Maintenance Error Results in Bypassing Enclosure Electrical Lock Out Tag Out John E. Anderson Jr. Energy Facility Contractors Group Electrical Safety.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

Accident and Incident Investigation
Basic safety rules and procedures for controlling hazardous energy
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
De-energization and Lockout
Lockout/Tagout for Injection Molding
A Presentation of the SPI-OSHA Alliance
Construction Training
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
Controlling Hazardous Energy
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Danger Tags and Locks Picture of the Week Collider-Accelerator Department Take 5 for Safety.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation “Imagine yourself performing maintenance inside of a machine and suddenly,
Lockout/Tagout for Extrusion
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Evolution Industries Jan A Lockout/Tagout (LOTO) program ensures that energized equipment or machines are not started or used while they are being.
NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.
A Presentation by Vincent & Vincent Companies
LOCKOUT/TAGOUT ENERGY CONTROL PROGRAM
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Lockout/Tagout for Affected Employees Understand the Basics.
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Safety on Call LOCKOUT / TAGOUT. Safety on Call WHAT IS LOCKOUT/TAGOUT? A method of keeping equipment from being set in motion and endangering workers.
Peoplefirst-us.com. Photos shown in this presentation may depict situations that are not in compliance with applicable OSHA/MSHA/FHWA requirements.
XpsOES : A New Tool for Improving Safety at Workplace Yasar Kucukefe, Ph.D., National Power Energy.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Lockout/tagout (LOTO) is a technique used to prevent energy from being released during the servicing of equipment. This is accomplished by placing locks.
Health & Hygiene/ELB Sample LOCKOUT/TAGOUT “APPROVED” TRAINING.
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
Basic Lockout Guidelines
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Electrical Events Involving Look-Alike Equipment within the DOE Complex.
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
29 CFR  In this course, we will cover the following:  The need for energy control procedures  Methods of lockout / tagout  Employer’s responsibilities.
Lockout/tagout for authorized employee
Lockout Tagout Program
Accident Analysis 1.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
Lock Out Tag Out (LOTO).
LOCKOUT/TAGOUT/VERIFY
Lock Out / Tag Out The Control of Hazardous Energy
The Control of Hazardous Energy (Lockout-Tagout)
Lock Out & Tag Out.
Lockout/Tagout/Verify Awareness
Energy Control (Lockout/Tagout)
Energy Control Procedures Lockout/Tagout 29 CFR
Review of Electrical Safety 2015
Control of Hazardous Energy Lockout/Tagout 29 CFR
Lock out / Tag out Regulations (Standards - 29 CFR)
UK TECHNICAL SOLUTIONS INTERNATIONAL
The Control of Hazardous Energy (Lockout-Tagout)
Personal Protective Equipment
LOTO(V) Procedures MESH Process Safety, 8.7 Energy Control
Workshop on Accelerator Operations
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Control of Hazardous Energy
Presented by Environmental Health and Safety
Lockout/tagout Refresher Training
Always isolate equipment before beginning maintenance tasks
Presentation transcript:

Maintenance Error Results in Bypassing Enclosure Electrical Lock Out Tag Out John E. Anderson Jr. Energy Facility Contractors Group Electrical Safety Workshop 2016 19 May 2016

Outline Fermilab Overview MI-65 LOTO Incident Accelerator Complex MI-65 LOTO Incident Incident End Results Sequence of Events Incident Analysis Single Line Electrical Diagram HPI Error Precursors Causal Factors Lessons Learned Recommendations Contact Information John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Fermilab Overview Fermi National Accelerator Laboratory (Fermilab) America’s premier laboratory for particle physics and accelerator research Single purpose laboratory Funded by the US Department of Energy 2,150 employees 2,000 visiting researchers and graduate students Site is 6800-acres or 28 km2 Diverse work force with varying cultural backgrounds John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Accelerator Complex MI-65 Service Building John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

MI-65 Lock Out Tag Out Incident Start with the end first No personnel were injured No equipment was damaged Defense In Depth Electrical Safety Barriers Beamline enclosure electrical safety was reduced to one barrier Enclosure Electrical Safety System Essentially a “Free” event that we can learn from John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

MI-65 Lock Out Tag Out Incident Sequence of events On 29 September 2015 at approximately 1:00 PM, an electronic technician was preparing power supplies in the MI-65 Service Building for NuMI beamline startup As the front panel power switches were being turned on, the technician noticed the input power meters on the power supplies move from 0 VAC to reading 480 VAC Power should not have been available as the upstream switchboard was believed to still be under Lock Out Tag Out (LOTO) The technician confirmed with his supervisor and Main Control Room that the beamline was still locked out The technician turned the power supply power switches to off John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

MI-65 Lock Out Tag Out Incident The supervisor locked out the load side circuit breakers in the upstream panel board The Operations Department Head and Division Safety Officer were notified Initial investigation revealed that the 13.8 kV motorized disconnect switch used to feed a 13.8 kV to 480 VAC transformer was in the energized position Records from accelerator operations indicate that the 13.8 kV disconnect switch was Locked and Tagged off at approximately 1:30 AM on Saturday July 4, 2015. Roughly three months earlier Facility Engineering Services Section high voltage electricians were contacted to open the four bay switch that feeds 13.8 kV to the motorized disconnect switch John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

MI-65 Lock Out Tag Out Incident The Division Safety Officer Locked Out the four bay switch restoring the LOTO for the enclosure Electrical Safety Barriers The beamline enclosure electrical safety interlocks were disabled The only barrier that kept the power supplies from being turned on and delivering power to the enclosure magnetic elements John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Electrical Diagram John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Incident Analysis Reviewed the MI-65 written LOTO procedure NuMI beamline is unique in the way it is locked out To improve electrical safety to workers, a 13.8 kV motorized disconnect was installed to disable power to the enclosure Allowed for remote switch operation Moved employees outside of the Arc Flash zone during disconnect switch operation Identified that if procedure is executed in the wrong order, it is possible to lock the switch in the on position Would also require missing two separate verification steps Reviewed LOTO procedure with the operator that performed the lockout on July 4th Operator was confident she performed the lockout correctly John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Incident Analysis Reviewed Facilities Engineering maintenance records Maintenance was performed on the switch on July 22, 2015 Maintenance procedures indicate the switch chain drive is to be lubricated and the switch cycled The electrician who performed the maintenance stated he used the manual drive to cycle the switch Two most likely causes for this event were either Improperly performed LOTO procedure A change in the position of the motorized switch during maintenance A search through accelerator data logs identified a small milliampere-level offset in one of the power supplies when the ac input voltage was available John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Incident Analysis July 4th LOTO July 22nd Maintenance July 29th Discovery John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Root Cause Lockout device not applied to the motorized disconnect Rather the lockout device was applied to the power to the motorized drive Manual drive was able to be accessed during maintenance John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

HPI Error Precursors Unfamiliarity with task / first time Development of a written LOTO procedure for remotely operated high voltage equipment had not been previously done Interpretation requirements The use of the motorized switch as an energy isolating device was not communicated to the Facility Engineering Section The maintenance procedure did not address returning the switch to the position in which is found at the start maintenance Confusing procedure / vague guidance The need for the motorized switch to potentially remain in the open (off) position after servicing because of its use as an energy isolating device was not part of its maintenance procedure John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

HPI Error Precursors Confusing displays / controls The motorized switch was not marked as an energy isolating device by either permanent labeling or a tagout device Lack of alternative indication The written LOTO procedure did not account for maintenance of the motorized switch that could bypass the energy isolation for the power supplies and beamline components The development or review of the procedure did not involve the Facilities Engineering Services Section that would perform the maintenance of the motorized switch John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

HPI Error Precursors Habit patterns Mindset (“tuned” to see) The maintenance procedure did not have a check point to identify the found position of the motorized switch The position of the switches shown on single-line electrical diagrams were used to determine in which position switches should be left Due to the impact of outages on most laboratory facilities, the switches serving facilities are normally placed in the closed (on) position so that the time spent in outages is minimized Mindset (“tuned” to see) Preparation of the written LOTO procedure by Accelerator Division personnel did not account for maintenance work performed by the Facilities Engineering Section John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Causal Factors A1: Design / Engineering Problem A1B1C03: Design input not correct The LOTO procedure development did not take into account OSHA 1910.147(a)(3)(i) “… affixing appropriate lockout devices or tagout devices to energy isolating devices …” The LOTO procedure development did not consider the capability to operate the switch manually The LOTO procedure development did not include representation from the group (Facilities Engineering Services Section) that would perform maintenance on the motorized switch John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Causal Factors A2: Equipment / Material Problem A1B2C01: Design output scope LTA The LOTO procedure design did not take into account maintenance, that if performed incorrectly on the disconnect switch, could bypass the beamline LOTO The LOTO procedure writer failed to recognize that the switch could be operated manually A2: Equipment / Material Problem A2B4C07: Marking / labeling LTA Motorized switch was not labeled or controlled as a beamline LOTO point as required in OSHA 1910.147(a)(3)(i) John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Causal Factors A3: Human Performance Less Than Adequate (LTA) None The work as executed by the Accelerator Operator and Facility Engineering Services Section Electrician was in full compliance with the instructions they were provided As an organization, we set the employees up to fail! A4 Management Problem A4B5C04: Risks / consequences associated with change not adequately reviewed / assessed. The change in 2007 from the transfer switch to the motorized switch did not identify the loss of the LOTO point on the energy isolation device as a risk Original construction transfer switch was never used for LOTO John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Causal Factors A5 Communications Less Than Adequate (LTA) A5B1C03: Checklist LTA The maintenance procedure did not have a check point to identify the as found position of the switch Or a check point to verify the disconnect switch was returned to the as found position A5B2C07: Facts wrong / requirements not correct The maintenance procedure did not identify the motorized switch as an energy isolation device for beamline LOTO A5B2C08: Incomplete / situation not covered Maintenance procedure stated to cycle the disconnect switch, however it did not address returning the disconnect switch to the original position John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Lessons Learned Well-intentioned relocation of motorized switch controls created situation which application of LOTO was not readily apparent The written LOTO procedure failed to notify maintenance personnel that the switch was used as a beam line energy isolating device The lack of a lock and tag at the disconnect switch does not conform to the LOTO requirements in OSHA 1910.147(a)(3)(i) John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Recommendations Revise the written LOTO procedure for the MI-65 beamline power supplies to conform with OSHA 1910.147(a)(3)(i) Revise Fermilab policies and training materials to instruct Knowledgeable Employees to include representatives from all laboratory groups that will operate and maintain LOTO energy isolating devices in the development and review of written LOTO procedures John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Recommendations Revise Fermilab policies and training materials to identify remotely operated electrical switches that are likely to be used as LOTO energy isolating devices are places where particular attention must be given to incorporating LOTO provisions in design, specification, and construction John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Switch Labeling and Lock Out John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Groups Involved in NuMI LOTO Accelerator Division External Beams Department Overall responsibility for the beamline, reviewed LOTO procedure Accelerator Division Electrical Engineering Support Department Specified disconnect switch, built switch controls, developed draft LOTO procedure, was not a reviewer of the final LOTO procedure Accelerator Division ES&H Department Editor of LOTO procedure, reviewer of LOTO procedure Accelerator Division Operations Department Performs the LOTO activities, reviewer of LOTO procedure Facilities Engineering Services Section Performs maintenance on the disconnect switch, not a reviewer of the LOTO procedure John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Questions? John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016

Contact Information John E. Anderson Jr.  Associate Head, Office of the Chief Safety Officer   Environment, Safety, Health, and Quality Section Radiation Physics Engineering Fermi National Accelerator Laboratory P.O. Box 500 MS 371 Batavia, IL 60510 USA 630 840 4973 office www.fnal.gov jea@fnal.gov John E. Anderson Jr. | EFCOG Electrical Safety Workshop 18-22 July 2016