TRB Planning Applications Conference 2017

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June , Santa Barbara, CA SR 46 Improvement PSR/PDS Study.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation GPA Conference Fall 2012 Presented By: David Pickworth,
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
12th TRB National Transportation Planning Applications Conference
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
Presented to presented by Cambridge Systematics, Inc. Transportation leadership you can trust. An Integrated Travel Demand, Mesoscopic and Microscopic.
Can Multi-Resolution Dynamic Traffic Assignment live up to the Expectation of Reliable Analysis of Incident Management Strategies Lili (Leo) Luo, P.E.,
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Considerations when applying Paramics to Strategic Traffic Models Paramics User Group Meeting October 9 th, 2009 Presented Matthew.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
From EMME to DYNAMEQ in the city of MALMÖ. THE COMPANY Founded in early 2011 Currently located in Stockholm, Gothenburg and Malmö Small company (currently.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
Connectivity & Mobility
TRB Planning Applications Identifying the Long-Range Transportation Improvement and Funding Needs for Urban Areas in Texas By Kevin M. Hall, Texas Transportation.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
DKS Associates. 2 Corridor System Management Plan (CSMP) Travel Demand vs. Simulation Models Micro vs. Meso Simulation Models US-101 Corridor Modeling.
S. Erdogan 1, K. Patnam 2, X. Zhou 3, F.D. Ducca 4, S. Mahapatra 5, Z. Deng 6, J. Liu 7 1, 4, 6 University of Maryland, National Center for Smart Growth.
Network effects from improved traffic signals Kristina Schmidt Transek AB.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
WORK ZONE DELAY ESTIMATION Work Zone Management, Accelerated Construction, and Smart Work Zones TEAM Monthly Meeting November 16, 2004 Luis Porrello, Ph.D.,
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
Methodological Considerations for Integrating Dynamic Traffic Assignment with Activity-Based Models Ramachandran Balakrishna Daniel Morgan Srinivasan Sundaram.
Analysis of the IH 35 Corridor Through the Austin Metropolitan Area TRB Planning Applications Conference Jeff Shelton Karen Lorenzini Alex Valdez Tom Williams.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Case Study 4 New York State Alternate Route 7 Problem 2.
METRO Dynamic Traffic Assignment in Action COST Presentation ODOT Region 4 April 1,
Thoroughfare Plan Update
Nixon Road Corridor Study: Findings & Options
Evaluation of Hard Shoulder vs
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
The I-465 West Leg Reconstruction Project
Mesoscopic Modeling Approach for Performance Based Planning
Case Study 4 New York State Alternate Route 7 Problem 4
Network Attributes Calculator
Performance Measure Exploration Preparing for the 2018 RTP
- A case study in Austin TX
NGTA Halton Planning and Public Works Committee
Transportation Planning Applications Conference Sheldon Harrison
Non-recurrent Congestion & Potential Solutions
Jim Henricksen, MnDOT Steve Ruegg, WSP
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Presented to 2017 TRB Planning Applications Conference
Slugging in the I-395 Corridor
Maryland Unconventional Intersection Design Analysis Tool
Interstate Operations Study Planning + Simulation
Freeway Capacity and Level of Service
FM 518 By-pass Traffic Review
Development of New Supply Models in Maryland Using Big Data
Ventura County Traffic Model (VCTM) VCTC Update
Problem 5: Interstate 87 Interchange
Technical Committee on Geometric Design
Problem 5: Network Simulation
School of Civil Engineering
Traffic Forecasting with 2016 HCM Methods
An Analytical Modeling Tool for Active Transportation Strategy Evaluation Presented by: Jinghua Xu, Ph.D., PE May 16, 2017.
Tauranga Transport Models (TTM)
Broward County Congestion Assessment
Comparison and Analysis of Big Data for a Regional Freeway Study in Washington State Amanda Deering, DKS Associates.
Presentation transcript:

TRB Planning Applications Conference 2017 Getting the Most out of your data: Applying Passively Collected Travel Demand Management Data to Transportation Planning in El Paso TRB Planning Applications Conference 2017 May 17, 2017

Texas Department of Transportation (TxDOT): Project Team 10/8/2015 Texas Department of Transportation (TxDOT): Project Management: Thelma Ramirez, Gus Sanchez, Rebecca Pinto PE CDM Smith: Project Management: Akila Thamizharasan PE PTOE; Ram Maddali, PE; Transportation Planner/Modeler: Roberto Miquel, AICP; Michael Penic Metropia: VP and Project Manager: Vassilis Papayannoulis, Ph.D.  Advisor: Marybeth Stevens Technical Analysist: Ye Tian Community Manager: Tania Chozet DRAFT

Project Scope: Study Area (El Paso MPO)

Data Analyses: Time of Day Traffic

arterial and Intersection analyses

Data Analyses: Metropia Arterial Analysis SB NB SB NB Loop 375 AM Peak Period (7-9 AM) PM Peak Period (4-6 PM) N Moon Rd Horizon Blvd Alameda Ave This segment of Alameda Avenue is a radial corridor in a partially developed suburban fringe area.

Data Analyses: Metropia Arterial Analysis SB NB SB NB I-10 Interchange AM Peak Period (7-9 AM) PM Peak Period (4-6 PM) N Loop Dr N Zaragoza Rd Zaragoza Road is situated in a nearly fully developed suburban area. SB NB SB NB

Data Analyses: Comparison of HCS and Metropia Arterial Analysis Metropia LOS measurements were compared with analysis results based on Highway Capacity Manual analysis procedures. As indicated in this table, the degree of consistency is generally good. Differences thus indicate situations where HCM analysis inputs may not have been consistent with actual field conditions, or may not be sensitive to actual operational issues that occur in the field.

Data Analyses: Metropia Intersection Analysis DEFINITIONS AND METHODOLOGY APPROACH LENGTH: Distance from nearest upstream traffic signal CONTROL DELAY: Average of difference between congested and free flow travel time of each trip AVERAGE INTERSECTION DELAY: Trip weighted average delay on all intersection approaches. LEVEL OF SERVICE CRITERIA: Highway Capacity Manual Exhibit 18-4 (see below) CONGESTION CRITERIA (LOS F): Based on control delay only (Metropia sample can not measure total demand or capacity)

Data Analyses: Metropia Intersection Analysis

Data Analyses: TxDOT Dashboard update Added Planning Time Index metric TTI represents the level of congestion and is calculated as follows TTI =  (Travel Time)/(Free Flow Travel Time) PTI represents the time a traveler should allow to ensure on-time arrival and it is calculated as follows PTI=(95th-percentile Travel Time)/(Free Flow Travel Time)

Construction zone analyses

Data Analyses: Future Construction Zone Analyses I-10/Hawkins Blvd Ramp Improvements Phase 3 Stage 1 during construction

Data Analyses: Transportation Roadway Systems Analysis Long-Range Planning : Assess the performance of the transportation system in terms of strategies, policies and infrastructure changes consistent with a long- term vision or strategic plan. This type of analysis is best supported by Travel Demand Forecasting Models (TDFM). Detailed Operations : Assess the performance of the transportation system in terms of strategies and infrastructure changes consistent with a plan to enhance operations. This type of analysis is best supported by Micro-simulation models .  Planning for Operations:    Assess the performance of the transportation system in terms of strategies and policies enabled primarily by technology and consistent with a regional collaborative plan to enhance operations. This type of analysis is best supported by Mesoscopic models .

Data Analyses: Multi-Resolution Model Application . Meso Micro Macro Multi-Resolution Models reflect an integrated or linked suite of models that could be used either as a “diagnostic tool”, to identify critical areas, or as an “assessment tool” to evaluate short or long- term strategies, policies or infrastructure changes.

Data Analyses: Future Construction Zone Analyses 728 zones, 3170 nodes, 6727 links. 24 hr time horizon. 2.53M auto trips, 0.33M truck trips. 2013 Network, 2013 Demand. Provided by TTI El Paso office. Network refinement to reflect the change from 2013 to 2017: Added one more lane on I-10 WB Service Rd between Hawkins and Airway (before the off ramp and the on ramp). DUE – Dynamic User Equilibrium These scenarios demonstrate the change in performance of the corridor before and after construction, and performance during the construction phase with the greatest construction impacts.

Data Analyses: Future Construction Zone Analyses DUE – Dynamic User Equilibrium These scenarios demonstrate the change in performance of the corridor before and after construction, and performance during the construction phase with the greatest construction impacts.

Data Analyses: Future Construction Zone Analyses A bottleneck due to work zone Lowest possible speed defined in traffic flow model DUE – Dynamic User Equilibrium These scenarios demonstrate the change in performance of the corridor before and after construction, and performance during the construction phase with the greatest construction impacts.

Data Analyses: Future Construction Zone Analyses Pre vs During Construction Overall reduction in demand in both directions on the I-10 freeway due to construction constraints Reduction in frontage road traffic that occurs due to ramp closures, or the reduction in the number of frontage road lanes, Increase in frontage road traffic downstream of the closed entrance ramps Construction activity has a significant impact on frontage road speeds throughout the daytime hours and into the early night period DUE – Dynamic User Equilibrium These scenarios demonstrate the change in performance of the corridor before and after construction, and performance during the construction phase with the greatest construction impacts.

Data Analyses: Future Construction Zone Analyses Pre vs After Construction Small increases in daily I-10 throughput illustrate the cumulative benefits of traffic patterns that most likely diverted from other routes (the improvements do not involve much freeway mainline capacity) For the WB frontage road, a major reduction in the morning peak period delays is indicated DUE – Dynamic User Equilibrium These scenarios demonstrate the change in performance of the corridor before and after construction, and performance during the construction phase with the greatest construction impacts.

Data Analyses: Implemented Construction Zone Analyses Paisano Closure (June 12, 2016 - Winter 2017) I-10 Mesa Paisano Executive Center Sunland Park Closure on Paisano between just east of Sunland Park and Executive Center. Possible detour route: I-10 and Mesa.

Data Analyses: Implemented Construction Zone Analyses Paisano NB before Closure Origins: Primarily UTEP/downtown Destinations: Primarily Westside 45% from Executive Center 55% from Paisano

Data Analyses: Implemented Construction Zone Analyses Traffic from Paisano NB just South Executive Center Paisano between Executive and Sunland Park is still open to local business after the closure. Travelers on Paisano NB South of Executive Center have to divert to Executive Center and then Mesa for detour. BEFORE CLOSURE AFTER CLOSURE 42% continue on Paisano 58% goes to Executive 4% continue on Paisano 96% goes to Executive/Mesa

Data Analyses: Implemented Construction Zone Analyses Traffic from Executive Center WB Now travelers on Executive Center WB are those who intent to turn left to Paisano SB and then go to downtown area. BEFORE CLOSURE AFTER CLOSURE 90% turn right to Paisano NB 93% turn left to Paisano SB 4% turn left to Paisano SB

Questions/Feedback/Recommendations THANK YOU Thelma Ramirez, TxDOT Project Manager (915) 790-4392 Thelma.Ramirez@txdot.gov Akila Thamizharasan, CDM Smith Project Manager (512) 652-5386 thamimzharasana@cdmsmith.com