Børge Svane Nielsen/JJG

Slides:



Advertisements
Similar presentations
CR7-FMD, 19 March 2007Jens Jørgen Gaardhøje, Niels Bohr Institute 1 Forward Multiplicity Detector FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Advertisements

Thermal simulation, CERN, 11 Nov 2002Børge Svane Nielsen, NBI1 FMD: Silicon multiplicity detectors Thermal simulation meeting, CERN, 11 November 2002 Børge.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Technical Forum, 8 March 2007Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute FMD 1 FMD 3 FMD 2 Outer ring Inner ring.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
1 Luciano Musa CERN participation to EUDET for TPC electronics CERN, 31 August 2006 Outline Part I – Development of the readout electronics for the LPTPC.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
ALICE Si-FMD,T0,V0 26/ Jens Jørgen Gaardhøje, NBI, Si-FMD oUpdate on Status oConceptual design of FEE and BEE-DAQ chain oTimetable.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range: 14 bit range, 10 bit accuracy ● Summing signals from 6 detectors.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
29/ Jens Jørgen Gaardhøje, NBI, Forward Detectors TDR FMD, T0, V0 Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm (NBI)
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
17th March 2005Bernardo Mota / CERN - PH TPC FEE Status and Planning CERN, 7th March 2005 Content  Introduction  Status and Milestones  PASA, ALTRO.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
The ALICE Forward Multiplicity Detector from Design to Installation.
The ALICE Electromagnetic Calorimeter
Integrating part of the ATLAS Radiation Monitor will measure
Valerio Re INFN Pavia and University of Bergamo
Developing Radiation Hard Silicon for the Vertex Locator
KLOE II Inner Tracker FEE
A General Purpose Charge Readout Chip for TPC Applications
FCAL R&D towards a prototype of very compact calorimeter
Evidence for Strongly Interacting Opaque Plasma
CERN R&D plans and Infrastructures
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Alexandre Rachevski, Francesco Prino
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
The digital read-out for the CSC system of the TOTEM experiment at LHC
Charge measurement of STK
SVT detector electronics
SVT detector electronics
Radiation Backgrounds in the ATLAS New Small Wheel
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
SKIROC status Calice meeting – Kobe – 10/05/2007.
Commissioning of the ALICE-PHOS trigger
Optical links in the 25ns test beam
The digital read-out for the CSC system of the TOTEM experiment at LHC
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Silicon pixel detectors and electronics for hybrid photon detectors
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The CMS Tracking Readout and Front End Driver Testing
SVT detector electronics
PHENIX forward trigger review
SALTRO16 activities in Lund
The LHCb Front-end Electronics System Status and Future Development
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Børge Svane Nielsen/JJG Status of FMD Technical Forum CERN, 17 March 2004 Børge Svane Nielsen/JJG Niels Bohr Institute Integration and mechanical issues Sensors Preamp-shaper chips Hybrids Read-out strategy FMD-TDR Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Forward detector overview Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Beam and FMD support cone RB26 side Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Finite element calculations of beam pipe support stresses Prototype beam-pipe support structure (crucial for LHC) in construction at NBI 33 m Displacements Less than 50 mum Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Børge Svane Nielsen/JJG, NBI FMD sensors 512 strips 256 strips Inner module Final negotiations with (Micron/Hamamatsu) ongoing. Outer module Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Custom preamp-shaper chip Radiation hardness > 500-1000 krad Peaking time 0.7-2.0 sec (optimised at 1.2-1.4 sec) Noise (ENC) < 500 e- (= 0.02 MIP) Capacitance matching 5-25 pF Dynamic range 0-20 MIPs (or ±10 MIPS) Highly integrated 128 channels per chip Read-out speed ~ 10 MHz Test and calibration circuits included Power consumption 0.6 mW per channel Compatibility with ALTRO requires level shift Early prototype VA1’ useful Affordable cost yes Channel count 51,200 (400 chips à 128 channels) VA1_ALICE 50 m input pitch Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

VA1_ALICE noise simulations Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Børge Svane Nielsen/JJG, NBI Hybrids Inner module VA1_ALICE (128 channels) pitch adapter (ceramics) bonding (CERN) Sensor - Custom production of adapted VA1 - Hybrid design settled with IDEAS. Connectors for power, control, read-out, bias Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Radiation environment Doses and Fluences in Central ALICE (10 years running): FMD: 4.2 cm | 28 cm Radius [cm] Dose [Gy] Neutrons [cm**-2] h- 3.9 2450 8.2E+11 3.5E+12 7.6 560 5.7E+11 1.3E+12 14 200 4.6E+11 5.5E+11 24 100 4.3E+11 3.2E+11 40 4.1E+11 2.3E+11 45 26 4.0E+11 2.0E+11 78 13 3.6E+11 1.5E+11 Belle measurements SSD2 TPC(in) Doses in FMD: Dose [Gy] h- [cm**-2] FMD1 80-1300 8.6-13.0E+11 FMD2 40-2100 1.3-6.1E+11 FMD3 900-3100 2.2-5.2E+11 =0.31 Mrd Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

New read-out strategy FMD Read-Out and Control Electronics FMD Module ON DETECTOR IN COUNTING ROOM VA 1 ring: 10/20 modules 2 Digitizers 1 RCU per ring system Full FMD: 70 modules 10 Digitizers 3 RCU’s FMD Read-Out and Control Electronics VA read-out control TTC-RX BOARD CTRL FMD Digitizer ALTRO (16 ch) Read-out CTRL BSN, 17 Feb 2004 Local Monitor and Control controller Bus controller ( conf. & R/O ) DCS int. (Ethernet) DAQ int. (DDL-SIU) Trigger int. (TTC-rx) Data Proc. and Memory DCS DDL TTC optical Link (Clock, L1 and L2 ) RCU Front-end bus  1 m  16 Control Network (I2C-serial link) Trigger L0 NEAR PATCH PANEL Analog serial link (10 MHz)  0.5 m Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Proposed new RCU location DAQ RCU FMDD Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Error estimates per run Estimates of SEU High Energetic Hadron Flux (@ TPCin): 250 – 550 hadrons / sec • cm2 Error rate per run (4 hours) per device FEC 3•10-4 RCU 1.5•10-2 DCS 3•10-2 Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Børge Svane Nielsen/JJG, NBI FMD and TDR milestones Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI

Post Doc position at NBI Post Doc for the ALICE Silicon-Forward Multiplicity Detector Niels Bohr Institute The High Energy Heavy Ion Group at the Niels Bohr Institute, University of Copenhagen, has a post doc position available to help in building the FMD. We are seeking af person with documented expertise in Silicon detector design, construction and operation and experience in front-end and read-out electronics. The position is available immediately. The appointment is formally for one year, with possibility of prolongation up to 5 years. For further information contact: J.J. Gaardhøje, email: gardhoje @ nbi.dk or B.S. Nielsen, email: borge @ nbi.dk Applications, including CV, list of publications, names of 3 referees, details of past experience to: J.J.Gaardhøje, Niels Bohr Institute, Blegdamsvej 17, 2100 Copenhagen, Denmark Technical Forum, 17 Mar 2004 Børge Svane Nielsen/JJG, NBI