Work Breakdown Structure

Slides:



Advertisements
Similar presentations
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
Advertisements

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Work Breakdown Structures (WBS) Current: 14 January 2015.
Fundamentals of Information Systems, Second Edition
Inspiring Your Next Success! ® Company Confidential - Copyright 2008 Hitachi Consulting 1 Work Plan Development Or answering the question: “So... what.
Project Management Session 7
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
Development plan and quality plan for your Project
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Goal and Scope Where are we going and what path will we be taking?
Work breakdown structure
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Week 6: Project Management E1102 – Design Fundamental Using Advanced Computer Technologies Spring 2010.
Work Breakdown Structure (WBS) Development
Project Life Cycle.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Creating a Work Breakdown Structure with Microsoft Project.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Breakdown Work Structure Applying Management Tools to a Project.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson PowerPoint Presentation by Charlie Cook The University of West Alabama Defining the Project Chapter.
Project Management 6e..
Project Scope Management
A Brief intro to Project Management What can it do for you
HCIS 410 AID Experience Tradition /hcis410aid.com
Chapter 11 Project Management.
Lesson Point of Contact: Name: John Rice Phone: Slide 1
Work Breakdown Structure (WBS)
Project Management 6e..
Project Planning: Scope and the Work Breakdown Structure
IF 3507 Manajemen Proyek Perangkat Lunak
By Wilmer Arellano Spring 2010
Project Management Chapter 3.
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 4 Defining the Project.
Work Breakdown Structures (WBS)
WORK BREAKDOWN STRUCTURE
Concepts and Definitions Work Breakdown Structures
Software Planning Guidelines
Work Breakdown Structure and Activity List Workshops
Project Management 3. Project Management Plans
Project Management and Information Security
Defining the Activities
Where We Are Now. Where We Are Now Defining the Project (100) Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating.
Work Breakdown Structure
Project Theory and Application
MGT 605: CH 04 Defining the Project.
CIS12-3 IT Project Management
Project Scope / Time / Cost
Project Management Process Groups
Work Breakdown Structure
Team Project Review the background information and project teams on our course site Work with the engineers (4-5) and your PM team member(s) You have.
Project Management Chapter 11.
Work Breakdown Structure and Activity List Workshops
Project Management Life Cycle
Effective Project Management: Traditional, Agile, Extreme
Identifying the Work to Be Done
PLANNING & SCHEDULING (First Part)
Chapter 3 Managing the Information Systems Project
Defining the Project Tasks, Cost and Schedule
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

Work Breakdown Structure Pantelis Ipsilandis- Dimitrios Tselios

Work Breakdown Structure (WBS) Definition: A deliverable-oriented grouping of project elements that organizes and defines the total scope of the project work. Work not in the WBS is not in scope of the project. Each descending level represents an increasingly detailed description of the project elements. Often used to develop or confirm a common understanding of project scope.

Breaking Down the work Top-Down approach Bottom-Top approach Enter deliverables first and then determine all the tasks needed to accomplish them Experienced project managers Bottom-Top approach Brainstorm about all the tasks and then group them under deliverables Novice project managers Two opposite approaches could lead to the same result Top-Down Bottom Up

What does a WBS look like? Hierarchy Diagram Format Table of Contents Format List Format

From WBS-Chart to WBS-List WBS-chart is converted to an indented list of tasks Building Block Relocation 1. Requirements 1.1 Research Staff Requirements 1.2 Summarize requirements 1.3 Report delivered 2. Location 2.1 ………. Summary Task (Deliverable) Detail Tasks (Duration Estimates) Milestone

WBS – The right level of detail Too little detail Can I estimate duration, effort and cost? Can I find dependencies between tasks? Can I assign the task to somebody? Too much detail Is this task necessary in the WBS? Is the task merely a reminder or a to-do list item or a real task requiring effort? Do I want to update all these detail tasks during project execution? The 1%-10% rule Duration of task between 1-10% of total project duration Task not longer than a reporting period Why is the right level of detail important? Status reportCorrective action  Results achieved  Results visible in status report

WBS Levels Level 1 Level 2 Level 3 Entire System Program Element, Project or Subprogram Level 2 Major Elements of the System Top Level Aggregations of Services or Data Level 3 Subordinate Items to Level 2 Elements Generally Common Across Similar Programs The work breakdown structure can be expanded down to lower levels of detail. However, the top three levels are as far as any program or contract need go unless the items identified are high cost or high risk. Then and only then is it important to take the work breakdown structure to a lower level of definition. The top three levels of the work breakdown structure are defined as follows: Level 1: Level 1 is the entire system. For example, an electronic system refers to an electronics capability such as a command and control system, radar system, communications system, information system, sensor system, etc. Level 1 is usually directly identified as a program or sub-element of a program. Level 2: Level 2 elements are major elements of the system. For example, the prime mission product which includes all hardware and software elements, aggregations of system level services (e.g., system test and evaluation, and system engineering/program management) and of data. Level 3: Level 3 elements are elements subordinate to level 2 major elements. For example, radar data processor, signal processor, antenna, type of service (e.g., development test and evaluation, contractor technical support, training services), or type of data (e.g., technical publications). Lower levels follow the same process.

WBS Diagram Project Deliverable 1.0 Deliverable 2.0 Deliverable 3.0 Work Package 1.1 Work Package 2.1 Work Package 3.1 Work Package 1.2 Work Package 2.2 Work Package 3.2 Work Package 1.3 Work Package 2.3 Work Package 3.3 Work Package 2.4

Risk and Contingency Plans Benefits of the WBS Risk and Contingency Plans Estimates Schedule WBS Risk Control Project Control Change Control Communication Control Activity List Progress Reports Project Plan

WBS – IT Tools MS Project does not have a WBS view but there are other solutions! - WBS chart (www.CriticalTools.com) - Project+ (www.iil.com)

WBS – IT Tools Importing WBS in MS Project!

Examples – Product Based WBS Source Effective WBS, Gregory T. Haugman, 2002

Examples – Process Based WBS Source Effective WBS, Gregory T. Haugman, 2002

WBS – Other categorizations Components of the product or service to be delivered. Subsystems Projects Process Phases Time Phases Geographic Areas Organizational Units

Closing The greatest benefit of developing a work breakdown structure is providing a common understanding of all the work required to deliver the product or service.