Task T HTS Dipole Magnet Design and Construction

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
EuCARD2 Magnet Status and action plan
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
HFM-WP7 Status, FK & GdR, April WP7 HFM Status F. Kircher (CEA Saclay) and Gijs de Rijk (CERN) EuCARD Annual meeting RAL, April 2010.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
Manufacturing contracts for RFQ
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
Eucard2 – WP10 Future Magnets Philippe Fazilleau & Lucio Rossi WP10 kick off meeting CERN, 14 June 2013.
RISK REGISTER Management & Engineering
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
SLHC –PP WP6 LHC IR Upgrade - Phase I.
11 T Dipole Integration & Plans M. Karppinen
Lucio Rossi (CERN) WP10 coordinator
The R&D programme on High Field Magnets (HFM)
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
WP-7 / Task 4 Very high field magnet
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
XFEL Tuner system non-conformities Detected At saclay
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
EuCARD2 WP 10.2 HTS Conductor
CEA Nb3Sn quadrupole magnet : test results and future
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
MID: A MetaCASE Tool for a Better Reuse of Visual Notations
QXF schedule and milestones
3rd Workshop on dynamic fuel cycle Timothée Kooyman, DEN,DR,SPRC,LE2C
F. Peauger (mainly for CM components)
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Qingjin XU Institute of High Energy Physics (IHEP),
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

Task 10.3 5 T HTS Dipole Magnet Design and Construction Pre-kick off meeting WP 10 | Maria DURANTE 23/04/2013 CEA | 23/04/2013

10.3 subtasks Subtask 10.3.1 HTS accelerator magnet design Explore magnet concept suitable for HTS cable and ribbon based conductors providing magnetic field of accelerator quality in view of the 20 T HE-LHC dipole Subtask 10.3.2 Bi2212 magnet developments Design and manufacture a prototype magnet using Bi2212 cable. This prototype will be intended to determine the highest stress allowable on such a cable and manage the wind and react manufacturing operation Subtask 10.3.3 YBCO magnet developments Design and manufacture an accelerator like prototype magnet using YBCO tape based conductor and having an operating current of at least 5 kA. Thin (5-30 μm) HTS tape insulation that is compatible with coil epoxy impregnation will be tested CEA | 23/04/2013

DELIVERABLES AND MILESTONES (from DoW) D10.1 Conceptual study of HTS accelerator magnets (report) M18 Task 10.3 MS64 YBCO magnet design report M18 Task 10.3 MS68 Technical and economical comparison YBCO/Bi2212 magnets M36 Task 10.3 MS62 Organized collaboration with DOE Program Bi-2212 M12 Task 10.1 ? MS63 Cable concept design report M12 Task 10.2 D10.2 Prototype cable lengths and report M24 Task 10.2 MS65 Test Station Kick-off M26 Task 10.4 D10.3 Parameters for choice of SC type M28 Task 10.1 MS66 First Cable length for magnet winding M32 Task 10.2 MS67 Report on HE-LHC Main Dipole design M36 Task 10.1 ? D10.4 Magnet Cold test M44 Task 10.4 Bi2212 magnet design report M18 ? YBCO accelerator like prototype magnet M38 ? Bi2212 dipole magnet M38 ? CEA | 23/04/2013

PartICIPANTS (froM Budget files) Beneficiary short name (all costs in €) Person-Months Consumable and prototype direct costs Travel direct costs CERN 24 150 000 12 000 CEA 34 8 000 INPG 19 4 000 INFN 4   2 000 TUT 10 10 000 DTI 8 20 000 Total: 99 332 000 40 000 We have to define who, what and when. And define who is the contact for each institute concerning Task 3. CEA | 23/04/2013

Participants / SCHEDULE CEA | 23/04/2013

PaRTICIPANTS / SCHEDULE Nom de la tâche Durée estimée Participants 5 T dipole magnet design magnet design options study 12 months cea, cern conductor definition cea,cern, ipng magnet detailed design 6 months cea, cern, dti, tut, infn assembling process design cea, cern, dti, infn CAD detailed design cea tooling design Cea,cern, dti components and tooling procurement dipole parts procurement tooling procurement manufacturing and tests Bi-2212 magnet manufacturing 8 months YBCO accelerator like magnet manufacturing stand alone HTS magnet testing infn, cea HTS Insert tests in outsert CEA | 23/04/2013

Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 71 27 | F. +33 (0)1 69 08 69 49 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019 DSM IRFU SACM CEA | 23/04/2013