DCPP Curtailment Guidelines

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Guidelines for Good Practice on Information Management and Transparency EuroPEX Comments and Suggestions Brussels, 6 th of July 2006.
IMO Perspective on Reliability A presentation to the IEEE Toronto Section Forum on Reliable Power Grids in Canada by Dan Rochester, Section Head - Assessments.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Energy Markets 201 Tribal Solar Working Group April 30, 2015.
California Energy Commission Workshop Nuclear Power Plant Issues
The Continuing Evolution of U.S. Electricity Markets
U.S. Energy Information Administration Independent Statistics & Analysis EIA Reporting Proposal: Balancing Authority Hourly Operating Information.
MIDWEST ENERGY OUTLOOK THE ROLE OF COMPETITIVE POWER SUPPLIERS ENERGY MARKETS IN TURMOIL May 17, 2001 Freddi L. Greenberg.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Integrated Planning & Environmental Affairs Energy Agencies in California.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
California ISO – Internal Use Only Flexible Capacity Requirement CPUC RA Workshop March 30, 2012 Mark Rothleder Executive Director Market Analysis and.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Managing Reliability and the Markets with PI
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Illinois Wholesale Market Update December 10, 2003.
Monterey Plaza Hotel October 8-10, 2007
An Overview of Demand Response in California July 2011.
How Markets Fared this Summer and What to Expect in 2007 IEP 25 th Annual Meeting October 9, 2006 Steve McClary MRW & Associates, Inc. Oakland, California.
Extra electricity slides
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Prepared by California Department of Water Resources May 31, 2001
Overview Market Opportunities Market Challenges
Electricity and Renewables
LNBA Subgroup: Avoided Transmission Value
Modeling DER in Transmission Planning CAISO Experience
A Webinar to Present: Coordination of Transmission and Distribution Operations in A High Distributed Energy Resource Electric Grid Featuring: Lorenzo Kristov,
Transmission-Distribution Interface Working Group Meeting
Wind Management at MISO
Overview of the NYISO Demand Response Programs
Asia-Pacific Energy Regulatory Forum
SEIA Perspective on Marginal/Avoided CAISO Transmission Costs
Energy Day Strawman Proposal
Regional Transmission Organizations
North American Markets Status
Grid Integration of Intermittent Resources
Integrating Distributed Energy Resource into Grid Operations
ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer
International Conference
The Future of Demand Response in New England
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.
Michael I. Henderson ISO New England Inc.
Electricity Restructuring and Deregulation
Gas-Electric Coordination Can New Services Bridge the Divide?
Creating a Clean, Unbreakable Grid
PacifiCorp-CAISO-NVE EIM Initiative Overview
Context: Scenario Studies
Context: Scenario Studies
Forecasting and Operations CAISO Case
DECISION
How the Missouri River is Operated - WAPA’s Role - Mid-West Electric Consumer Association Annual Meeting December 11, 2018 | Denver, CO Lori L. Frisk VP,
MAC Report Gas-Electric Interface Study
Jim Mcintosh Director, Executive Operations Advisor California ISO
The Future Grid and Energy Storage
The Seller’s Webinar will begin promptly at 1:03
Presentation transcript:

DCPP Curtailment Guidelines Ken Johnston Director, Operations Services PG&E October 20, 2016 I

2016 Summer Loads and Resources Subhead title to go here and here. Subhead to go here and here and here. • Lorum ipsum dias en sanctus en monterium et tus monte rium. • Lori ipsum dias en sanctus en monterium et tus monterium. • Dias en sanctus en monterium et tus monterium en sanctus monterium. • Dias en sanctus en monterium tus monterium en sanctus. Subhead to go here and here and here. • Lorum ipsum dias en sanctus enmonterium et tus monte interiumonterium en sanctus. 2

Role of Cal ISO The California Independent System Operator (CAISO) provides open and non-discriminatory access to the bulk of the state’s wholesale transmission grid, supported by a competitive energy market and comprehensive infrastructure planning efforts. 3

Emergency Curtailment Emergency curtailment orders may be issued due to grid stability concerns Can be required to curtail by ISO Specific criteria for requesting emergency curtailments and for DCPP’s response to such a request are included in confidential sections of DCPP Operation Policy Confidentiality is due to market sensitive nature of information. 4

Non - Emergency Curtailment PG&E’s Short Term Electric Supply’s (STES) mission is to procure and schedule electricity to meet PG&E retail load in a least cost fashion STES forecasts PG&E retail load and schedules generation and load to CAISO in the day ahead and hour ahead markets. STES monitors system load and generation continuously, and acts as PG&E’s single point contact for generation related coordination. STES bids DCPP as base load (i.e. both units operating at full capacity) unless there is a scheduled outage or curtailment. 5

Over - Generation Curtailment Over - Generation Curtailment Agreement Although DCPP has an over generation curtailment agreement with STES, neither the ISO or STES has ever requested that it be exercised. Limitations of the Curtailment Agreement Curtailment would be for a limited amount of MWe. Curtailment duration would be limited to small fraction of the year. Sufficient notice would be provided to allow for safe execution of a normal power ramp. 6

Thank you Ken Johnston KEJ5@pge.com 7