East Hall under construction

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Management’s preliminary comments to the ERC Report.
1 TenStep Project Management Process ™ PM00.3 PM00.3 Project Management Preparation for Success * Manage the Workplan *
SE 555 Software Requirements & Specification Beyond Requirements Based on Weigers Chapter17.
Time and Cost Estimation
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
1 1. Some recent views ( ) 2 Linac tunnel
Introducing Project Management Update December 2011.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Rob Connatser NSS Instrument Work Packages and XLPM.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
ELENA installation progress F. Butin / ELENA collaboration.
East Hall under construction
SCT Project Management Issues
News and Introduction from CERN June 15th, 2005
East Area Renovation Project Team meeting # 2 – EDMS News
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Status of the MICE Construction Project
Francois and Lau EATM 17 July 2012
CSP 25th November 2010 Technical agreement number 3: overview
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Software Project Management
Injector De-cabling Project
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
LIU – EVM status and next steps
AD consolidation activities in LS2
EC Activities Status for the LIU
ACTIVITY PLANNING AND RISK MANAGEMENT
4th FRC meeting, Antti Onnela, CERN-PH-DT
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
(Additional materials)
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
Updating Capital Asset Records
East Hall under construction
Preparations for a Lehman Review
Here are some top tips to help you bake responsible data into your project design:.
Making Labour Decisions
Project - Execution stage
Experimental Areas – LS2 planning
AICT5 – eProject Project Planning for ICT
Preliminary Project Execution Plan
North Area Safety Review 2019
East Hall under construction
East Area Renovation Supply of control rooms b.157
Detector Proto-Technical board Sep 30, 2010
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Information system analysis and design
Presentation transcript:

East Hall under construction - 1962 East Area Renovation Project Cost and Schedule review – Preliminary Conclusions R. Steerenberg, C. Rembser, H. Wilkens, L. Serio, L. Scibile, S. Prodon, J.P. Tock Many thanks to S. Evrard

Many Thanks… First of all many thanks to all speakers that provided an overview of the different parts of the project and the related cost and schedule aspects Thanks to all the participants for their availability and fruitful discussions, which were very valuable for our discussions Last but surely not least thank to the organizers of the review We are convinced that preparing the review was already beneficial for the project S.Evrard, 17-11-2016 IEFC

In General The project is still young and many work was done and progress was made. The WBS at the higher levels is clear, but in some places the details are not yet clear, which will make monitoring difficult They are known by the groups but should become clear to the project management The review committee is positive on the fact that the project has taken 6-7% in the central budget to be able to balance the scope of the different WPs. S.Evrard, 17-11-2016 IEFC

In General The highest priority is to get a frozen layout and apertures. Magnets and power converters can be decided upon. This is an iterative process that can take time. March 2017 the technical specifications should be clear For the aperture decision losses and activation should be considered Prioritise all activities that are beyond the baseline such that a staging approach can be applied, with clear milestones for the decisions Some risk analysis were made, but there is no cost attached to them. Complete the risk analysis for the baseline activities. Since the first estimate additional items had to be added. Are we sure that no more needs to be added ? All groups were contacted for input. S.Evrard, 17-11-2016 IEFC

In General B263 will become idle, is an other project in search of building surface than can then be saved (partly) on an other project Part of B251 will also be available. Clarify the missing resources issue For some the financing is clear but the availability not yet S.Evrard, 17-11-2016 IEFC

Magnets The baseline for the magnets (reuse present dipoles) is actually no option for EPC . It does not fit their foreseen (standard) power converters The option to rebuild the magnets and re-use the coils is also no real option Also not good for the power converter side Not desired by the magnets to reuse ‘old’ coils The budget is 2.6 MCHF and the ‘performance’ option is now 3.25 MCHF 600 kCHF is presently missing and this is a high priority activity on the critical path The project has to go for the extra cost and in a later stage see if this money can be recuperate on other lower priority parts (EPC, B251, ….) S.Evrard, 17-11-2016 IEFC

Civil Engineering The B157 is fully covered financially, but the 400 kCHF overrun is due to the renovation of Building 251 (power converters) The false floor (structure might be recuperate and this money could be saved) The 251 envelope (not mandatory yet, especially as the power converter dissipation will be lower) Somebody should study if with the present building they can maintain the present building and make this renovation a lower priority The essential parts for B251 are costed in other budgets Demin, light,..) Perhaps Make a separate work package for the 251 building. include all related activities This will give a clear picture of the total cost for B251 allow prioritisation At least make a full analysis of the cost and get the details For CE there is no contingency anymore in the planning until the FC of December 2017  Critical path S.Evrard, 17-11-2016 IEFC

Beam stoppers The scope is not clear yet Functional spec of beam stoppers should be established Input from RP and safety units required. Cost higher than budget  to be detailed and clarified S.Evrard, 17-11-2016 IEFC

EN-EL The DC cabling campaign in 2nd half of 2020 relies on the extra 2 FTE.y If the 2 FTE.y are not available then the activity should move outside the LS2 EN-EL resources are fully committed in LS2, hence all resources allocated The resources should be ensured as this is a major risk for delay of the project EN-EA has taken a part of the work, but the budget was not reduced Clarify the change of scope and share the budget accordingly S.Evrard, 17-11-2016 IEFC

CV Additional required resource identified, but if these do not materialise then the risk of schedule delay is big Make risk analysis Details still to be clarified hence cost to be refined. Input needed form different groups/WPs S.Evrard, 17-11-2016 IEFC

Scheduling The review committee is pleased to see that the project planning is made in collaboration with EN/ACE, taking into account the big picture of LS2. The running of CLOUD under the present schedule is possible. For the last run the schedule was accommodated. The project should consider the option to use the period foreseen to complete the project in case delays were accumulated. Machine related LS2 activities have priority above the East Area project. This increases the risk on the schedule and possibly cost The reviewers recommend to add: Milestones to the panning Show the critical path activities Show dependencies S.Evrard, 17-11-2016 IEFC

Cost over run Not yet a clear picture to be able to prioritise the WBS and associate risks The asbestos removal has a important cost overrun Safety systems S.Evrard, 17-11-2016 IEFC

Final conclusions to come…... Many thanks to all Final conclusions to come…... S.Evrard, 17-11-2016 IEFC

Thanks for your contribution!