Prepared by Frank Cooney B.Arch MRIA

Slides:



Advertisements
Similar presentations
Dr. Ruth Collins TrinityHaus
Advertisements

Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
John Bedford RETROFIT. Why Retrofit? The UKs 26 million homes are responsible for 14% of its greenhouse gas emissions. The Government target is to cut.
Presented by Tim Baldwin. Established by the Energy Act 2011 Loan scheme attached to energy bill. Governed by the consumer credit act Supervised by Independent.
East Bridgford Project Existing Projects The Green Box Project Adaptation Techniques used within this project:- Natural ventilation is increased by a passive.
THE GREEN DEAL Alan Lupton. THE STORY SO FAR 1996 Introduction of the Home Energy Conservation Act (HECA) – local authorities to report annually on the.
A passive investment towards improved control over energy costs.
Welcome to Energy efficiency for gas-fired and oil-fired domestic heating and hot water systems Session A: Course introduction.
Timber Framed Structures
Q5- U-Value 2010 HL 5. (a) Calculate the U-value of an uninsulated external solid concrete wall of a dwelling house built in the 1950s given the following.
Building Energy Rating
Investment and Standards in Local Authority Housing Stock Seán Armstrong, Advisor, Architecture/Building Standards Section, Department of Environment,
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
New Models for Interstitial Condensation
Moray Street, Macduff: Insulation and Renovation Project SUMMARY The Moray Street Project involves local authority homes which have an extensive history.
1 Thermography of Buildings Stacey Ward - BSRIA Instrument Solutions - - Sales Manager -
Improving Energy Efficiency in Traditional Buildings Moses Jenkins Technical Conservation Group.
Energy, Environment and Buildings B FLOATING STUDENT RESIDENCE Evelyne Hornblower Yan Claprood April 2005.
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Gary C Akers Technical Manager. * No wall clutter. * Reduced risk of clashes. * Aesthetically pleasing. * Site benefits. * Environmental benefits. * Cooling.
© PDST Home Economics Heating and Insulation. Methods of Heating Central heating: heat created by burning fuel (solid, oil, gas) in a boiler in a central.
Evidence on Tackling Hard to Treat Properties Prof. Sue Roaf, Heriot-Watt University Dr. Keith Baker, SISTech Ltd Andrew Peacock, Heriot-Watt University.
Designing an Eco-House Task In this task you will find out about eco houses and consider the features that you would like to see included in a family house.
Building your Energy Efficient New Home. Learning Objectives: The features of an energy efficient house How energy efficient homes are rated on the EnerGuide.
Energy Conservation within walls. Energy conservation Energy cannot be created or destroyed but can simply be changed from one form to another. The more.
The Climate Challenge Matt Dobson Regional Director, Royal Institute of British Architects Opportunities for UK business.
Nonrenewable energy is energy that comes from the ground and is not replaced in a relatively short amount of time. Fossil fuels are the main category.
National Trust energy approaches. –
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
67 Temple Avenue The reality of energy savings in retrofit Owen Daggett 25 th September 2012.
Critique 3 Adam Boney, Fraser Cassels, Marc Breslin and Nick Burns.
Wales Building Regulations 2013 Part L Existing non-domestic buildings September 2012.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Energy Efficiency and VAT !. 5% or 17.5% VAT ?  What can be charged at 5%  When can it be charged  Why does it matter?
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Unit 6/P6 – Timber Frame Construction Name ________________
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
QUIZQUIZ Check your knowledge before starting your practical tasks Energy Efficient Renovation of Old & Historic Buildings START YOUR TEST.
Conservation of Building Energy 3A9 Construction Technology Dr S Pavía Dept of Civil Engineering Trinity College Dublin.
Energy Conservation Building Upgrades Alma School District.
When drawing your plan, try and add as much detail as you can, labelling different features, such as double glazed windows and cavity walls. Draw two.
Energy Analysis Workshop Simon Waters Pro Enviro Funded ByDelivered byPartnered by.
My Energy Efficient Home. Agenda Planning and design – Site, climate, form and layout Building envelope and element performance – Thermal resistance –
Dublin City Council Fabric Upgrade Programme Shane Hawkshaw Senior Executive Engineer Dublin City Council.
The Cumberworth Radical Retrofit, West Yorkshire. Designed and Built by Leading to Carbonlite Retofit Certification.
Architecture Supported by:
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
Insulation Objectives
Sustainability Assessment of Family House - Case Study
Getting to Zero Carbon Heather Stamp Low Carbon R&D Manager
LEVEL 4 Air Pressure Testing
External Walls Carl James.
Building Methods Types of Structure.
Energy Efficiency for Ashton Hayes
[16469] Low Energy Building Design
Energy Efficiency Standard for Social Housing (EESSH)
FLOATING STUDENT RESIDENCE
Building energy rating (BER) means the energy use for rooms and water heating, lighting as well as ventilation on the basis of standard occupancy. For.
Environmental Services Training Group
Orla Coyle– NZEB and High Performance Retrofit- Programme Manager 15th May 2018 The Institution of Structural Engineers Nearly Zero Energy Buildings.
Social Housing Retrofit
Temperature and Heat Loss
REVISION REVISION & EXAM PREPARATION 3 CLADDING 1.
New Building Regulations L1
Building Regulations, EPBD & Part L for Existing Buildings
No. 4 Wood Street, Mansfield
Passive houses.
CMG BCAR & Technical Guidance Documents Conference 2019 Part L Conservation of Fuel & Energy – Buildings other than Dwellings Edel Murray 16th May 2019.
NZEB Dwellings and Major Renovations
Presentation transcript:

Prepared by Frank Cooney B.Arch MRIA BUILDING REGULATIONS – TECHNICAL GUIDANCE DOCUMENT: PART L, 2011 Conservation of Fuel and Energy - Dwellings Prepared by Frank Cooney B.Arch MRIA Existing c.1850 House With An Extension. Existing House Is Not A Protected Structure.  24th November 2011

 24th November 2011

 24th November 2011

An Victorian terrace house which is not a Protected Structure. Case Study 1 An Victorian terrace house which is not a Protected Structure. No Extension. No Material Alterations. No Window Replacement. No Boiler Replacement. Existing Energy rating - F Part L applies to existing buildings where a Material Alteration takes place. Part L applies to the specific element that is changed when a Material Alteration occurs. What is a Material Alteration? Conclusion For this example no Material Alterations, therefore Part L does not apply.  24th November 2011

Case Study 2 Extension To Rear New Opening In Rear Wall No Works To Existing Building No Window Replacement No Boiler Replacement Part L applies to the extension Part L applies to the opening in the rear wall as it is a Material Alteration. Part L does not apply to the remainder of the existing house.  24th November 2011

Conclusion Fabric Insulation: U-Values for the extension are those which apply to a new build. See Table 1 TGDL CO2 Emissions: Not applicable. DEAP calculation not required for extension.* - DEAP calculation must be carried out on the entire dwelling if it is being sold. Thermal Bridging: Should be limited/omitted. ‘Reasonable care’. Use ACD’s. Air Tightness: ‘Reasonable care” should be taken to ensure unwanted air infiltration does not occur. Use ACD’s. Space and Hot Water Heating Systems: Existing not being altered as boiler has sufficient capacity, therefore Part L does not apply. If extension is separated from house by door/glazed screen, and if it contains a heating facility it must have provision for automatic temperature and on/off control. Hot Water Storage Vessels, Pipes and Ducts: Existing not being altered, therefore Part L does not apply Ventilation: Background ventilation required to comply with Part F of the Building Regulations. * We recommend that a DEAP calculation is carried out regardless of Part L non requirement  24th November 2011

Refurbishment of the Existing House with no extension No Extension. Case Study 3 Refurbishment of the Existing House with no extension No Extension. Windows Replaced Boiler replaced Internal Structural Wall Removed Part L applies to works on the windows and boiler only. The removal of the wall is a Material Alteration, however Part L does not apply as it is an internal wall. Part L does not apply to the rest of the house as works are deemed to be repair and renewal, no material alterations occur.  24th November 2011

Conclusion Fabric Insulation: U-Value applies to windows only. The maximum U-Value permitted is 1.6W/m2K (Table 5)*. CO2 Emissions: Not applicable. DEAP calculation not required but it is recommended. Thermal Bridging: Applies to windows and reveals. Air Tightness: Applies to windows and reveals. Space and Hot Water Heating: - Part L does apply. - Boiler must be of 90% efficiency. - Controls/Zoning - Lagging and insulation. Ventilation: Background ventilation required to comply with Part L**. Upgrading sliding sash windows to 1.6W/m2K is a challenge. ** Increased condensation risk.  24th November 2011

Case Study 4 (What was actually carried out.) Structural Works Carried Out - Material Alteration. B1 Rated. ( 10 kilowatts short of A3). Comprehensive Upgrade of Existing Fabric - Existing Fabric In Very Poor Condition. - Existing roof timbers deteriorated, old non breathable felt. - Lime plaster to walls delaminated. - Some existing walls previously dry lined with plastic sheeting resulting in rot in joist ends. - Floor joists ends rotten - Moisture ingress at basement/lower ground floor level - Windows in poor condition - Heating system - fire and storage heaters only  24th November 2011

Part L applies to the extension. Part L applies to the existing building. Part L applies to the replacement boiler and windows. Conclusion/Works Carried Out to Existing Building Fabric Insulation: Roof U-Value required, 0.25W/m2K, Actual U-Value achieved, 0.16W/m2K. Gutex on existing rafters. Cellulose between rafters with ‘intelligent’ air tightness membrane. External Walls: U-Value required, 0.55/0.35W/m2K, U-Value achieved, 0.31W/m2K. - Plasterboard, not foil backed, on ‘intelligent’ air tightness membrane. Thermally broken metal stud with breathable insulation. Detailed condensation risk analysis carried out, quality control at installation of membrane. - Ground Floor: U-Value required, 0.45W/m2K. U-Value achieved, 0.18W/m2K. Concrete on 200mm insulation on tanking membrane. Quality control re: detailing to eliminate cold bridges and achieve continuous air tightness.  24th November 2011

- Windows: Sliding sash restored - Windows: Sliding sash restored. Double glazed using system approved by Scottish Heritage. Air tightness at shutters and wall junctions. CO2 Emission: DEAP calculation carried out. Thermal Bridging: Detailed analysis using Therma/Wufi software. Careful detailing to avoid cold bridging and condensation. Air Tightness: Internal air tightness membrane. Air tightness/’intelligent’ membrane - Quality control systems/continuity. - ‘Balloons’ fitted in existing chimneys. Blower Door Test: 1.8 m3/hr/m2 - ‘ Balloons’ in chimneys - HRV fitted Solar Thermal - subject to Planning Permission - 600ltr buffer tank- 5 heating zones- thermostats on all zones

Conclusions/Works Carried Out To Extension Fabric Insulation: - Roof U-Value required, 0.16W/m2K. U-Value achieved, 0.14W/m2K. - Wall at upper ground floor, timber frame. U-Value required, 0.21W/m2K. U-Value achieved, 0.12W/m2K. - Wall at lower ground floor, wide cavity masonary construction. U-Value required, 0.21W/m2K. U-Value achieved 0.13W/m2K. - Lower ground floor, raft foundation on super grund. U-Value required 0.21W/m2K. U-Value achieved, 0.18W/m2K. - Triple glazed 0.8 U-Value windows to rear, restored sliding sash to front.  24th November 2011

CO2 Emissions: DEAP calculation carried out for extension and existing dwelling. Thermal Bridging: Therma/Wufi analysis carried out on all details. Air Tightness: Internal air tightness membrane. Air tightness/ ‘intelligent’ membrane - quality control systems/continuity. Blower Door Test: 1.5 air changes. - ‘ Balloons’ in chimneys - HRV fitted Solar Thermal - subject to Planning Permission - 600ltr buffer tank- 5 heating zones- thermostats ion all zones  24th November 2011

does not apply to the existing dwelling which remained untouched. Conclusion: Case Study 1: Repair and Renewal - Part L does not apply as no Material Alteration took place. Case Study 2: Extension to Rear - Part L applies to the extension and rear wall of the existing dwelling as a material alteration occured in the form of an opening. However it does not apply to the existing dwelling which remained untouched. Case Study 3: Refurbishment of the Existing House with no Extension - Part L applies to the works on the windows and boiler only. Part L does not apply to the rest of the house as works are deemed to be repair and renewal, no material alterations occur. Case Study 4: Refurbishment of Existing and Extension to the Rear - Part L applies to the entire dwelling, the extension and the existing as Material Alterations were carried out. The U-Values of the existing dwelling must comply with Table 5 of TGDL and the U-Values of the extension with Table 1 of TGDL. Part L also applies to the boiler and all windows.  24th November 2011

Frank Cooney B.Arch MRIA  24th November 2011