Design Concept Update – Platform Moved on Hillman Rollers

Slides:



Advertisements
Similar presentations
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Advertisements

01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
CONSTRUCTION.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Michelle Perticarari Rebeca Peña
COMPACTION Topic COMPACTION Presented to Dr. Ayub Elahi Presented by Group leader. M.Zeeshan haider yousaf Zia. # 14 Haider ayub # 13 Bilal ansari #35.
The ground must push up as hard as the building pushes down
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
Push Pull Considerations
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
EDMS Nr /02/ tons, Platform – Q = daN, aprox. length to cover 4 m Cabling Groove – Q = 500 daN, aprox.
Design of screw jack Y. Mohan S S Ram.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Contents Will describe design of Beam Delivery System, focusing.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Team: Wolfgang Burkert, Haimo Jöhri, Uwe Barth Mechanical precision and vibration behavior of mechanical supports Johan Wickström GFA-ATK.
Wood Construction CTC-375.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Date Event Global Design Effort 1 Platform Moved on Hillman Rollers, Deformations John W. Amann ILC – Mechanical Engineering 9/12/07 IREng07.
SiD Platform Deformation Studies John Amann ILC Mechanical Engineering 11/21/06.
Shield Module Design Considerations Adam Carroll Van Graves July 3, 2014.
The four basic types of structures are :
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
DIAPHRAGM WALLS.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
Ryan Thurston | Duncan McLennan
Roller/rail - System for PANDA
ILC MDI Platform Concept
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Present status of the flux return yoke design
ILC Interaction Region and Machine Detector Interface
Introduction Used for covering spaces in the form of roof or floor
SiD Muon Yoke Structure - Deformation Studies -
Design of Distribution Feedbox at LHC P7
CONSTRUCTION METHODS & TECHNOLOGY
John Amann ILC Mechanical Engineering 10/31/06
Radiation Physics requirements for the IR
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Arch205 building construction floor & Roof systems
CMS Gantry for Detector Lowering
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
Bunker Wall Design Wall ESS
Fixed Support Design & Testing
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

Design Concept Update – Platform Moved on Hillman Rollers John W. Amann ILC – Mechanical Engineering 9/17/07 IREng07 Date Event Global Design Effort

Sliding Platform Design Concept Concept developed in discussions with A. Herve and A. Seryi. Platform details: 20x15x2m 5m wide trenches for cable chain and roller access. Steel reinforced concrete or steel plate construction. Section View Date Event 9/17/07 IREng07 Global Design Effort

Platform/Roller Arrangement Uses 1.5kT roller module with 1kT hydraulic jacks. Design must be optimized to distribute load evenly over roller module. Feet support platform when stationary. Date Event 9/17/07 IREng07 Global Design Effort

Bridging the Gaps Gaps filled with recessed steel plates. Thick steel plate cap here for roller track. Date Event 9/17/07 IREng07 Global Design Effort

3m Shielding Wall on Rollers Shielding wall can be added between platforms if needed. Protrusions shield cable trenches. Date Event 9/17/07 IREng07 Global Design Effort

Need to Investigate…. 1) How to return platform to beam line position with mm accuracy? System of alignment male/female V-grooves on platform feet and IR runway. Platform rolled onto beam line roughly aligned. When platform is lowered, grooves mate to align platform to better tolerance than achievable with rollers. 2) How to propel platform? Screw drive, hydraulic ram, cable and reel? Hydraulic ram seems best for large movements. A 50-100m long screw drive could be difficult to engineer. 3) How to cover trench? “Accordion” style folding panels? What sort of load could these withstand? If floor panels with trusses are to be used what are the operational issues during a swap? 4) How to deal with settling of the IR floor relative to the beamline tunnel? Shims can be used to add height, but how to subtract if needed? Date Event 9/17/07 IREng07 Global Design Effort