Transmission Workstream February 2009

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Code Administration Code of Practice Tim Davis KPIs Q
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Proposer: Matthew Hatch Panel Date: 20/10/16
Entry Capacity Overrun price calculation
Modification Proposal 0283 Update
Transmission Workgroup 7th July 2011
Exit Capacity User Commitment – Transmission Workstream update
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Code Governance Review UNC Modification Proposals
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Entry Capacity - update
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
Simon Trivella – 22nd May 2008 Distribution Workstream
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Consideration of issues raised by UNC Modification Proposal 0244
Impacts of Project Nexus Implementation Date to AQ17
Modification 0333A – implementation info
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Credit Modification Proposals Update
DN Interruption & Charging
Proposer: Transporter /
Interruptible to Firm – NTS Supply Point Transition
Mod Proposal 0268 : AQ Backstop Date
Draft Mod: Update of default System Marginal Prices
Transmission Workstream 1st September 2005
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum DN Interruption Update - Introduction
Richard Fairholme Transmission Workstream 4th September 2008
Assured Pressures Proposal
Consideration of issues raised by UNC Modification Proposal 0244
Mark Freeman 29th January 2007
CUSC “Alternate” Proposal process
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Flat, flex, assured pressures Network Development Statement
UK Link Manual Update (UNC Modification 0613)
Information Provision for Transitional Exit Capacity
Transmission Workstream DN Interruption Update - Introduction
APX OCM Collateralisation
Transmission Workstream, 1 Mar 07
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Dis 1208: Mod The ability and requirement for Users and Transporters to raise issues to be considered by the Allocation of Unidentified Gas Expert.
Transmission Workstream 4th December 2008
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Transmission Workstream February 2009 Proposed revision to DN Interruption timeframes in Annual Interruption Invitation Transmission Workstream February 2009

Current rules DN requests Interruption offers, based on typical 3 year lead time to re-inforce its Network if interruption offers are not economic. UNC currently precludes DNs seeking Interruption offers in Annual Interruption window where lead time for re-inforcement is less than 3 years

Proposed change to UNC to allow this option Current UNC text G 6.2.2 In each Gas Year (Y) a DN Operator shall invite Interruption Offers by Users in respect of each of Gas Years Y+4 to Y+8 inclusive (each a separate Interruptible period) by an annual Interruption Invitation…. Proposed UNC text in Mod to be raised by NGN In each Gas Year (Y) a DN Operator shall invite Interruption Offers by Users in respect of each of Gas Years Y+4 to Y+8 inclusive, and may invite Interruption Offers in respect of Gas Years Y+1 to Y+3 inclusive (each a separate Interruptible period) by an annual Interruption Invitation….

Timeframe January 29th – Distribution workstream February 5th – Transmission workstream February 19th- UNC panel (consultation?) Implementation May 1st to assist in promoting 2009 Interruption Offers in June 2009.