2009: restart the system: few observations. Hw maintenance week:

Slides:



Advertisements
Similar presentations
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
Advertisements

13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Problems with Muon System N. Bondar O.Maev
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PreShower Characterisations
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Pre-Processing electronics Maintenance Hardware - Firmware
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
CCS database requirements
Status of the TOF Detector
Equipment Tests for DHC Tower
Trigger issues for the CALICE beam test
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Presentation transcript:

2009: restart the system: few observations. Hw maintenance week: HW Maintenance – JANUARY 2009 Outline: 2009: restart the system: few observations. Hw maintenance week: - The devices to repair. - The checks. TRIG_PGA: the status. S.Monteil PS/SPD COMMISSIONING

2009: restart the system: few observations. HW Maintenance – JANUARY 2009 2009: restart the system: few observations. Power rectifiers changed. We checked that each module of interest for us powers correctly. A reboot of RCM crates was necessary. 2) HV system repaired and reinstalled (and calibrated): it worked fine. 3) LEDs: we saw light in the DAQ. This is a way to say that the entire slow control chain was used. Several problems here and there overcame (as usual). HLT dysfunctionned due to a FEST test. Fixed after we left. No data recorded. 4) Evgueni G. and Anatoli K. can now work on LED light yield uniformization. S.Monteil PS/SPD COMMISSIONING

HW maintenance: latest observations. HW Maintenance – JANUARY 2009 HW maintenance: latest observations. We performed systematic pedestal measurements and connectics checks for the whole A-side and C-side. They exhibit the same problems as before. In addition, we lost the PSFEB07 half-board (VFE SM1-T03). Pedestals were wiggling in a recent past. They rest in peace now. S.Monteil PS/SPD COMMISSIONING

HW maintenance: C-side actions. HW Maintenance – JANUARY 2009 HW maintenance: C-side actions. 1) Two malfunctionning VFE boards: SM3-T01, SM1-T03. Actions: Check clock connection. Check the power supply connection. Replace the boards if necessary. Remeasure their pedestals. S.Monteil PS/SPD COMMISSIONING

HW maintenance: C-side actions. HW Maintenance – JANUARY 2009 HW maintenance: C-side actions. 2) List of malfunctionning or dead channels ([Feb,Ch] Matrix): [23,28], dead channel. Guess: bad VFE connection. [53,24], large pedestal : 263. Actions: For the former, plug/replug the cable. For the latter, we already decided to live with that. S.Monteil PS/SPD COMMISSIONING

HW maintenance: C-side actions. HW Maintenance – JANUARY 2009 HW maintenance: C-side actions. 3) One PMT base has a too large current consumption. (SM2-T03). But no effect observed on cosmics data. Action: Change the board. Check whether consumption decreases. If the measured current is related to light entering into the tube, we’ll lose it at some point. Better to change it. S.Monteil PS/SPD COMMISSIONING

TRIG_PGA: the status. HW Maintenance – JANUARY 2009 I remeasured for two crates the ranges of phasers sampling the ECAL data after installation of ECAL-FEB w/ new serializers. Basically no change. Even better in few cases. Not an issue. Hervé looked at a redesign of the TRIG_PGA in case the trigger path commissioning results of 2009 requires to reprogram. So far, two achievements: One clock cycle might be saved in the current architecture. Anecdotic. Grouping all data in the center of the chip to uniformize sampling time (LAL empirical advice) improved the sampling of one ECAL data and degraded the other. It seems that Rémi followed an opposite recipe. No obvious path. Tries and fails. S.Monteil PS/SPD COMMISSIONING