BSS Prep work at CERN and Acceptance of Parts

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Councillor Egli Ward 9 Knoxdale- Merivale June 5, 2014.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Muon g-2 Installation Schedule All Experimenters Meeting June 16, 2014 Aria Soha Muon g-2 I&I Manager.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
Jack Fowler Spain Workshop 2003 Faraday Shielding for Barrel TRT Jack Fowler Duke University Spain Workshop
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
PASI OsC meeting 12th July 2012
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
Robotics Motion Functions Alec Robertson – Department DMF – Confidential WonderWyler.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
ELENA installation progress F. Butin / ELENA collaboration.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Planning for Proto-DUNE PD Installation and Cabling at CERN
UNIT-II TURNING MACHINES
Wire Quality Jack Fowler.
Guide Right™ Surgical Guide System
Roadmap for triplet cryostats
new straw end plug: D=10.6 mm straws support frame Levan option
F.E.T.S. Mechanical Engineering Update
Step IV PRY Preparation - Contents
Summary of Fuse Testing for Barrel Module Fuse Boxes
LHC Experimental Vacuum Systems Status October ‘07
SCHEDULE Nov 1st - Assembly Table Complete
G. Carboni for the Muon Group
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
EHN1 Neutrino Installation Plans
Support Structure Fabrication
Far Detector Activities Late 2017 – Early 2018
Summary of Fuse Testing for Barrel Module Fuse Boxes
Status Brussels GANTRY
Status of the PANDA Solenoid Magnet Production in BINP
LARP Phase II Secondary Collimator RC1
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
LARP Phase II Secondary Collimator RC-0 and RC-1
CNGS horn / reflector in 2005: The story of the glass ring insulator
LARP Phase II Secondary Collimator RC-0 and RC-1
Science Fair Timeline 2016.
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Polarized 3He target installation
Presentation transcript:

BSS Prep work at CERN and Acceptance of Parts Jack Fowler Duke University Spain Workshop - 2003

Assembly Rig Design and Build Receive frame and rails Assemble and pre align Survey in Bldg 154 Use to QA inner cylinder and 1st space frame

Receiving Assembly Rig Assembly rig was design and procurred from RAL Most of the assembly was received in July at CERN

After a few small problems…

Pre alignment in 154 In Aug and Sept the pre alignment was performed in 154 The rails and center axis did not arrive until late Sept. The pre alignment was completed last week. Survey is occurring this week

Mounting of rails The rails consist of a 3 piece Al angle And a Stainless Steel angle that has been chrome plated. This will be the main contact surface

Summary of Assembly Rig Assembly Rig will be ready in 154 in mid Oct for acceptance tests for IC and 1st space frame After acceptance tests the Assembly rig will be moved to SR 1 and realigned. The assembly rig will be available and ready for final assembly of spool in Dec 2003 in SR 1

Inner Cylinder Receive Cylinder Ready the cylinder for measurement Mfg tooling for measurement Perform QA of Cylinder Apply shielding material

Mounting Flanges A center hub will be machined along with three mounting bars Also threaded holes need to be added around the face of the circumference for the diameter adjustment

Inner Cylinder Status Delivery to Cern late Oct 2003 Tooling for mounting to be complete Oct 15 Hand tooling for some measurements to be complete in Oct Need to schedule CERN survey group as soon as delivery date is known

Space Frames Receive 1st end frame Ready for measurement Mfg tooling for QA Perform QA Apply shielding material Receive 2nd end frame Repeat above

Space Frame Status Delivery of 1st space frame early Nov 2003 Discussions with CERN Survey group completed in June and July Tooling for QA and survey to be completed in Oct CERN survey will be scheduled for mid Nov

Assembly of Spool Receive and Approve IC and Space frames Relocate Rig to SR 1 and align Dry mount on Assembly Rig Alignment Check, Survey and Adjust Fasten IC to Space Frames Connect Faraday Shielding Bond IC to Space Frames

Spool Status Schedule revolves around delivery of 2nd space frame. Currently early Dec 2003 Spool will be ready in SR 1 ~ 6 weeks (holidays?) after delivery of 2nd space frame