MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
F.E.T.S. RFQ Support Structure by Peter Savage 21 ST October 2009.
Robotics – 8. Plates (2-sizes) Plate with holes on 0.500" increments and 1/8" diamonds in between. Can be cut on 0.500" increments. Available in two sizes.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
PASI OsC meeting 12th July 2012
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Monolith design update – Emphasis on Neutron beam extraction design
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Developments of the FETS Ion Source Scott Lawrie.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
ESS Front End diagnostic
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Planning for Proto-DUNE PD Installation and Cabling at CERN
Front End Test Stand (F.E.T.S.)
“CENTRAL SUPPORT FRAME” -
Update on Pavia MM mechanical prototype
By: Shawn Berkeybile, Dave Martin, Zach Palamara, John Sopczynski
BSS Prep work at CERN and Acceptance of Parts
LEP cryostat Procurement strategy and plans
Development of a low material endplate for LP1 and ILD
MICE Partial Return Yoke Mechanical Design
Status of the Front End Test Stand April 2007.
Optimisation of the FETS RFQ
IHEP Cryomodule Status
RFQ Cold Model End Flange Cone and Finger Conceptual Design
Cryomodule Assembly Plan
Mechanical Engineering progress for the Front End Test Stand
as a prototype for Super c-tau factory
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Technical Updates Gábor László NSS Lead Instrument Engineer
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

F.E.T.S. Mechanical Engineering Update by J. Pozimski On behalf of P. Savage 26th September 2007

Activities: 1) RFQ cold model end flange inserts 2) Laserwire beam profile measurement tank 3) FETS support stands 4) LEBT

R.F.Q. cold model end flange inserts have been delivered GUIDE CONE HUB SPACER FINGER HUB FINGERS

Activities: 1) RFQ cold model end flange inserts 2) Laserwire beam profile measurement tank 3) FETS support stands 4) LEBT

Design concept of the laserwire beam profile measurement tank Faraday cup Solenoid

The problem relating to the supply of ALIO stages appears to have been resolved. David has tested the lower force motor fitted with a counterbalance and mounted vertically and the result is satisfactory. This allows us to standardise on the motors used and reduces space occupied by the motors (in the all important Z direction). Conclusion: the engineering design of the tank can now continue. Plan is to have the outer stainless steel vessel manufactured by a specialist company and to have the internals (i.e. motor mounting chassis and post-acceleration system) made in-house.

Activities: 1) RFQ cold model end flange inserts 2) Laserwire beam profile measurement tank 3) FETS support stands 4) LEBT

The FETS support stands main parameters Beam Floor to centre of beam = 1650mm Rail diameter = 50mm Rail spacing = 800mm Floor to centre of rail = 800mm NOTE: Floor to beam centre has been changed and is now 1600mm

The FETS support stands vee blocks Corner vee block – 4 per stand Mid vee block – where needed Due for delivery on September 10th.

Support stand rail vee blocks have been delivered

… and the vee block components assembled They have now be dismantled and sent out for zinc plating

Activities: 1) RFQ cold model end flange inserts 2) Laserwire beam profile measurement tank 3) FETS support stands 4) LEBT

A conceptual design for the LEBT mounting system is shown opposite A conceptual design for the LEBT mounting system is shown opposite. The design uses one frame, mounted to the rail system of the main support benches. Upon the LEBT mounting frame the individual solenoids sit on 3 screw jacks which in turn sit on a vee + flat rail system. The solenoids are individually aligned. Shown are drift spaces of 10, 35 and 10cm respectively. The 35cm drift space has a vessel fitted with a Oerlikon MAG W2200 pump.

Future plan: Define future engineering requirements, divide work with extra manpower. Finalise beam profile measurement tank design, produce engineering drawings and send for quotes. Submit for manufacture. Test prototype support stand rail system and either modify or instruct manufacture of remainder. Check structural integrity of LEBT mounting system and finalise design, engineering drawings and send for manufacture ready for arrival of solenoids. Begin design studies for 4m RFQ.