1. Check reaction 2. Check water 3. Check heater 4. Check gas

Slides:



Advertisements
Similar presentations
Vacuum Filtration.
Advertisements

Hand washing Activity WashersRinsersWalkers Directions for Data Collection for Hand washing Activity 1. Spend 10 minutes in a public rest room 2. Observe.
Safe Use and Operation of Vacuum Lines
HAND SANITIZING PROGRAM ELEMENTARY SCHOOLS. HAND SANITIZING PROGRAM ELEMENTARY SCHOOLS Purpose: 1. Identify how germs enter the body 2.Demonstrate proper.
 Step one is to get a paper towel and set it by the sink.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
Sessler Group Safety Talk Safe Operation of Vacuum System for Avoiding Danger of Liquid Oxygen Ren-Tsung Wu October 23 rd,
6200 Calorimeter Operation Colby College Version Parr Instrument Company.
2G BBULBE PASS Instructions-4 Replacement of bubble generator.
DISTILLATION Imelyn will show you how to set up for distillation. Scroll down.
DONNING & REMOVING Personal Protective Equipment (PPE) for SARS
The DB In-Line Pumpout Unit Easy-to-use control panel with one switch to run the unit. 15 AMP reset fuse. 115 AC External water pump and tank drain have.
Micro Practical 3 PRINCIPLE AND WORKING OF AUTOCLAVE Dr. Shahzad Ali Assistant Professor Department of Wildlife and Ecology UVAS, Ravi Campus, Pattoki.
Accessories Planned Maintenance. Types l Humidifiers l Air Cleaners l Heat Recovery Ventilators l Condensate Pumps.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
High Pressure Lifting Bags
Inside the Boiler! Boiler Tubes Detail of bottom of boiler tubes.
Diffusion Experiment.
CRC Basic Food Handling CANADIAN ROCKIES CAFÉ. CRC Overview  Hand Washing  Knife Safety  Cleaning and Sanitizing Canadian Rockies - Joe Student.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
Eco-Winter Installation. – Step 1 – Mount Eco-bypass to water heater.
Setting up a Saltwater Aquarium Water weighs 10 pounds per gallon Place tank on a level surface that can support the weight Do not use soap to clean tank.
2G BBULBE PASS Instructions-5 Replacement of Heater.
TAP LINE CLEANING MDP. Safety and Safety Gear  Do not use hot water to clean your beer lines. This will cause the lines to misshape and break, and could.
Diesel Fuel - Fill Place all spill safety equipment where needed
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
Dishwashing Procedures
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
Oil Bath Safety. Oil Bath Use Safety first  Always wear protective eye-wear and gloves.  Do not set the oil-bath temperature.
Biochemistry lab. MEDI 2130 INTRODUCTION.
SMaRT: Soft Matter Research & Technology Group Safety: Vacuum Oven Solvent Trap 2/11/
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
WASHING MACHINE Prepared by: DHAVAL MODI PANKAJ SAINANI
Unit 1 Mix and Flow of Matter Topic 3 Separating Earth’s Mixtures Remember to name and date your notes!
Lab Safety Procedures & Use of Safety Equipment
ACTIVE SOLAR DESIGN ALTERNATIVE ENEGRY SOURCES.
delivered with the compressor
TROUBLESHOOTING GUIDE FOR GAS HOT WATER HEATER
Fill Add 80 gallons Treat Greywater Rinse Treat Intermediate Treatment
CHIGO VRF System Commissioning.
1.01 Y FOOD SAFETY VS. FOOD SANITATION
Friday – port side engine room weekly checks
Lab Safety.
Biochemistry lab. INTRODUCTION.
How To Light a Bunsen Burner
Bilge Pump Service Project Model Service Kit
STOP THINK GO!.
Schlenk Line Techniques
Physical chemistry experiment
Road signs Speed limit No right turn Slippery road No entry
Electrical Gas Plumbing Heating & Cooling
Label Color Code (ChemAlert Fischer)
Lab Safety.
Physical and Chemical Changes
Ice Boiling Stem Activity for Students/Teachers.
LIGHTING OVEN Steps to Follow.
Lab Safety.
Scientific Lab Equipment
A. General Safety Rules 1. Listen to or read instructions carefully before attempting to do anything. 2. Wear safety goggles to protect your eyes from.
Acid/Base Titration Purpose- to find the concentration of four HCl samples, by titrating them with 0.100M NaOH Solution(titrant).
AVIATION 325 PITOT - STATIC SYSTEM VACCUM SYSTEM
ALWAYS dispose of gloves in approved containers.
Hand Washing by Nurse Laura Adapted from:
Safety Moment Vacuum Trap Safety.
A. General Safety Rules 1. Listen to or read instructions carefully before attempting to do anything. 2. Wear safety goggles to protect your eyes from.
Chemical Changes.
Physical Science Final Review #4
Microbiology 345: Using an Ultraspec UV-vis recording spectrometer
Biochemistry lab. INTRODUCTION.
Presentation transcript:

1. Check reaction 2. Check water 3. Check heater 4. Check gas Assignment 3 Zhiyong Yang CS10051 Summer, 2006 Instructor: Dean Zeller Check reaction 1. Check stirring 2. Check color 3. Check odor 4. Check meter 5. Check flask 6. END Check meter 1. Check system 2. Check protect gas 3. Check branch gas 4. Check temperature 5. Check vacuum gauge 6. END Check safety 1. Check reaction 2. Check water 3. Check heater 4. Check gas 5. Check solvent 6. END Check water 1. Check tap water 2. Check condensing water 3. Check distilled water 4. Check running water 5. Check valves 6. END Check running water 1. Check intake pump 2. Check pipes 3. Check connections 4. Check outlet 5. Check rate 6. END Ready go home 1. Check safety 2. Wash hands 3. Sign notes 4. Turn off lights 5. Lock door 6. END Wash hands 1. Remove gloves 2. Throw gloves 3. Rinse hands 4. Apply soap 5. Rinse 6. Wipe dry 7. END

Instructor: Dean Zeller Assignment 4 Zhiyong Yang CS10051 Summer, 2006 Instructor: Dean Zeller

Program 1: Counting (Start, End) Steps for counting with start and end Set I to start While I < = end Do output I set I to I + 1 Endwhile While I >= end Do set I to I – 1 Stop Execution history Input: start = 21, end = 25 1. Steps for counting with start and end 2. Set I to start 3. While I <= end Do 4. output I 5. set I to I + 1 6. Endwhile 7. While I <= end Do 8. output I 9. set I to I + 1 10.Endwhile 11.While I <= end Do 12. output I 13. set I to I + 1 14.Endif 15.While I <= end Do 16. output I 17. set I to I + 1 18.Endwhile 19.While I <= end Do 20. output I 21. set I to I + 1 22.Endwhile 23.While I <= end Do 24.stop output 21 22 23 24 25 26 Analysis Total iteration number N = 5 N = (END – START) + 1 Total executive lines: 23 4N + 3

Program 2: Meet in the middle (Bottom, Top) Steps for meet with bottom and top If bottom > top then set temp to bottom set bottom to top set top to temp Endif While bottom < top Output bottom Output top Set bottom to bottom + 1 Set top to top – 1 Endwhile Stop Execution history output Input: bottom = 3, top = 7 1. Steps for meet with bottom and top 2. If bottom > top then 3. endif 4. While bottom < top 5. Output bottom 3 6. Output top 7 7. Set bottom to bottom + 1 4 8. Set top to top – 1 6 9. endwhile 10. If bottom > top then 11. endif 12. While bottom < top 13. Output bottom 4 14. Output top 6 15. Set bottom to bottom +1 5 16. Set top to top -1 5 17. endwhile 18. If bottom > top 19. Endif 20. While bottom < top 21. Endwhile 22. stop Analysis Total iteration number N = 2 N = (bottom - top)/2 Total executive lines: 22 8N + 6

Program 2: Meet in the middle (Bottom, Top) Steps for meet with bottom and top If bottom > top then set temp to bottom set bottom to top set top to temp Endif While bottom < top Output bottom Output top Set bottom to bottom + 1 Set top to top – 1 Endwhile Stop Execution history output Input: bottom = 25, top = 21 1. Steps for meet with bottom and top 2. If bottom > top then 3. Set temp to bottom 25 4. set bottom to top 21 5. Set top to temp 25 6. endif 7. While bottom < top 8. Output bottom 21 9. Output top 25 10. Set bottom to bottom + 1 22 11. Set top to top -1 24 12. endwhile 13. If bottom > top 14. endif 15. While bottom < top 16. Output bottom 22 17. Output top 24 18. Set bottom to bottom + 1 23 19. Set top to top -1 23 20. endwhile 21. If bottom > top 22. Endif 23. While bottom < top 24. Endwhile 25. stop Analysis Total iteration number N = 2 N = (bottom - top)/2 Total executive lines: 25 8N + 9

Program 4: Sort 3 (A, B, C) Steps for sort of A, B and C If A > B then set temp to B set B to A set A to temp Endif If B > C then Set temp to C Set C to B Set B to temp Output A Output B Output C Stop Execution history output Input: A = 23 B = 18 C = 9 A B C temp 23 18 9 1. Steps for sort of A,B and C 2. If A > B then 3. Set temp to B 18 4. Set B to A 23 5. Set A to temp 18 6. Endif 7. If B > C then Set temp to C 9 Set C to B 23 Set B to temp 9 11.Endif 12.If A > B then Set temp to B 9 Set B to A 18 Set A to temp 9 16.Endif 17.Output A 9 18.Output B 18 19.Output C 23 20.Stop Analysis Total iteration number N = 3 Total executive lines: 20 5N + 5