Task 10.3 : 5T HTS Dipole Magnet Design and Construction

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

HFM coll. meeting, Febr , G. de Rijk, Task 4 1 Task 4: Very high field dipole insert Gijs de Rijk (CERN) 24 th February 2009.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Structural design of EuCARD2 magnets
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
Future Magnets Report from WP10
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
EuCARD2 Magnet Status and action plan
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
HFM-WP7 Status, FK & GdR, April WP7 HFM Status F. Kircher (CEA Saclay) and Gijs de Rijk (CERN) EuCARD Annual meeting RAL, April 2010.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
Wound Conductor Test Facilities (TASK 2) (Short status…) Friedrich Lackner 2 nd of September 2015 FUTURE CIRCULAR COLLIDER MAGNETS TECHNOLOGIES.
Eucard2 – WP10 Future Magnets Philippe Fazilleau & Lucio Rossi WP10 kick off meeting CERN, 14 June 2013.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP10- Future Magnets.
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
HTS insert magnet design: Stack Cable Johnny Himbele, Arnaud Badel, Pascal Tixador 1.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
HTS Roebel cables for the EuCARD2 “Future Magnets”
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
TABLE IV Stress Evolution in the External Tube for Je = 250 A/mm²
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
Task 5: High-Tc superconducting link Summary of work-package
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Lucio Rossi (CERN) WP10 coordinator
The R&D programme on High Field Magnets (HFM)
CSP 25th November 2010 Technical agreement number 3: overview
Task T HTS Dipole Magnet Design and Construction
WP-7 / Task 4 Very high field magnet
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Tiina Salmi, Tampere University of Technology
Naoyuki Amemiya Kyoto University
Kyoto meeting.
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
EuCARD2 WP 10.2 HTS Conductor
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
Qingjin XU Institute of High Energy Physics (IHEP),
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

Task 10.3 : 5T HTS Dipole Magnet Design and Construction Kick off meeting WP 10 Maria DURANTE, Glyn KIRBY 14/06/2013 EuCARD² WP10 kick off meeting | 14/06/2013

Task 10.3 objectives Subtask 10.3.1 HTS accelerator magnet design Explore magnet concepts suitable for HTS cable and ribbon based conductors providing magnetic field of accelerator quality in view of the 20 T HE-LHC dipole. Compare saddle winding design with block winding design. Study the maximum attainable stress level in both magnetic configurations. Adapt the protection scheme of superconducting magnet to the use of HTS conductor. Subtask 10.3.2 Bi-2212 magnet developments Design and manufacture a prototype magnet using Bi2212 cable. This prototype will be intended to manage the wind and react manufacturing operation and to determine the highest stress allowable on such a cable. Bi-2212 dipole prototype must be designed to achieve 5T alone, or 20T as an insert, or to measure the limiting stresses on this material. Subtask 10.3.3 YBCO magnet developments Design and manufacture an accelerator like prototype magnet using YBCO tape based conductor carrying at least 5kA at 4.2 K and 20 T. Study field homogeneity and current redistribution in the ribbon based conductor. Develop and test thin (5-30 μm) insulation systems compatible with coil epoxy impregnation. EuCARD² WP10 kick off meeting | 14/06/2013

Task 10.3 DELIVERABLE AND MILESTONES EuCARD² Deliverable and milestones D10.1 Conceptual study of HTS accelerator magnets (report) M18 31/10/2014 The report must contain all key elements of the novel magnet design, considering electromagnetics, mechanical, thermal, stability and protection aspects. MS64 YBCO magnet design report M18 31/10/2014 MS68 Technical and economical comparison YBCO/Bi2212 magnets M36 30/04/2016 Internal milestones proposal IMS01 Inputs for magnet HTS design M3 31/07/2013 HTS dipole constraints Bi2212 conductor objectives YBCO conductor objectives IMS02 HTS magnet(s) detailed design M24 30/04/2015 IMS03 HTS magnet(s) built M40 31/08/2016  D10.4 for task 10.4 : Magnet Cold test M44 31/12/2016 EuCARD² WP10 kick off meeting | 14/06/2013

SCHEDULE PROPOSAL EuCARD² WP10 kick off meeting | 14/06/2013

PartICIPANTS (froM Budget files) Beneficiary short name (all costs in €) Person-Months on Task 10.3 Consumable and prototype direct costs Travel direct costs CERN 24 150 000 12 000 CEA 34 8 000 INPG 19 4 000 INFN 4   2 000 TUT 10 10 000 DTI 8 20 000 Total: 99 332 000 40 000 EuCARD² WP10 kick off meeting | 14/06/2013

Task 10.3 PARTIPANTS list 1/2 CEA CERN INP Grenoble Maria Durante, maria.durante@cea.fr, HTS magnets, link with Tasks 10.2 and 10.4 Philippe Fazilleau, philippe.fazilleau@cea.fr, design, protection studies Mélanie Devaux, melanie.devaux@cea.fr, design options studies, magnet realization Jean-Michel Rey, j-m.rey@cea.fr, design option studies 2 engineers for electromagnetics and mechanical design, tbd For information : Jean-Michel Rifflet, jean-michel.rifflet@cea.fr CERN Glyn Kirby , Glyn.Kirby@cern.ch, overview structural assembly ideas, main CERN contact Jeroen Van Nugteren, jeroen.van.nugteren@cern.ch, PhD, coil optimization INP Grenoble Pascal Tixador, main INPG contact Arnaud Badel arnaud.badel@grenoble.cnrs.fr John Himbele johnnyhimbele@hotmail.com, PhD starting next September EuCARD² WP10 kick off meeting | 14/06/2013

Task 10.3 PARTIPANTS list 2/2 INFN Milano Giovanni Volpini, giovanni.volpini@mi.infn.it, main INFN contact Massimo Sorbi, massimo.sorbi@mi.infn.it, protection studies Tampere University of Technology, TUT Antti Stenvall, antti.stenvall@tut.fi, main TUT contact Erkki Härö, erkki.haro@tut.fi, PhD Danish Technological Institute, DTI Nikolaj Zangenberg, nzg@dti.dk, technical responsible, main DTI contact 1 coating/insulation expert tbd For information : John O. Mortensen, jhm@dti.dk EuCARD² WP10 kick off meeting | 14/06/2013

WP10.3 contributions Institute CEA CERN INPG TUT DTI INFN Contact Maria Durante Glyn Kirby Pascal Tixador Antti Stenvall Nikolaj Zangenberg Giovanni Volpini Activities Design and construction of YBCO made coil, development of proper technology Participation to design of Bi-2212 coil Design and support to construction of the YBCO Design and construction of Bi-2212 coil in the collaboration with USA, development of proper technologies System for magnetic measurement evaluation Design of HTS coils Analysis of e.m. behavior Development of technology (small coils for investigation, tests under high fields) Modeling of HTS coil both YBCO and Bi-2212 Quench analysis and protection evaluation Development of insulation technology for YBCO conductor Fabrication and test of samples and then of all tapes/cable Study of extension to Bi-2212 Quench computation Link to testing boundary conditions EuCARD² WP10 kick off meeting | 14/06/2013

Next steps To start magnet design options studies we need : to know the objectives for YBCO and Bi-2212 conductors as a starting point for magnet design options to define the parameter list for the magnet(s) to define preliminary tests necessary to validate possible design options (modulus measurements, bending tests, Ic measurements under compression, joints configuration, ..) An initial phase of studies of magnet configurations should start this summer. We would like to organize a brainstorming meeting (face-to-face or video) before the end of July. The objective is to share and discuss our ideas and experiences on HTS magnets and produce a state of the art picture, with a set of magnet configuration options to be studies in the following months. Please let us know your availability for a video conference between July 18th and July 25th. EuCARD² WP10 kick off meeting | 14/06/2013

THANKS FOR YOUR ATTENTION Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 71 27 | F. +33 (0)1 69 08 69 49 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019 DSM IRFU SACM EuCARD² WP10 kick off meeting | 14/06/2013