GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
PKI deployment in the Aerospace Industry
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
GLOBALink/HF Data Link
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
ACARS & VDL Mode AVICOM Japan
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
GLOBALink/VHF Digital Link Mode 2
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
ATN2002 IEE, London Providing Communications Services to Support ATC Applications Akhil Sharma Senior Manager AIRCOM Service Development.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
GateFusion Wireless Content Delivery
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
ARINC PROPRIETARY Long Range Satellite Communications Prepared for SOCM/2 February 8 -10, 2012.
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
ATN September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry.
POA / AOA Evaluation Recommendation
DCIT / Media Management Session FAA DataComm – OTA FANS Validation Airbus FANS comm media management 17 Nov 2011Airbus FANS comm media management Presented.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
ACARS Media Management Prepared for DCIT #23 Systems Integration Working Group.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
WORKING GROUP I (WG-I) AEEC IPS Update
PKI deployment in the Aerospace Industry
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Workshop on preparations for ANConf/12 − ASBU methodology
FAA NAVAID Rationalization / Resiliency Overview
NEXCOM Next Generation Air/Ground Communications
Presented by Thales Avionics ATN 2003 London, UK September 2003
AERONAUTICAL COMMUNICATIONS PANEL (ACP)   SEVENTEENTH MEETING OF THE WORKING GROUP M   Bangkok, Thailand 31 January – 1 February 2011 INFORMATION PAPER.
ATN London - 23 September 2003 Alex Wandels
ATN/VDL Mode 2 Implementation Status
International Civil Aviation Organization
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
NEXCOM Next Generation Air/Ground Communications Appendix G
Presented at ICAO ACP WG-I By Robin Hughes
IBAC – CNS/ATM Datalink Briefing
Workshop on preparations for ANConf/12 − ASBU methodology
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
ICAO AMCP WG-M/1 meeting, December 2000
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
An Airline Perspective
Presentation transcript:

Dan Pendergast dpenderg@arinc.com GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2 Prepared by: Dan Pendergast dpenderg@arinc.com 410-266-2267 Presented by: Bassam Farroha bfarroha@arinc.com 410-266-2160

Overview VDL Mode 2 Accomplishments to Date VDL Mode 2 Development Activities VDL Mode 2 Deployment Activities CPS = ACARS Central Processing System

VDL Mode 2 Progress Summary GLOBAL ink VDL Mode 2 Progress Summary

ARINC’s Overall VDL Mode 2 Progress Summary Initial VDL AOA Operational Capability Deployed and Operational VDL AOA AQP Capability Established First Flight Successfully Accomplished Boeing Black Label Certification Underway Deployment Activities for VDL Coverage Expansion Underway ATN Development Meeting Milestones CPS = ACARS Central Processing System

Development Activities GLOBAL ink ARINC VDL Mode 2 Development Activities for 2001

VDL Mode 2 Program 2001 Development Activities AOA Develop and deploy first maintenance release in June Enhance AQP capability Deployment RF test/analysis accomplished Avionics Interoperability Testing for AOA and ATN Collins underway (AOA and ATN) Airbus/Aerospatiale underway for AOA Boeing type certification underway FAA interoperability tests underway (ATN) EuroControl PETAL tests underway (ATN ground/ground) Honeywell imminent (AOA) Teledyne imminent (AOA)

VDL Mode 2 Program 2001 Development Activities ATN PETAL Software test near completion and fielded within the next 30 days end-to-end CPDLC message delivery proven over the RF AA 767 w/Collins CMU/ARINC ATN network/Maastricht 5 of 6 Ground stations deployed in Europe 2 AGRMs deployed in Europe ATN routers deployed Engineering network operations center established PETAL aircraft certification Two AGTS’s deployed and operational at Dallas-Fort Worth and Tulsa Aircraft certification underway PETAL operational from May through October ‘01

VDL Mode 2 Program 2001 Development Activities ATN Deployment Activities for Miami Airspace Coverage requirements defined with FAA and American Airlines Ground Stations fielded as part of AOA deployment in 2001 and early 2002 additional Florida and Caribbean sites required ATN Service Operational in December ‘01 Will support CPDLC Build I and AOC needs ATN initially cut-over to limited geographical area Expansion to operational service cloud in Florida in early ‘02

2001 Deployment Activities GLOBAL ink ARINC VDL Mode 2 2001 Deployment Activities

VDL Mode 2 Service and Ground Station Roll-Out Initial Operational Capability Established 2001 Deployment Activities Encompasses: Installing over 80 VDL retrofit kits for currently deployed VDL-capable ground stations Beginning deployment of over 90 new ACARS/VDL operational ground stations Over 20 retrofit kits fabricated to date Deploying Air/Ground Routers/Regional Managers (AGRMs) Establishing VDL Mode 2 ATN IOC capability 2001 Deployment Coverage Continental US focus is en-route cloud and CPDLC coverage Europe focus is cloud to support Airbus VDL production certification

VDL Mode 2 Service and Ground Station Roll-Out VDL Ground Station Deployment Approach Long lead parts ordered and fabrication underway Operational testing underway to ensure smooth implementation (especially at high volume “critical” airports) Begin deployment at @ 20 ground stations per month in 2Q01 with the following focus: VDL kits for already deployed VDL-upgradeable ground stations New VDL ground stations for Miami airspace and to fill in holes in en-route VDL coverage

Representative Planned Operational Coverage Currently Deployed VDL-Capable Ground Stations

Summary One Big Milestone Accomplished and Several To Go in 2001 VDL Mode 2 Is Reality Now The Focus of 2001 is: PETAL Deploying VDL Mode 2 ATN capability for AOC and CPDLC Expanding VDL Mode 2 Coverage Continuing to Work with Industry for VDL Mode 2 Air/Ground Interoperability