City of Appleton Stormwater Management Update Presented to the

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
ROUTE 27 (PARK STREET) CORRIDOR SEWER EVALUATION Mark J. Thompson, P.E. Gus O’Leary Kleinfelder / S E A Consultants Inc.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
Minimal Impact Design Standards (MIDS) Calculator Training WELCOME November 13, 2013.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Anne Arundel County Department of Public Works. OBJECTIVE MINIMIZE OR ELIMIINATE FLOODING FROM FREQUENT SMALL STORMS Storms of 1- to 2-year frequency.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.
City of New Braunfels Edwards Aquifer and the Habitat Conservation Plan HCP Implementing Committee May 29,
Golf Course Water Resources Best Management Practices TOOLBOX  Project Overview  Your Role in the Project April 2009.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Executive Committee Meeting February 27, Year Assessment Report Overview This is the fifth annual report on the basin management action plan (BMAP)
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Minnesota Pollution Control Agency Welcome! Medicine Lake Excess Nutrients TMDL Project Steering Committee Meeting #5 May 14, 2009 Photo by: Terrie Christian—President,
The Use of Environmental Management Systems in Permitting Decisions National Environmental Partnership Summit 2006 May 10, 2006 Christine Steagall SC Department.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
City of Appleton Stormwater Management Update Presented to the January 22, 2013 Utilities Committee.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
Spokane River Forum March 26, How the City manages runoff Separated Storm Sewers Combined Storm Sewers Evaporation Infiltration.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville.
Peru Creek Water Quality Improvements 319 Grant Update February 12, 2014.
Multi-Jurisdictional-Use Facilities Flow Analysis Study Update Presented to Blue Plains Regional Committee March 24, 2011 District of Columbia Water and.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
City of Appleton Stormwater Management Update Presented to the June 11, 2013 Utilities Committee.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
© Amec Foster Wheeler Business Analysis for Canal Management Principles, Experience and Key Decision Points.
Leap-frogging towards water resilience in Dar es Salaam and Addis Ababa Lise Herslund and Antje Backhaus Institute for Geosciences and Natural Resource.
City Council Presentation September 19,  April ◦ Departments begin line item budgets and projections ◦ Departments submit new program, personnel.
1% Sales Tax Commission Board Meeting June 3, 2015.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
TMDL Implementation: Now What?
Welcome to the Libertyville Stormwater Master Plan Open House
Update on PI Modeling and Nitrogen Removal at Blue Plains
Comprehensive Sewer Planning Update Meeting
Delivering Water Reuse Solutions
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Manchester’s CSO Program: A Look Behind and a Look Ahead
107th & 110th Avenue North Public Utilities Renewal Projects
Regulatory Requirements Background
Town of Melbourne Beach
MACo Winter Conference
Land Use and Zoning Committee Special Workshop
City of Forest Lake MS4 Program
GIS Data Management for SHA’s Bay Restoration Program
Stormwater Management Program
Tulsa's Risk MAP Program Goals
West Campus Parking Deck & Roadway Update
Chesapeake Bay TMDL Milestones, Progress, Mid-point Assessment
[OUR CITY NAME]’S OLD SEWERS
Fixing Our City’s Old Sewers
Sprague Avenue Phase II Survey Results and Next Steps
Status of Romanian Pilot Study
Design and Engineering Services
Sacramento Environmental Commission January 2019.
Space Coast TPO State Road (S.R.) 528 Update
SHOAL CREEK WATERSHED ACTION PLAN
Bay Area Watershed Network
Presentation transcript:

City of Appleton Stormwater Management Update Presented to the Utilities Committee April 23, 2013

Ongoing Projects Douglas and Outagamie Streets (Spencer Locust Basin) CONSTRUCTION PROJECTS: Reid Golf Course Ponds, Channel Modifications, and Bridges FLOOD STUDY PROJECTS: CTH OO Basin Manitowoc Road Study Area West Wisconsin CAPITAL PROJECTS: Douglas and Outagamie Streets (Spencer Locust Basin) Ballard Road Urbanization/Lightning Drive Construction STORMWATER MANAGEMENT PLAN UPDATE GREEN TIER WATER RESOURCES SITE DEVELOPMENT STORMWATER REVIEWS

Reid Golf Course Ponds and Channel Modifications Construction started back up this month Begin work on East Pond

CTH OO Basin Study Final memo delivered to City Many ponding areas through basin; Limited flood reduction benefits without increasing flows downstream.

Manitowoc Road Study Final memo delivered to City. Several ponding areas through basin; limited flood reduction benefits without increasing flows downstream or removing existing development. Will continue discussions with WisDOT on potential cost-share opportunities.

West Wisconsin Study Evaluating options including relief sewer, underground storage, and above ground storage.

Douglas and Outagamie Design Assistance Final memo delivered to City Alternative 3A selected – reduces flooding throughout system

Ballard Road Urbanization and Lightning Drive Alignment Evaluation Final memo delivered to City. Provides options for compliance with water quality and quantity requirements when roads are urbanized/built. Also addresses floodplain issues.

Stormwater Management Plan Update Continuing to interact with WDNR on TMDL implementation and modeling for compliance with Waste Load Allocations. Waiting for further direction from WDNR for comparison with TMDL numbers.

Green Tier Water Resources Developed preliminary project list with City for pilot projects to implement under Green Tier program with WDNR Water Resources Plan not needed at this time.

Stormwater Reviews – New and Redevelopment Kwik Trip Evergreen Commons Dollar Tree RiverHeath St Elizabeth’s Hospital BedTower