Integration & Commissioning

Slides:



Advertisements
Similar presentations
Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
STUNBICH STUNBICH INVESTMENT LIMITED ADVANCED LOGISTICS AND PROCUREMENT SERVICES RC:
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Supply Chain and Logistics Management
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Course guide on Food Plant Design and Pilot Demonstration (FST 409) University of Agriculture, Abeokuta Department of Food Science and Technology.
Pre-Project Components
ElecComp Case Large contract manufacturer of circuit boards and other high tech parts. About 27,000 high value products with short life cycles Fierce competition.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Construction of a Transfer Station
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Planning and Realisation of Wind Farms
Joanne Macgregor C Lund & Son Ltd March 2016
Director’s Progress Review Closeout Meeting
Constraints Space Load Capacity Costs Operating hours.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Distribution Strategies
Types of information systems (IS) projects
Electronics and Controls
Western Michigan University Central Power Plant
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Chapter 3 Supply Chain Drivers and Obstacles
Food Plant Design and Pilot Demonstration
Technical Scope of Work
Feasibilty/Concept Study Mid Term Status Review
OVERVIEW Impact of Modelling and simulation in Mechatronics system
ERP = Enterprise Resource Planning
Facility Concept Design and Study
Common Learning Blocks
Operations Concept Simon Radford and Operations Committee
April 27, 2016 You need paper & pencil NO Test on Friday! 
Feasibilty/Concept Study Mid Term Status Review
ChE 473K Plant Design R. Bruce Eldridge.
Lean thinking in EPC Projects
Good vs Evil Distribution Math  You need paper & pencil
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Request for Proposal (RFP)
Welcome Back Distribution Math  You need paper & pencil
Chapter 3 Supply Chain Drivers and Obstacles
Management Breakout: MREFC Budget Summary Victor L
Chapter 9 Achieving Operational Excellence and Customer Intimacy: Enterprise Applications.
Technical Scope of Work
Lowering Costs Through Unique Solutions
Director’s Progress Review Closeout Meeting
6 MMC (Off Site Production)
Lockheed Martin Canada’s SMB Mentoring Program
Chapter 3 Supply Chain Drivers and Metrics
Architecture for Modular Data Centers
Software Engineering Software Engineering is the science and art of
ARCH 435 PROJECT MANAGEMENT
Far Experimental Hall Hutches Civil Construction
A Draft Funding Model for the SKA
Software Engineering Software Engineering is the science and art of
Building Construction
NSS integrated installation plan workshop Introduction
CICA Lift of the Year ≤20 tonne load Entry Template
Presentation transcript:

Integration & Commissioning T.A. Sebring 13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review

Challenges of Integration & Commissioning Difficulties Include Logistic, Environmental, and Technological Difficulties Increased by Size, Precision, and Location Transportation of Large Systems Overland and By Sea a Traditional Challenge Remote Nature of Atacama Challenges Availability of Services and Labor Transition from Project to Operations Difficult Planning and Execution the Key to Successful Integration, Commissioning, and Handover to Operations

Methodologies for I & C Develop Detailed Plans Prior to Initiation of Integration Review Plans with Project, Contractors, and Chilean Support Test Subsystems at Manufacturers Implies Trial Assembly and Partial or Full Operability Ensures that Parts Fit and Systems Work Prior to Arrival in Chile Can Include Integration with CCAT Control System Rework Difficult Once System is in the Atacama Packaging & Shipping Systems Designed to Facilitate Shipping Using Standard Containers & Racks As Possible Contractors Responsible to Get Systems to Nearest Port CCAT Will Arrange Transport from Port to Site Better to Have One Entity than Many Figuring this Out Customs and Entry of Systems Into Chile Will Need Management

SOAR Mount Shipping

Mount Goes on Board Last Minute Insurance Change Nets ~$10 K Savings Ship Change by Line Causes $6K Insurance Surcharge SOAR Organizes Load Consolidation For <$ and Part Safety SOAR Mount Goes to Sea – 2 February 2002

Site Development & General Construction Anticipate Continued Use of M3 Engineering & Technology for Design Will Almost Certainly Use Chilean Contractors for Road Building, Site Improvement, General Construction CCAT Site Manager Hired Shortly Prior to Construction & Will Manage Contractors Will Need a Mechanical Technician Almost Immediately Integration Phase of Project Will Begin When Facilities are Completed (or Nearly So) This Will Provide Housing & Workspace for Integration Activities

General Construction Complete Power, Networks, Sanitary Facilities, Cranes, etc. In Place Facility Stocking Develop Full Inventory Based on Other Telescopes Order All Equipment & Supplies in US Containerize and Ship in One Shipment to Site Eliminate “Trips to the Atacama Hardware Store!” General Construction Contractor and/or Subcontractors Supply Support to Integration

Large System Integration Dome & Mount Must Be Coordinated High Lift Through Dome Opening…May Want to Install Major Mount Components First Large Cranes Required In Any Event…Largest Lift ~60-80 Tons Geometry of Building Affects Crane Access Contractors Will Provide Technical Assistance Detailed Assembly and Test Plans On Site Support for ~4 Weeks for Each System Separate Support to Heavy Erection & Controls/Sensors Integration Same Personnel As Worked with Trial Erection And Debug in US Steel Workers Provide Majority of Hand Labor Same Personnel as Worked on General Construction of Facility One Work Force Through Entire Large Scale Integration Activities

Small System Integration Small Systems Installed by Project Team May Include Some Support Contracts for Trades Electrical, Mechanical, Painting, etc. Culminates in Installation of Initial Instrument/s and Sensors (Guider/Wavefront Sensor) Completion of Integration Culminates in First Light All Systems Operating Under Central Control System Command Performance is a Useful Fraction of Nominal Specified “Images” Adequate to Serve as “Good Press” Initiates Commissioning

Commissioning Period of Optimization of Telescope Performance Jointly Pursued by Project and Operations Teams Pattern of Nighttime Observation Noting Performance Shortfalls and Daytime Engineering Optimization in Response Typically a Lot of Software Improvement Progressively Greater Time Spent on Science Observations Culminates in Final Performance Test & Handover to Operations

Manpower Initial Presence is Site Manager, Full Time Chilean Post Project Team Gradually Takes Us Residence in Chile as General Construction is Complete Anticipate Project Team Lives in Santiago and Works Tourno Shifts as Ops Team Will Supplemental Labor Steel Erection Contractor from General Construction “Local” Trades Contractors Technical Support from Contractors Supplying Major Systems Operations Team: Added as Early as Possible Become Familiar with Facility and Systems Obviates Us vs Them Mentality Provides Additional Required Manpower

Feasibility: Good Concept Has Worked Successfully for Several Chilean Telescopes Sufficient Labor is Available in the Atacama Minimizing Rework on Site Will Save $$$$ Additional Cost for Pre-Integration at Contractors is Money Well Spent Will Need to Pay Attention to Crane Geometry wrt Lifts and Obstructions Detailed Costs for Integration Can be Developed During Engineering Concept Phase