experiments, initial OSED) – mature and in review. 4 = Consolidated OSED - Published

Results (1/4) - overview ADS-B ATSA ASPA ASEP SSEP ASAS applications

Results (2/4) – highest/lowest Highest maturity score ATC surveillance in non-radar areas Lowest maturity score Vertical crossing and passing (Airborne separation)

Results (3/4) – fastest/newest Largest increase in maturity score Sequencing and merging (Airborne spacing) New application In-trail merge (Airborne separation)

Results (4/4) – maturity rates Maturity acceleration ADS-B ATSA ASPA ASEP SSEP “ASAS-TN2 aim: to accelerate the application of ASAS operations…”

Conclusion Of 19 applications assessed, 9 have maturity scores of at least 12 (out of 24) Maturity has ‘accelerated’ from 10% increase in total scores (2006-7) to 13% (2007-8) Maturity cases: Highest: ADS-B-NRA (operational Australia) Lowest: ASEP-VC&P (score 6/24) Fastest: ASPA-S&M (UPS M&S operational approval) Versions 1, 2 & 3 of report on ASAS-TN2 website (http://www.asas-tn.org/reports)