SVT – SuperB Workshop – SLAC 6-9 Oct 2009

Slides:



Advertisements
Similar presentations
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Advertisements

Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
SuperB Detector Summary SuperB Miniworkshop, Oxford 18/19 th May 2011
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
M. Gilchriese ATLAS Pixel Upgrade Thoughts on US Role.
UK Activities on pixels. Adrian Bevan 1, Jamie Crooks 2, Andrew Lintern 2, Andy Nichols 2, Marcel Stanitzki 2, Renato Turchetta 2, Fergus Wilson 2. 1 Queen.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
1 R&D Advances: SiW Calorimeter LCWS 2010 Beijing SiD Concept Meeting March 28, 2010 John Jaros for SiD SiW Group (thanks to Ray, Ryan, Mani, and Marco.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 Blair Ratcliff SLAC Detector R&D: Overview and Opportunities Detector Overview (some old news!). Present.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Status Report of the SVT external layers Lorenzo Vitale University and INFN Trieste.
F. Bosi, M.Massa SuperB Workshop, Isola d’Elba May 28 – June2, 2011, 11 Layer0 - SVT Mechanics F. Bosi – M.Massa INFN-Pisa on behalf of the SuperB SVT.
1 1F.Bosi, M.Massa, SuperB Meeting, Isola d’Elba, May 31, 2008 Update on Thin Mechanics/Cooling R&D for the Layer 0 of the SuperB Factory F. Bosi - M.
Highlights from the VTX session Marc Winter & Massimo Caccia R&D reports: – DEPFET (M. Trimpl) – CCD (S. Hillert) – UK-CMOS (J.Velthuis) – Continental-CMOS.
Update on the activities in Milano M. Citterio and N. Neri on behalf of INFN and University of Milan SuperB Meeting: SVT Parallel Session.
L. Bosisio - 2nd SuperB Collaboration Meeting - Frascati SuperB SVT Update on sensor and fanout design in Trieste Irina Rashevskaya, Lorenzo.
G. RizzoSVT Meeting – April, SVT Update SVT bi-weekly Meeting - April, Giuliana Rizzo Universita’ & INFN Pisa Group Organization & WBS.
G. RizzoSVT Status – SuperB Workshop, SLAC Oct SVT- Status Update on R&D activities for TDR X SuperB General Meeting Workshop SLAC – Oct. 6-9,
The SuperB Silicon Vertex Tracker Abstract : The SuperB project aims to build an asymmetric e+ - e- collider capable of reaching.
F. Bosi -SuperB Collaboration Meeting, QMUL, 13 – 16 September SVT Mechanics F. Bosi INFN-Pisa on behalf of the SuperB SVT Group.
G. RizzoSVT - SuperB Workshop – Paris 16 Feb SVT Plans for TDR Activities since Elba Meeting Plans for TDR preparation Giuliana Rizzo Universita’
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Update on & SVT readout chip requirements
IFR Detector R&D status
SVT – SuperB Workshop – Annecy March 2010
Roberto Calabrese Ferrara University and INFN
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
M. Manghisoni, L. Ratti Università degli Studi di Pavia INFN Pavia
Valerio Re INFN Pavia and University of Bergamo
F. Bosi INFN-Pisa on behalf of the SuperB SVT Group
10-12 April 2013, INFN-LNF, Frascati, Italy
Giuliana Rizzo INFN and University, Pisa on behalf of SVT-SuperB group
SVT Parallel-SuperB Workshop Perugia, June
Update on SVT electronics
SVT subchapters & editors
Technical Design for the Mu3e Detector
Preliminary thoughts on SVT services
BaBar Silicon Tracker Perspective
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Update on the SVD construction
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Layer0 - SVT Mechanics update (MDI meeting)
S.Bettarini On behalf of the SuperB-SVT
IFR Status Summary W. Baldini on behalf of the IFR Group
Hybrid Pixel R&D and Interconnect Technologies
SVT front-end electronics
SVT Mechanics Baseline SuperB SVT configuration
Workshop Goals for the Detector Groups
detector development readout electronics interconnects bump bonding
Update on SVT activities
TK Upgrade report.
SVT-Attivita’ e preventivi INFN 2012
The SuperB Silicon Vertex Tracker
SuperB SVT Definition of sensor design and z-side connection scheme
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
WG4 – Progress report R. Santoro and A. Tauro.
Work packages status in Torino and perspectives
3rd Workshop on SuperB SLAC June , 2006
SVT detector electronics
SVT detector electronics
SVT- Status Update on R&D activities for TDR
General Introduction to IFR
SVT detector electronics
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

SVT – SuperB Workshop – SLAC 6-9 Oct 2009 SVT-Update R&D work organized to prepare a baseline for TDR with: Layer0 based on hybrid pixels hot issues to match SuperB specs: 50x50 mm2 pitch + fast readout Light pixel module support & cooling Pixel module interfaces (Al Bus & fast links) Layer1-Layer5 similar to BaBar SVT Layout Optimization & Design Continue R&D on thin pixel options MAPS with new cell under test (LAB & beams) Continue MAPS irradiation studies Wait for first 3D MAPS device (now in production) Background studies detector & beam pipe design SVT Mechanics Fast Simulation studies (DGWG & FastSim sessions) Impact of L0 efficiency on TD measurements (N. Neri) dE/dx implemented for SVT (J. Walsh) G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009

Plans for Hybrid Pixel (I) Produce & test a prototype front-end chip for high resistivity pixels with 50x50 um2 pitch & fast enough readout (background rate ~ 100 MHz/cm2) - Front-end Chip & Pixel sensor matrix layout almost completed both in production from Oct ‘’09 - FE chip: ST 130 nm process, Sensors: FBK-IRST - Sensor + chip bump-bonding next spring (IZM-Berlin)  Testbeam Sept. 2010. FE chip Layout (32x128) – preliminary Details on the FE chip and pixel sensor Matrix today and tomorrow - SVT I and SVT II parallel sessions. 50 mm Cell Layout Thanks to the effort of all the designers (PV/BG-BO-PI) Fabio Morsani is closing the layout as we speak! G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009

Plans for Hybrid Pixel (II) PAD on test chip positioned to allow single chip on carrier test but also production of a multichip pixel module: - 3 chips + pixel sensor matrix + Al bus + support with integrated cooling. Pixel module 2 or more chips + sensor and Al pixel bus. Update on pixel bus & pixel module interfaces – M. Citterio Update on Layer0 support & cooling – F. Bosi G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009

Light pixel module support & cooling F.Bosi’s talk Light pixel module support & cooling Light support with integrated cooling needed for pixel module: P=2W/cm2 Carbon Fiber support with microchannel for coolant fluid developed: Total support/cooling thickness = 0.28 % X0 (reduction to 0.2% X0 possible) 12.8 mm Prototypes characterized in the Thermo-fluid-dynamics LAB in Pisa varying the specific input power (1-3W/cm2) Measurements confirmed FEA simulation results: T_meas=30-360C @ P=2W/cm2 Measured Temperature along the module T(FEA)=320C @ P=2W/cm2 G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009

SVT – SuperB Workshop – SLAC 6-9 Oct 2009 Other SVT activities July 2009 CERN Testbeam New MAPS testbeam in July 2009 (analysis under way). Tested Devices: Analog MAPS (50x50 um pitch) pre/post irradiation (10 Mrad), New MAPS cell 40x40 um pitch S.Bettarini’s talk on Wed. @ 8:30 (SVT II) apsel3T1 Some progress in Background Simulation Hit rate, Radiation Dose, equivalent fluency plots produced for all SVT layers. Machinery is now in place! - R. Cenci’s talk on Wed. @ 10:30 (SVT III) Different beampipe & L0 configurations studied: Rates in L0 still very high. Need some optimization. Activity on strip layers design (L1-L5) has started in Trieste L. Vitale’s talk on Wed. @ 8:30 (SVT II) UK groups (RAL/QMUL) expressed interest in the SVT R&D for TDR F. Wilson’s talk on Wed. @ 10:30 (SVT III) G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009

SVT – SuperB Workshop – SLAC 6-9 Oct 2009 Tech. Board Meeting Perugia - June 2009 SVT Milestones (I) Oct. 2009 Front-end chip (ST) & pixel sensor (FBK) submission - OK Simplified Al pixel bus produced (CERN)  NOV ‘09 Thermal/mechanical characterization of pixel module support (CF with microchannels) - OK SVT internal geometry definition - ongoing Dec. 2009 Definition of HDI and links specification (chip-to-HDI and HDI-to-DAQ) L1-L5 module components specs definition (front-end chip, fanout, sensor) Conceptual design Layer0 support & beam pipe Conceptual design of SVT mechanical support G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009

SVT – SuperB Workshop – SLAC 6-9 Oct 2009 Tech. Board Meeting Perugia - June 2009 SVT Milestones (II) Apr. 2010 Results on lab. test of front-end chip for Hybrid Pixel Tests on the full pixel module links (by means of FPGAs+Al-BUS+copper/fiber link) L1-L5 module design TDR SVT chapter assignment  start writing Sept 2010 Beam pipe design SVT + Layer0 support design Beam test of Hybrid pixel chip+sensor (if ready!) TDR final writing G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009

Agenda of the SVT Parallels Tuesday 6 Oct. 16-17:30 Introduction – G. Rizzo Update on MAPS activities & FE4D32x128 chip analog cell - G. Traversi (PV/BG) Hybrid pixel readout chip: FE4D32x128 A. Gabrielli (BO) Wednesday 7 Oct 8:30-10:00 First results on analog MAPS from July CERN Testbeam – S. Bettarini (PI) Update on pixel bus & pixel module interfaces – M. Citterio (MI) Update on Pixel Sensor design – G. Dalla Betta (TN) Strip layer design: first considerations – L. Vitale (TS) Wednesday 7 Oct 10:30-12:00 UK Activities & Plans – F. Wilson (RAL) Layer0 support & SVT Mechanics– F. Bosi (PI) Update on SVT Background evaluation – R. Cenci (PI) G. Rizzo SVT – SuperB Workshop – SLAC 6-9 Oct 2009