VFAT hybrid and beam board noise studies

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
[ 1 ] LVDS links Servizio Elettronico Laboratori Frascati INFN - Laboratori Nazionali di Frascati G. Felici LVDS links.
Equivalent Circuits - Resistors Resistor noise is dominated by thermal noise: Noiseless Resistor Noisy Resistor Noise Source.
Tera-Pixel APS for CALICE Progress meeting, 17 th September 2007 Jamie Crooks, Microelectronics/RAL.
NA62 front end Layout in DM option Jan Kaplon/Pierre Jarron.
Principles of Physics.  More than one resistor in multiple paths  Electrons may go through any path  More electrons will go through path with less.
Chain of Modules using 1cm wide Cu Tape between hybrids SP- SP+ M0 M1 M2 M3 Initial test used External shunt control (subsequently reverted) Photo shows.
Lecture 6: Measurements of Inductance, Capacitance, Phase, and Frequency 1.
EMC review for Belle II (Grounding & shielding plans) Sub-systems ( XXXXX)
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Todd Moore for the DES CollaborationApril 20 th, Quick Summary of Noise Test Results. Noise test software & hardware setup. Earth grounding/shielding.
10.1 Chapter 10 –Theory of Production and Cost in the Long Run(LR)  The theory of production in the LR provides the theoretical basis for firm decision-making.
CONTROL SOFTWARE On December 11th 2006 By Juha Petäjäjärvi On December 11th 2006 By Juha Petäjäjärvi.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
IPC Power Distribution Considerations A predominately important factor that should be considered in the design of a printed board is power distribution.
TTP Related SW December 4th 2007 Juha Petäjäjärvi December 4th 2007 Juha Petäjäjärvi Totem Test Platform.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
Common ATLAS/CMS Electronics Workshop March, 2007 W. Dabrowski Atlas ABCNext/SiGe W. Dabrowski Faculty of Physics and Applied Computer Science AGH.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
HF-Protection of Electronic Circuits Thomas Losert.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
Lecture 6: Measurements of Inductance, Capacitance, Phase, and Frequency 1.
Getting faster bandwidth HervéGrabas Getting faster bandwidth - Hervé Grabas1.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
Ch. 3 – Search Supplemental slides for CSE 327 Prof. Jeff Heflin.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Convergence in Proton Reconstruction Algorithm and final reference tests of Roman pots before installation in LHC Ayah Massoud Penn State University Supervisor:
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Grounding ADCs & DACs Data Converters (ADCs and DACs) are accurate and sensitive analog devices whose analog ports are vulnerable to unwanted noise (most.
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
HV Connections for SP HV RETURN Dummy Pad Backplane Connection Do we need to connect the HV and HV return to the “left hand” hybrid? The HV trace serves.
TIMEPIX2 FE STUDIES X. Llopart. Summary of work done During summer I have been looking at a possible front end for Timepix2 The baseline schematic is.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
RF Pick-Up Measurements in the 2004 SPS Testbeam Before installation of silicon detector assemblies in the Roman Pot: Antenna insertions for measurement.
1 End-cap Module Electrical Specs. And Performance C. Lacasta + J. Pater, R. Bates, J. Bernabeu, P. Dervan, A. Greenall, C. Ketterer, J.E. Garcia, G. Moorhead,
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Developing a Sonar Sub-System for a Submarine to Obtain Time Delays between Received Signals Gary Eades Dy Eang Diana Fuertes 12/04/2007 ECE4884 L03 Dr.
THE USER “POINT OF VIEW” ABOUT THE VFAT2 The first day.... The first week.... The first month.... The first year... But at the end you will be a friend.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
Power Distribution Copyright F. Canavero, R. Fantino Licensed to HDT - High Design Technology.
ZTF Grounding or Yes, there are two paths you can go by
Testbeam Planning Common to all testbeams:
Setup for automated measurements (parametrization) of ASD2 chip
TT Upgrade Power Review
Noise Analysis of CMOS Readouot Ciruits
The Totem trigger architecture The LONEG firmware archtecture
TOTEM Collaboration Meeting June 2007
High-Speed Serial Link Layout Recommendations –
A few ideas about detector grounding and shielding D. Breton
Meeting on Services and Power Supplies
MPGD Detectors and Electronics at CIAE
Tassielli G.F. INFN Lecce & Università del Salento
News on second coordinate readout
Introduction to series circuits
How to turn on MICE Step IV
Tracker Station QA Acceptance Test Rig Status
Radiation Detectors : Detection actually means measurement of the radiation with its energy content and other related properties. The detection system.
Overview of T1 detector T1 is composed by 2 arms
BESIII EMC electronics
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
RPC Front End Electronics
Adding subtracting polynomial
The LHCb VErtex LOcator
Option 1: Reduced FF Quad Apertures
Presentation transcript:

VFAT hybrid and beam board noise studies The measured noise of VFAT2 is very low, at the theoretical level of the design, measured in lab last year. This has been reproduced in H8 for the Roman Pots with and without the silicon detectors. The GEM set-up however has higher noise even without detector. Ground return paths and different powering options have a marked effect on this requiring study.

Roman Pot S-Curve on all channels

RP S-Curve results, VFAT2 without detector Results from S-curve plots Mean Sigma 1.12 Sigma of the sigmas 0.16 Mean of the means 35.81 Sigma of means 0.66 Referring to DAC scan plots Noise over all 128 channels ……….. <ENC> = 589 electrons rms, s = 84 electrons Threshold chosen = 5909 electrons (0.945 fC) Threshold spread over 128 channels = 1.8% (without trimming DACs) This is the measured noise in H8 which is consistent with the theoretical level and lab tests last year.

S-curve results obtained in H8 (without detector) T1/T2 hybrid tests logic DEF3 F0F2 + <s> = 1.3 <s> = 1.8 T2 Beam Board Roman Pot hybrid tests <s> = 1.12 A D A D logic + RP Beam Board BB : Common return, 2 power regulators Hybrid : joined and separate return options tested BB : Common return, 1 power regulator Hybrid : Separate returns

Tests remaining Roman Pot hybrid tests Add second RP board to see if theoretical noise level is maintained. T1/T2 hybrid tests Change Beam board to be identical with respect to powering as RP board to try to achieve the same noise figure as RP. Try to achieve this with multiple hybrids. Only when the set-up is clean and understood without detector can we consider adding the detector in a step by step way to study its effect on the noise. Noise optimisation with the detector includes : Channel capacitance Detector ground return and loops Pick-up/ shielding Power supply and ground impedance and decoupling