E.Clément Novembre  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 FRS Total Eff.
E.Clément Novembre 2011 E.Clément GANIL AGATA Days February 2013 AGATA Campaign at GANIL  Setup to be integrated  Project Organization and.
AGATA Introduction John Simpson Nuclear Physics Group.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
Characterisation & PSA Team Meeting Presentations –Liverpool Status, Andy Boston/Matt Dimmock (Liverpool) –Crosstalk properties of AGATA detectors, Bart.
Brief Report on the Status of the AGATA Project (June 2012) A. Gadea (IFIC, Valencia) the AGATA PM on behalf of the AMB AGATA Collaboration Council Orsay.
AGATA Pre-processing team report AGATA Week, July 2008.
Status of the AGATA Project June 2013 on behalf of the AMB AGATA Collaboration Council meeting June 2013.
Detectors and Preamplifiers Detector deliveries Customer Acceptance Tests Available detectors AGATA triple detectors Scanning program P. Reiter IKP University.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
Analysis of S002 scan data Bart Bruyneel and Benedikt Birkenbach – IKP Cologne At the 7 th AGATA week, Uppsala July S003.
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
2010  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 FRS Total Eff. InFlight ~ 10% Total Eff.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Xenon Detector Installation schedule Satoshi MIHARA.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Detector Module Three 36-fold segmented detectors 111 preamplifiers Cryostat Jürgen Eberth University of Cologne Detector Team: Dirk Weißhaar Preampl.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
E.Clément Novembre 2011 AGATA : Organisation of the campaign and technical aspect GANIL SC- September 2013.
Marc Labiche 15 th AGATA week, 18 th -20 th Nov 2014, GANIL, Caen.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
Roberto Calabrese Ferrara University and INFN
Complementary detectors for campaign
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
T980 STATUS AND CHANGES FOR
Status of GASPARD mechanics
Francois and Lau EATM 17 July 2012
Claudia Cecchi University of Perugia and INFN
Start Detector for pion experiments
Detectors and Preamplifiers
Status of the AGATA installation at GANIL
CMS Area Working Group Meeting
working group activities overview
AGATA Campaign at GANIL Scientific Goals
The interaction region for FIRST (status report)
Mini-drawers, FE-ASIC , Integrator
IHEP group Shashlyk activity towards TDR
Target and Horn status report
CAT of AGATA detectors &
Hall A Compton Electron detector overview
Preparations for test of

Status of the CBM Experiment – Key Dates for CBM Magnet
AGATA week Uppsala, July 2008
AGATA Today at GANIL 12 Triple Cluster and 1 Double Cluster (38 detectors) on site ATC1 core B oscillating after capsule change ATC9 core B : high Voltage.
Ch. THEISEN – CEA Saclay MUSETT: the segmented Si array for the focal plane of the VAMOS spectrometer Ch. THEISEN – CEA Saclay.
New particle ID detector for Crystal Ball at MAMI-C
Testbeam status report
Advanced Implantation Detector Array (AIDA)
2015 January February March April May June July August September
Presentation transcript:

Status of the AGATA installation at GANIL

2010  2011 LNL : 5TC 2012  GSI/FRS 6TC+3 DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA @ FRS AGATA @G1 ( p) Total Eff Nominal. ~2.6% Total Eff. (b=0.5) ~ 10% Total Eff ~ 8% to 14%

3rd of last June : our D-Day in Normandy

Mechanical installation Collaboration: IPHC, STFC, CSNSM, GANIL Touchdown 26th of June

Mechanical installation Collaboration: IPHC, STFC, CSNSM, GANIL Installation completed Alignment done Grounding tests done Target area tested under vacuum  Next step is the mechanical installation of the detectors this week

Infrastructure Collaboration : Irfu, GSI, GANIL Full test completed with an EXOGAM clover 1st week of September 2 AGATA TC connected to the system

Front End Electronic and Data Acquisition 2nd of June 18th of June : Collaboration : CSNSM, STFC, LNL, IPNL, IPNO, IPHC, GANIL 2nd of June 19th of June 18:43 18th of June : lxagata0.gsi.de  lxagata0.ganil.fr

Front End Electronic and Data Acquisition 24 modified Core modules Collaboration : CSNSM, STFC, LNL, IPNL, IPNO, IPHC, GANIL 24 modified Core modules 21 Segment modules 20 carrier pairs in VHDL0 2 GTS root (AGATA-EXOGAM2) 1 GTP (1 spear in prep at LNL) 1 VME FIFO spear 330 Fibers

Watcher installation this week by IPNL AGATA GTP AGATA GTS-Root GEC® MFM2ADF Actor GANIL Narval Topology GANIL VME AGATA World GANIL World GECCO® GANIL RCC Watcher installation this week by IPNL

Front End Electronic and Data Acquisition Collaboration : CSNSM, STFC, LNL, IPNL, GANIL

Detectors 26th of September Collaboration: IKP, Uni. Liverpool, Irfu, GSI, GANIL 26th of September ATC1 and ATC5 prepared at GANIL with the help of IKP-Cologne Detectors cooled down last week. Test on-going This week : mounting into the structure with IKP-GSI-GANIL Next delivery in 2-3 weeks

Planning Mechanical installation completed end of June Installation FEE-DAQ end completed end of July AF, DSS, cabling completed end of August First cooling of detectors and installation last week  highest priority put on the integration of the detectors into the system Source Tests October—November  AGATA ready for in-beam commissioning 2012-2014 budget : 349,1 k€ from GANIL + 41 k€ from IN2P3: Total = 390 k€. (2012 estimation was 421 k€, overhead excluded). The first commissioning will be 40Ar+122Sn between the 13th-15th of October with AGATA solo. 27 November : 17 UT 8 December : 19 UT 238U beam for the commissioning of the AGATA-VAMOS coupling. The campaign starts on the 3rd of March and ends on the 22nd of July with a very high rate of experiment.

Front End Electronic and Data Acquisition FATIMA-PARIS Collaboration : CSNSM, STFC, LNL, IPNL, GANIL FATIMA-PARIS 7 experiments in March-July 2015 UT

FATIMA and PARIS at AGATA 2 experiments accepted to be scheduled late 2015 or beginning of 2016 Courtesy of B. Bruyneel The AGATA ancillary team gathers the 3 collaborations Courtesy of A. Maj Joined mechanical integration Electronic to be defined In this simulation, Agata consisted out of 5ATC + 5ADC, So in total 25 agata crystals were used in the simulation, Positioned at a radius of 23.5cm. There is no place in this setup to move the AGATA cluster 10 cm forward. Although it is possible to perform tracking, This option was not used in these simulations. Agata was here simulated as a classic detector, And only the central core energy of each crystal was used. (there is still differences of about 50% between simulated and experimental tracking performance !!! See talk D. Bazzacco, 13th AGATA week – and next slide) Fatima was implemented in 8 x clusters of 4 crystals. These detectors would fit in the exogam frame. Minimum radius would be 15.6cm, This corresponds to the length of the gray arrows in the picture. In the simulation of the fatima detector is included: -the alu tube for the pmt – (in blue. the pmt itself is not included) -a 1.5 inch x 2 inch encapsulated LaBr crystal -a 5 mm quartz window behind the crystal -the lead collimator surrounding the crystal (in yellow) It should be noted that peak to total will be worse experimentally, Due to the absence of the massive magnets in the simulation. This problem is currently under discusion in the Agata simulation working group… (see talk D.Bazzacco at 13th Agata week, and next slide) 2015-2016  accepted experiments (+ FATIMA/PARIS) Both NEDA and the Vamos gas-filled mode can be ready in 2017 2017  NEDA data taking (?) 2018  Vamos –gas-filled (?) Next PAC beginning of 2015

2009-2011 2012-2014 2014--