NRC’s Component Design Bases Inspections

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

Patrick Walsh Nine Mile Point – Human Performance HPRTC Conference -June 10 Improving Administrative Procedure Use and Adherence.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
Cumulative Impacts James Slider November 7, 2013.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
Regulatory Issues and Safety Challenges Presentation to CSG Safety Forum Stephen Matheson Chief Inspector January 2009.
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
1 Human Performance in Reactor Safety George E. Apostolakis Massachusetts Institute of Technology Presented at the Quality Colloquium,
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Presented by Dorian Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
NRC Materials Program Cyber Security Organization of Agreement States Annual Meeting August 2015 Adelaide Giantelli Office of Nuclear Material Safety and.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
The Reactor Oversight Process: Development and Results Tom Houghton Nuclear Energy Institute September 20, 2005.
New Reactor Construction Inspection
1 CDBI Inspection Insights for 2008 Kelly Clayton Senior Reactor Inspector Engineering Branch 1 Region IV.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
2006 CMBG Conference BREAKOUT 1: Component Design Basis Inspection Facilitators: Bill Kline/FENOC Sonya Myers/NMC June 11-14, 2006 Richmond, VA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Pilot Component Design Basis Inspection (CDBI) and Equipment Qualification (EQ) Program Inspection Feedback CONFIGURATION MANAGEMENT BENCHMARKING GROUP.
“PREEV” PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION (LTO) 3RD INTERNATIONAL CONFERENCE ON NPP LIFE MANAGEMENT SALT LAKE CITY (USA),
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Diablo Canyon Independent Safety Committee August 10-11, 2016 Fact-finding Report Robert J. Budnitz, Member, with Richard D. McWhorter, Consultant Observe.
Data & Technology Updates April, 2016
DCPP Performance Based on NRC Performance Indicators
Janet R. Schlueter Senior Director, Radiation and Materials Safety
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
Operating Experience - New to Licensee EP
NRC CM Pilot Inspections Methodology and Results
NRC Cyber Security Regulatory Overview
Armenia Training and Tutoring Feedback
Adding Nuclear Power to the Grid
Research and Test Reactor Decommissioning Inspections
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
CDBI Inspection Changes and Insights for 2008
Anna Bradford, Deputy Director Division of New Reactor Licensing
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
Vendor Technical Information
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Inspection Good practice (GP6):
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

NRC’s Component Design Bases Inspections Donald P. Norkin U.S. Nuclear Regulatory Commission June 11-14, 2006 Richmond, VA

History April 29,2004 - SECY 04-0071 - Proposed Pilot 2004/2005 - Temporary Instruction 2515/158 Vermont Yankee V.C. Summer Kewaunee Diablo Canyon May 1, 2005 - SECY 05-0118 - Pilot Results January 2006 - Implement Component Design Bases Inspections

Component Design Bases Inspection (CDBI) 15-20 Risk Significant and Low Design Margin Components 3-5 Relatively High Risk Operator Actions 4-6 Operating Experience Issues Replaces Safety System Design and Performance Capability (SSDPC) Inspection Biennial - All Plants Will Receive CDBI Either in 2006 or 2007 Will Develop Criteria for Determining Scope of Design/Engineering Inspections After 2007

Significant Changes from SSDPC Inspections Components vs. Systems, Which Impacts Licensee Document Retrieval Margin Review for Sample Selection Operating Experience Enhanced Inspection Preparation and Sample Selection Additional Week for Site Inspection Increase Use of Contractors Having Hands-On Design Experience

Staffing Team Leader Two Design Specialists (Typically Mechanical and Electrical Contractors) Two Regional Inspectors (Operations and Engineering) Part Time Support from Senior Reactor Analyst and Resident Inspector for Sample Selection Trainee (If Possible)

Schedule Week 1 On-Site Info Gathering Week 2 In-Office Prep/Sample Selection Week 3 Sample Selection/On-Site Inspection Week 4 In-Office Inspection Week 5 On-Site Inspection Week 6 or 7 On-Site Inspection/Exit Meeting

Insights From Pilot Inspections Pilot CDBIs Had More Findings Per Inspection Hour Than SSDPCs More White Findings Than for SSDPCs Most Findings Involved Original Design, Corrective Actions, and Operating Procedure