NGTA Halton Planning and Public Works Committee

Slides:



Advertisements
Similar presentations
Project Prioritization Framework Principles
Advertisements

Gainesville-Hall MPO 2035 Long Range Transportation Plan Update Public Information Meeting June 29, 2006.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
CHARLENE FITZGERALD APRIL 3, 2012 ROADS AND STREETS Yuma Metropolitan Planning Organization.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
MTF Rail Development Forum
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
1 DESTINATION 2030 Update KRCC TransPol and TransTac Meeting Scoping Results Criteria Alternatives May 22, 2008.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Creating the 2040 Regional Transportation Plan. Today’s Presentation Now Developing the Next RTP  Very Early Stages of Development  Website: 2040Plan.org.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
21 st Annual International EMME Users Conference EMME Users Conference 12 October, 2007 Modelling Needs of Peel Region in the Context of the Emerging.
Draft 2008 Congestion Management Process (CMP) Technical Report Andrew J. Meese COG/TPB Staff TPB Technical Committee June 6, 2008 Item # 8.
1 Perspectives on Collaboration Presentation to Travel Demand Modelling in the GTHA Organizational Structure and Regional Collaboration Systems Analysis.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Colfax Corridor Connections (Denver) & 15/15L Transit Priority Study (RTD) RTD Board - Planning & Development Committee August 6, 2013.
TRANSIT SYSTEMS PLANNING Module 3, Lesson 4. Learning Objectives Define systems planning Understand the steps required for plan selection and the key.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Induced Travel: Definition, Forecasting Process, and A Case Study in the Metropolitan Washington Region A Briefing Paper for the National Capital Region.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Oregon State Rail Plan Update
Chelan County Transportation Element Update
West of England Joint Transport Study
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
A Presentation to: River to Sea TPO Board October 26, 2016.
Downtown Valdosta Truck Traffic Mitigation Study
A Presentation to: River to Sea TPO BPAC November 9, 2016.
Regional Roads Committee
River to Sea TPO - CAC/TCC
Future Construction FasTracks Corridors Federal Funding Analysis
October 12, 2017 Jesse A. Elam.
Technical and Public Advisory Committee Meeting #3
Draft Transportation Element September 6, 2017
“efficient movement of goods across the entire state of Oregon”
Long Range Transportation Planning for the Region of Peel
Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017.
San Mateo Countywide Transportation Plan update
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Fishermans Bend Draft Framework Transport Recommendations
Board Transportation Committee October 13, 2015
Draft OKI Prioritization Process
Transit Systems Planning
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
Chapter 5. The Transportation-Planning Process
Transportation Task Force Mission and Vision
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Transit Integration and Efficiency Study Transit Advisory Committee
Acton Extension Update
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
KEYNOTE STAGE SPONSOR.
Center City Connector Fall Open House Presenter: Ethan Melone,
Parks Highway Reconstruction: Lucas Road to Big Lake Road
What is TSMO? TSMO encompasses a broad set of strategies that aim to optimize the safe, efficient, and reliable use of existing and planned transportation.
Chicago to Council Bluffs-Omaha
Western Orbital: M11 J11 Park and Ride Provision
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

NGTA Halton Planning and Public Works Committee Niagara to GTA Corridor Planning and EA Study – Phase 1 Halton Planning and Public Works Committee July 4, 2012

Study Area

Overview of EA Study Process Individual Environmental Assessment EA Terms of Reference EA Phase 1 Selection of System Alternatives EA Phase 2 Class EA for Design Construction System Planning (e.g. roads, transit, rail, marine, air) Alternative Methods (e.g. route location for new provincial highways / transitways) MOE Review / Approval Alternatives to be pursued by other jurisdictions MOE Review / Approval 1 - 1.5 years 3 - 5 years 2 - 3 years Approx. Timeline 5 - 10years

Study Context The status quo is not an option There will be more than 1.2 million additional passenger and commercial vehicle trips per day in the NGTA study area by 2031 Transit is an important part of the solution, and it is assumed that plans and investment in transit over the next 20 years will result in an additional 700 million transit trips being accommodated in the GTHA by 2031 However, we cannot assume that those coming to the region will travel exclusively by bus or rail Those involved in moving goods agree that while there is a role for every mode, transport by truck is and will remain dominant New highway capacity is required The NGTA study team is conducting a more in-depth exploration of highway expansion options. This will involve: Assessing the relative merits of widening key highways such as Highway 403 and the QEW to determine if this option is preferable to constructing a new highway corridor Considering a wide range of criteria and factor areas — from transportation performance, to natural and cultural environments, to social and community impacts, to agriculture, to costs and the economy

Optimization & Non-Roadway Improvements The innovative ‘building block’ approach looked first at how best to use existing transportation facilities and expand transit/non-roadway infrastructure The draft Strategy is based on full implementation of the RTP by Metrolinx and GO 2020 Strategic Plan, and includes other recommendations such as: Adjustable speed limits (speed harmonization) Transit use of highway shoulders to bypass congestion Reversible (contra-flow) lanes and moveable barriers Hamilton focused inter-regional transit study Initiatives that support freight rail Optimization and non-roadway improvements are a core part of the Strategy, but the focus of the additional analysis will be on the roadway elements

The Three Sub-Areas

West Area Analysis Concern with recommendation to construct a new corridor connecting Highway 403 to the 407 ETR: Assessment of the alternatives has been undertaken at too broad of a level, without adequate quantification of the impacts The primary objective is more focused analysis based on more refined corridors to identify and assess more specific impacts The work will generally involve: Identifying new corridor alternatives connecting to Highway 401, 407 ETR, and other highways (e.g. Highway 6) Development of a conceptual plan for widening existing highways Identification of a preferred new corridor alternative and a preferred widening alternative, followed by evaluation to identify the preferred alternative overall The overall preferred alternative, will form the basis for Phase 2: Individual EA if the preferred alternative is a new corridor Class EA if the preferred alternative involves widening of existing highways

West Area Corridor Alternatives

Central Area Analysis Concern with recommendation to widen the QEW over a new corridor: Insufficient emphasis on the economic “enabler” benefits associated with a new highway corridor A planning horizon of 2031 is not long enough Future freight forecasts are understated A staged process will be undertaken: Stage One: Review 8-lane cross-section recommendation for QEW (6 general purpose + 2 HOV) Confirm residual capacity of this cross-section How far beyond 2031 will this cross-section provide adequate capacity? Consider both commuter peak period and summer congestion in this assessment Stage Two (If Necessary): If residual capacity is anticipated to be exceeded soon after 2031: Additional alternatives will be generated, assessed and evaluated These will include a 10-lane cross-section on QEW as well as new highway corridors

Central Area Corridor Alternatives In the Central Area: A staged approach will be undertaken.  Initially, the residual capacity of an 8 lane cross-section on QEW will be assessed.  If it is determined that the capacity of this cross-section will be exceeded soon after 2031, the Project Team will review other alternatives, including a 10 lane cross-section on QEW and new highway corridors

East Area Analysis The focus will be on identifying a more refined study area for a new provincial transportation corridor in the East Area The work will generally involve: Reviewing Niagara Region’s study for an east-west arterial road to determine relevance to the NGTA study Identifying required improvements to QEW and Highway 406 for each of the corridor alternatives to include within the overall assessment Assessing and evaluating the new corridor alternatives to identify a more refined study area for Phase 2 Ongoing coordination with Niagara Region will be undertaken so that NGTA solutions are consistent with the transportation and land use planning objectives of Niagara Region

East Area Corridor Alternatives

Next Steps Incorporate feedback from consultation on new highway and highway widening options Assessment and evaluation of new highway and highway widening options Present updated Strategy at PIC #5 (Fall 2012) Finalize Strategy (late 2012 / early 2013)