Natural Gas Infrastructure Assessment

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Liaison Report CREPC Liaison Report Lou Ann Westerfield Idaho Public Utility Commission Market Interface Committee March 6-7, 2008.
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
© 2001 Utility Management Consulting, Inc. All Rights Reserved Distributed Resources Interconnection Policies: A Report to EEI Members Presentation of.
Overview of WECC and Regulatory Structure
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Security at FERC Energy Projects Energy Bar Association Mid-Year Meeting Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory.
1 CREPC 101 September 19, 2005 San Diego. 2 CREPC 101 CREPC History – Doug Larson Operation of Committee – Marsha Smith Relationship with other Western.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
JJ Jamieson MIC Chair MIC 2015 GOALS March 24, 2015 SLC.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
The “New” WECC Jim Robb – Chief Executive Officer JGC Meeting Salt Lake City, UT January 30, 2014.
Department of Energy Energy Agency Reorganization Plan Little Hoover Commission Hearing on Governor Schwarzenegger’s Plan to Establish a Department of.
Natural Gas Infrastructure Assessment
WECC MAC Committee Update
RAC Implementation Status
Reliability Assessment Committee Proposal TSS Meeting
MAC Board Effectiveness Survey
Massachusetts Electric Restructuring Roundtable
Presentation to the MA Electric Restructuring Roundtable
Michael I. Henderson ISO New England Inc.
CIPC Relationships & Roles
Scenario Scoping Process
NASUCA Mid Year Meeting Gas Reliability
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Cold Snap Task Force Update
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
Balancing the Operating Budget Ward Forum Presentation
Planning Coordinator - Gap Resolution Team (GRT)
Grace Anderson Chair, Budget Work Group April 19, 2017
Department of Licensing HP 3000 Replatforming Project Closeout Report
Grace Anderson Chair, Budget Work Group April 19, 2017
Integration of Variable Generation Task Force (IVGTF): Status
ADS and WPR Seed Case Background
Nicor Gas Economic Development
Byron Woertz Manager, System Adequacy Planning
WECC Staff Risk Prioritization
Special MRC – Fuel Security
Transforming Scenario Narratives into Study Cases
Transforming Scenario Narratives into Study Cases
RAC Implementation Status
Future Scenario Development
Resilience Framework Mark Lauby, Senior Vice President and Chief Reliability Officer WIRES Winter Meeting February 15, 2018.
Context: Scenario Studies
Byron Woertz, Manager—System Adequacy Planning
Strategic Planning Process
Long Term Grid Assessment – Preparing for 2018 Studies
Natural Gas Infrastructure Assessment
Strategic Planning Process
Context: Scenario Studies
Scenario Scoping Process
Grace Anderson Chair, Budget Work Group April 19, 2017
Grace Anderson Chair, Budget Work Group April 19, 2017
Byron Woertz, Manager—System Adequacy Planning
WECC Staff Risk Prioritization
MAC Board Effectiveness Survey
WECC 2019 Scenarios – Scoping
ADS and WPR Seed Case Background
Eric Baran, WIRAB Staff April 30, 2018
MAC Report Gas-Electric Interface Study
Future Scenario Development
Assessing Utility Mix Risks/Exposure
Reliability Workshop Summary
MAC Input on Section 4.9 Review
NERC Planning Committee Update
Presentation transcript:

Natural Gas Infrastructure Assessment Jim Robb Chief Executive Officer Western Electricity Coordinating Council

Western Electricity Coordinating Council Study Purpose Identify potential future reliability risks related to the current and future natural gas infrastructure Contingencies Identify key natural gas related contingencies that should be included in utility planning Dependence Highlight risks associated with increasing dependence on gas—communicate to key policy makers Mitigation Identify risk mitigation options for policy maker and utility consideration Western Electricity Coordinating Council

Western Electricity Coordinating Council Key Concerns How secure and reliable is the gas supply? Supply restrictions due to weather or other supply disruptions Impacts of firm vs. interruptible contracts Can and will any needed new infrastructure be built in a timely manner? Challenges in permitting and siting Is there adequate flexibility to meet future electric system operational needs? Use of storage as a “shock absorber” to balance increasing ramping needs Use of storage and pipeline pack to meet deliverability requirements How should mid-stream risks be factored into electric reliability planning? Critical storage fields Critical processing facilities Interstate pipeline availability Western Electricity Coordinating Council

Western Electricity Coordinating Council Proposed Scope Western Interconnection BES, with primary focus on US-based generation Future scenario based on WECC’s 2026 Common Case load forecast, resource mix, and transmission topology Rely on public sources for other needed information (e.g., core gas loads) Western Electricity Coordinating Council

Western Electricity Coordinating Council Deliverables Map BES assets to natural gas infrastructure and identify key points of vulnerability Assess infrastructure adequacy to meet future needs based on 2026 Common Case Assess the firmness of Western Interconnection gas supply and transportation contracts (ROP 1600 Request) Identify key planning contingencies for utility planners to consider Western Electricity Coordinating Council

Deliverables (continued) Identify and assess risks of supply-side constraints and options for planning around them (e.g., Mexican gas exports) Identify operating protocol issues that should be reconciled Identify one or more “stress test” scenarios (e.g., weather and/or infrastructure failure stresses) and assess risk of cascading electric outage Suggest mitigation options for reducing any identified risks Western Electricity Coordinating Council

Technical Advisory Committee Project Structure Steering Committee J. Robb, Chair 3-4 WEIL Members 1-2 Policy-Regulatory 1-2 Natural Gas Industry Core Team WECC Staff Gas Consultant Technical Advisory Committee Electric Gas WIRAB NGO NERC Other TBD Western Electricity Coordinating Council

Western Electricity Coordinating Council Next steps Factor in responses from WEIL, WIRAB, WECC MAC and NERC Technical session review with WECC Board in March RFP for consulting support in March, selection in April Establish data sharing protocols once consultant selected Initiate project mid-year Western Electricity Coordinating Council